Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20134H236 + (ML20134H236)
- ML20134H237 + (ML20134H237)
- NSD-NRC-96-4869, Forwards Advanced Copy of Revised Section 2,focused PRA Study of WCAP-13856, AP600 Implementation of Regulatory Treatment of NonSafety-Related Sys Process + (ML20134H238)
- ML20134H239 + (ML20134H239)
- ML20134H240 + (ML20134H240)
- ML20134H241 + (ML20134H241)
- ML20134H242 + (ML20134H242)
- 05000482/LER-1988-028-01, :on 881209,individual Received Skin Dose in Excess of Limits.Caused by Unexpected Hot Particle Contamination.Review of Hot Particle Contamination Control Program Performed to Address Concerns + (ML20134H243)
- ML20134H246 + (ML20134H246)
- ML20134H247 + (ML20134H247)
- ML20134H248 + (ML20134H248)
- ML20134H249 + (ML20134H249)
- 05000482/LER-1988-028, Partially Deleted LER 88-028-00:on 881209,0.7093 Uci Co-60 Removed from Chin.Caused Likely When Individual Deposited Tools Just Prior to Exiting Containment.Surveys Taken in Area for Hot Particles + (ML20134H250)
- ML20134H251 + (ML20134H251)
- ML20134H252 + (ML20134H252)
- IA-96-525, Final Response to FOIA Request for Documents.Records in App a Encl & Will Be Available in PDR + (ML20134H252)
- ML20134H253 + (ML20134H253)
- ML20134H254 + (ML20134H254)
- ML20134H256 + (ML20134H256)
- ML20134H257 + (ML20134H257)
- PY-CEI-NRR-2108, Forwards Response to Request for Info on Porous Concrete sub-foundation + (ML20134H258)
- ML20134H259 + (ML20134H259)
- ML20134H261 + (ML20134H261)
- ML20134H263 + (ML20134H263)
- ML20134H265 + (ML20134H265)
- ML20134H266 + (ML20134H266)
- ML20134H267 + (ML20134H267)
- 05000277/LER-1996-010-01, :on 961006 & 1015,two Automatic Reactor Shutdown Occurred as Result of Main Generator Trip & Lockout Due to Actuation of Negative Sequence Current Protective Relay.Relay Replaced W/Relay of Newer Design + (ML20134H268)
- ML20134H269 + (ML20134H269)
- ML20134H270 + (ML20134H270)
- ML20134H271 + (ML20134H271)
- ML20134H272 + (ML20134H272)
- ML20134H273 + (ML20134H273)
- B15953, Submits Response to Request for Addl Info Re Porous Concrete sub-foundation.FSB Located on East Side of Reactor Containment Bldg & Two Foundation Structures + (ML20134H274)
- ML20134H275 + (ML20134H275)
- ML20134H276 + (ML20134H276)
- ML20134H277 + (ML20134H277)
- ML20134H278 + (ML20134H278)
- ML20134H279 + (ML20134H279)
- ML20134H280 + (ML20134H280)
- ML20134H281 + (ML20134H281)
- NRC-96-0092, Failure of RHR Svc Water Reservoir cross-connect Valve to Open as Required to Satisfy TS Lco. Commitments Made as Submitted + (ML20134H282)
- ML20134H284 + (ML20134H284)
- L-96-024, Forwards Revs to Security Plan for Pbnp.Encl Withheld + (ML20134H286)
- ML20134H287 + (ML20134H287)
- JAFP-96-0448, Monthly Operating Rept for Oct 1996 for Ja FitzPatrick Nuclear Power Plant + (ML20134H288)
- ML20134H289 + (ML20134H289)
- ML20134H293 + (ML20134H293)
- ML20134H294 + (ML20134H294)
- ML20134H296 + (ML20134H296)
- ML20134H297 + (ML20134H297)