Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20133C556 + (ML20133C556)
- ML20133C557 + (ML20133C557)
- ML20133C558 + (ML20133C558)
- ML20133C559 + (ML20133C559)
- ML20133C560 + (ML20133C560)
- ML20133C562 + (ML20133C562)
- ML20133C563 + (ML20133C563)
- ML20133C564 + (ML20133C564)
- ML20133C565 + (ML20133C565)
- ML20133C567 + (ML20133C567)
- ML20133C568 + (ML20133C568)
- ML20133C569 + (ML20133C569)
- 05000280/LER-1985-011, :on 850626,while Racking Charging Pump B Breaker 15J5 Out for Pump Maint,Normal Feeder Breaker 15H6 for Operating Charging Pump C Tripped Due to Electrical Interlock.Caused by Inadequate Precautions + (ML20133C570)
- ML20133C572 + (ML20133C572)
- ML20133C573 + (ML20133C573)
- ML20133C574 + (ML20133C574)
- ML20133C575 + (ML20133C575)
- ML20133C576 + (ML20133C576)
- ML20133C577 + (ML20133C577)
- ML20133C579 + (ML20133C579)
- ML20133C580 + (ML20133C580)
- ML20133C582 + (ML20133C582)
- 05000336/LER-1996-038, Forwards LER 96-038.Commitments Made Re LER Submitted + (ML20133C584)
- ML20133C585 + (ML20133C585)
- ML20133C586 + (ML20133C586)
- ML20133C587 + (ML20133C587)
- B11754, Requests Exemption from Requirements of 10CFR50,App J, Section D.2.b.ii.Proposed Surveillance Procedure 4.6.1.3.a Worded to Require Air Door Seal Leak Checks within 3 Days of Every Period of Air Lock Use + (ML20133C588)
- 05000336/LER-1996-038-02, :on 961202,inadequate Surveillance Procedure Used to Verify EDG Operability.Caused by Failure to Properly Incorporate TS SRs During Recent Revs of Monthly EDG Tests. Changed EDG Surveillance Procedures + (ML20133C589)
- ML20133C591 + (ML20133C591)
- ML20133C592 + (ML20133C592)
- AECM-85-0265, Forwards Response to Item 3.2 of Generic Ltr 83-28 Re post-maint Testing of safety-related Components.Response for Item 4.5.3 Will Be Provided within 90 Days of NRC Issuance of Evaluation of BWR Owners Group Rept + (ML20133C594)
- ML20133C595 + (ML20133C595)
- ML20133C596 + (ML20133C596)
- ML20133C599 + (ML20133C599)
- ML20133C600 + (ML20133C600)
- ML20133C602 + (ML20133C602)
- ML20133C603 + (ML20133C603)
- ML20133C604 + (ML20133C604)
- ML20133C605 + (ML20133C605)
- ML20133C607 + (ML20133C607)
- ML20133C608 + (ML20133C608)
- IR 05000324/1985030 + (ML20133C610)
- ML20133C611 + (ML20133C611)
- ML20133C612 + (ML20133C612)
- IA-85-390, Responds to FOIA Request for Exam Summary Sheets for 10 Plants.Documents Available in PDR Under FOIA-85-236 + (ML20133C612)
- ML20133C616 + (ML20133C616)
- ML20133C617 + (ML20133C617)
- ML20133C620 + (ML20133C620)
- ML20133C621 + (ML20133C621)
- ML20133C622 + (ML20133C622)
- ML20133C623 + (ML20133C623)