Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129A036 + (ML20129A036)
- ML20129A037 + (ML20129A037)
- ML20129A038 + (ML20129A038)
- ML20129A039 + (ML20129A039)
- ML20129A040 + (ML20129A040)
- ML20129A041 + (ML20129A041)
- ML20129A042 + (ML20129A042)
- ML20129A044 + (ML20129A044)
- ML20129A045 + (ML20129A045)
- ML20129A046 + (ML20129A046)
- 05000361/LER-1985-027, :on 850507,containment Purge Isolation Sys Actuated.Caused by Noise Spike on Containment Area Radiation Monitor 2RT-7856.Detailed Study of Plant Ground Sys in Progress + (ML20129A047)
- ML20129A050 + (ML20129A050)
- ML20129A051 + (ML20129A051)
- ML20129A052 + (ML20129A052)
- ML20129A053 + (ML20129A053)
- ML20129A055 + (ML20129A055)
- IA-85-283, Responds to FOIA Request for Plant Biennial Quality Audits for 1978,1980 & 1982 & Idvp for 1982.No Biennial Quality Audits Performed.Evaluation Rept by Util & Other Documents Listed in App Available in PDR + (ML20129A055)
- ML20129A057 + (ML20129A057)
- 05000315/LER-1985-027, :on 850604,during Hydrostatic Testing,Three 8-inch Diameter Fire Penetrations Found Nonfunctional.Cause for Removal of Silicone Foam Undetermined.Openings Sealed & Safety Evaluation Performed + (ML20129A058)
- ML20129A062 + (ML20129A062)
- ML20129A063 + (ML20129A063)
- ML20129A064 + (ML20129A064)
- ML20129A065 + (ML20129A065)
- ML20129A067 + (ML20129A067)
- ML20129A072 + (ML20129A072)
- ML20129A074 + (ML20129A074)
- ML20129A076 + (ML20129A076)
- ML20129A079 + (ML20129A079)
- 05000333/LER-1985-017, :on 850610,reactor Scram Occurred.Caused by MSIV Closure While in Run Mode Due to Improper Valve Lineup on Steam Flow Instrumentation.Scram Procedures Followed & Personnel Reinstructed + (ML20129A080)
- ML20129A081 + (ML20129A081)
- IR 05000382/1996008 + (ML20129A086)
- ML20129A087 + (ML20129A087)
- ML20129A088 + (ML20129A088)
- ML20129A089 + (ML20129A089)
- ML20129A093 + (ML20129A093)
- ML20129A094 + (ML20129A094)
- ML20129A098 + (ML20129A098)
- ML20129A099 + (ML20129A099)
- ML20129A104 + (ML20129A104)
- ML20129A105 + (ML20129A105)
- ML20129A106 + (ML20129A106)
- ML20129A107 + (ML20129A107)
- ML20129A108 + (ML20129A108)
- ML20129A109 + (ML20129A109)
- 05000423/LER-1996-035, Forwards LER 96-035-00.MOV Calculations Will Be Revised Based on Bounding Application Factor/Pullout Efficiency or MOV Specific Performance Characteristics Prior to start-up from Current Outage + (ML20129A110)
- ML20129A112 + (ML20129A112)
- ML20129A113 + (ML20129A113)
- ML20129A114 + (ML20129A114)
- W3P85-1420, Potentially Reportable Deficiency Rept PRD-180 Re Failure to Maintain Adequate Document Control of Vendor Manuals. Initially Reported on 840918.Submittal of Written Rept on Deficiency Rescheduled for 850801 + (ML20129A115)
- ML20129A116 + (ML20129A116)
- ML20129A118 + (ML20129A118)