Forwards LER 84-023-03.Commitment to Determine Revised Three Pump,Low Primary Coolant Sys Flow Trip Setpoint by 850930 Delayed.Sufficiently Restrictive Setpoint to Preclude Three Pump Operation Being Maintained
Date released: 05/25/2020 Download: ML20132B836


:on 841109,determined That Reactor Protection Low Flow Trip for Four Primary Coolant Pumps Operation Set Incorrectly.Caused by Nonperformance of Calibr Procedure. Calibr Procedure Performed
ML20132B846
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/19/1985
From: Fenech R
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
References
Download: ML20132B846 (6)
Forwards LER 84-023-03.Commitment to Determine Revised Three Pump,Low Primary Coolant Sys Flow Trip Setpoint by 850930 Delayed.Sufficiently Restrictive Setpoint to Preclude Three Pump Operation Being Maintained
ML20132B832
Person / Time
Site: Palisades Entergy icon.png
Issue date: 09/19/1985
From: Rachel Johnson
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
Download: ML20132B832 (2)