Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B827 + (ML20132B827)
- RBG-21443, Forwards Revs to FSAR & Tech Specs in Response to Auxiliary Sys Branch Concern Re Standby Liquid Control Sys Discussed During Tech Spec Review + (ML20132B828)
- RBG-21485, Forwards Revs to FSAR Section 8.3 Re Final Loading Info for Standby Diesel Generators.No Addl Impact Expected on FSAR or Proposed Tech Specs.Revs Will Be Included in Future FSAR Amend + (ML20132B829)
- ML20132B830 + (ML20132B830)
- ML20132B831 + (ML20132B831)
- ML20132B833 + (ML20132B833)
- ML20132B834 + (ML20132B834)
- ML20132B835 + (ML20132B835)
- ML20132B836 + (ML20132B836)
- ML20132B837 + (ML20132B837)
- ML20132B838 + (ML20132B838)
- ML20132B839 + (ML20132B839)
- ML20132B840 + (ML20132B840)
- ML20132B841 + (ML20132B841)
- VPN-080-96, Forwards Rev 20 to PGE-8010, Trojan Nuclear Plant QA Program + (ML20132B842)
- ML20132B844 + (ML20132B844)
- ML20132B845 + (ML20132B845)
- 05000255/LER-1984-023, :on 841109,determined That Reactor Protection Low Flow Trip for Four Primary Coolant Pumps Operation Set Incorrectly.Caused by Nonperformance of Calibr Procedure. Calibr Procedure Performed + (ML20132B846)
- ML20132B847 + (ML20132B847)
- ML20132B849 + (ML20132B849)
- ML20132B851 + (ML20132B851)
- ML20132B853 + (ML20132B853)
- 05000423/LER-1996-046-01, :on 961108,time Response of Containment Fuel Drop Radiation Monitor Less Conservative Then Value Assumed within Fsar.Caused by Inadequate Original Design & Failure of Surveillance Test Program.Design Reviewed + (ML20132B854)
- IR 05000805/2009001 + (ML20132B856)
- PY-CEI-NRR-2109, Forwards Details & Bases for Change to Eliminate Corporate Health Physicist Position & marked-up Pp from Chapter 17.2 of USAR + (ML20132B860)
- ML20132B862 + (ML20132B862)
- ML20132B865 + (ML20132B865)
- ML20132B866 + (ML20132B866)
- ML20132B868 + (ML20132B868)
- ML20132B870 + (ML20132B870)
- ML20132B871 + (ML20132B871)
- ML20132B872 + (ML20132B872)
- ML20132B873 + (ML20132B873)
- ML20132B874 + (ML20132B874)
- ML20132B875 + (ML20132B875)
- HL-5275, Forwards Response to Comments Re QA Program Change Submittal.Revised QA Program Change Submittal W/ Corresponding marked-up FSAR Pages Included in Encl 2 + (ML20132B877)
- ML20132B880 + (ML20132B880)
- ML20132B884 + (ML20132B884)
- ML20132B885 + (ML20132B885)
- ML20132B886 + (ML20132B886)
- 05000341/LER-1985-027, :on 850617,outboard Primary Containment Isolation Valve G33F004 of Reactor Water Cleanup Sys Closed Causing Both Pumps to Trip.Cause Not Found.Valve Isolation Logic Reset + (ML20132B887)
- ML20132B888 + (ML20132B888)
- ML20132B889 + (ML20132B889)
- ML20132B890 + (ML20132B890)
- ML20132B891 + (ML20132B891)
- RBG-22-146, Application for Amend to License NPF-40,revising Tech Specs to Increase Rated Steady State Voltage from 115% to 130% During HPCS Diesel Generator Surveillance Tests.Fee Paid + (ML20132B892)
- ML20132B893 + (ML20132B893)
- ML20132B894 + (ML20132B894)
- 05000352/LER-1985-063, :on 850712,during Cold Shutdown,Esf Actuation Occurred.Caused by Broken Sample Tape of Chlorine Analyzer C (AE-78-016C) Due to Design Defect.Tape Repaired.Analyzer Tested & Returned to Svc + (ML20132B895)
- LIC-96-0194, Submits SG Tube Plugging Rept for Plant.Specific Details in Regard to SG Tube Plugging Will Be Provided in Six Month Rept Required by TS 3.17(5)(ii) + (ML20132B896)
- ML20132B897 + (ML20132B897)