ML20133C620
| ML20133C620 | |
| Person / Time | |
|---|---|
| Site: | La Crosse File:Dairyland Power Cooperative icon.png |
| Issue date: | 10/02/1985 |
| From: | Shafer W NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Taylor J DAIRYLAND POWER COOPERATIVE |
| Shared Package | |
| ML20133C623 | List: |
| References | |
| NUDOCS 8510070468 | |
| Download: ML20133C620 (2) | |
See also: IR 05000409/1985015
Text
..
-
.. .
OCT 0 21985
Docket No. 50-409
Dairyland Power Cooperative
ATTN:
Mr. J. W. Taylor
General Manager
2615 East Avenue - South
La Crosse, WI 54601
Gentlemen:
This refers to the routine safety inspection conducted by Mr. D. E. Miller of
this office on September 16-20, 1985, of activities at Lacrosse Boiling Water
Reactor authorized by NRC Operating License No. DPR-45 and to the discussion of
our findings with Mr. Shafer and other members of your staff at the conclusion
of the inspection.
The enclosed copy of our inspection report identifies areas examined during the
inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
i
!
interviews with personnel.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as described in the enclosed Appendix.
The
inspection showed that action had been taken to correct the identified
noncompliance and to prevent recurrence.
Consequently, no reply to this
noncompliance is required and we have no further questions regarding this
i
matter at this time.
l
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosures will be placed in the NRC's Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
$2
' Original signed by W.p. Shafer"
W. D. Shafer, Chief Emergency
.
Preparedness and
!
Radiological Protection Branch
i
Enclosures:
'
1.
Appendix, Notice
of Violation
2.
Inspection Report
()O
No. 50-409/85015(DRSS)
@
See Attached Distribution
9
$
i
t
L
.-
.
I
i
OCT 0 2 i985
'
Dairyland Power Cooperative
-F-
i
Distribution
i
cc w/ enclosures:
J. Parkyn, Plant Superintendent-
DCS/RSB (RIDS)
Licensing Fee Management Branch
Resident Inspector, RIII
John J. Duffy, Chief.
.
Boiler Section
Ness Flores, Chairperson
'
Wisconsin Public Service
. Commission
Spark Burmaster, Coulee
Region Energy Coalition
1
RI
RII
RIII o
RI
Mille /as
Gr er
Boyd
Sh dd
10/02/85
L