_ _ _ _ _ _
!ga a
UMTED STATES i
8 NUCLEAR REGULATORY COMMISSION
\\
o
,E wAsHlNGTON. D. C. 20555 h
\\*****/
MAY 0 61985 Ms. Nina Bell Nuclear Safety Analyst Nuclear Information and Resource Service 1346 Connecticut Avenue, NW 4th Floor IN RESPONSE REFER Washington, DC 20036 TO F01A-84-722
Dear Ms. Bell:
This is a second partial response to your [[letter::05000413/LER-1984-006-02, :on 840806,boron Sampling from Nonoperational Train B of RHR Nd Sys Did Not Provide Representative Sample of Boron Concentration of Reactor Coolant.Caused by Personnel Error.Sampling Valves Realigned|letter dated September 5,1984]], in which you requested, pursuant to the Freedom of Information Act (FCIA), copies i
of documents pertaining to four categories of information regarding a Notice of Violation at the Catawba plant.
The documents listed on the enclosed Appendix D are responsive to your request and are being placed in the NRC Public Document Room (PDR), 1717 H Street, NW, Washington, DC 20555.
You may obtain access to these records by presenting a copy of this letter to the PDR or by requesting folder F01A-84-722 under your name.
Additional records pertaining to your request have been identified in response to a previous FOIA request.
That response is maintained in the PDR in folder F01A-84-424 under the name of Garde.
You may obtain copies of these documents by referring to the above F0IA folder.
The documents listed on the enclosed Appendix E are being withheld in their entirety from public disclosure based upon the exemptions of the F0IA noted next to the descriptions of the documents.
Information withheld pursuant to Exemption (5) is predecisional in nature and ccritins prelininary ad. ice, opiric rs, ar.6 recorrud?t ora of menbers o' E i
Field Office to the Directer, Of fice of Investigations.
Disclosure would inhibit the frank and candid excnange of corvrunications in future deliberations and thus, would not be in the public interest. There is no reasonably segregable factual information.
This predecisional information is being withheld pursuant to Exemption (5) of the F0IA (5 U.S.C. 552(b)(5)) and.
10 CFR 9.5(a)(5) of the Commission's regulations.
Information withheld pursuant to Exemption (7)(D) consists of the name and other identifying information of an individual who is a confidential source who provided information to the NRC during the agency's investigative effort.
Because disclosure of this information would disclose the identity of a confidential source, it u ~-ing withheld from public disclosure pursuant to Exemptien (7)(D) of the F01.% l5 U.S.C. 552(b)(7)(D)) and 10 CFR 9.5(a)(7)(iv) of the Ccmission's regulatic s.
8507270153 850506 PDR FOIA BELL 84-722 PDR
\\,
I Pursuant to 10 CFR 9.15 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure and that its production or disclosure is contrary to the public interest. The person responsible for this denial is Mr. Ben B. Hayes, Director, Office of Investigations.
This denial may be appealed to the Commission within 30 days from the receipt of this letter. Any such appeal must be in writing, addressed to the-Secretary of the Commission, U.S. Nuclear Regulatory Commission, Washington, DC 20555, and should clearly state on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
The staff is continuing to review records subject to your request. We will notify you as soon as possible with regard to the remaining records.
Si
- rely, M. 7elton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated i
l l
l l
l l
f i
(
7 Re: F01A-84-722 APPENDIX D Released in Entirety 1.
08/02/78 Handwritten Notes Re: VX System (18 pages) 2..
08/02/78 Handwritten Notes Re: VX System (18 pages) 3.
02/13/79 Weld Process-Control Sheet (5 pages' l
4.
Various 44 Nonconforming Item Reports (112 pages)
Dates 07/17/79-09/21/81 5.
04/01/80' Guidance - 10 CFR 50.55(e), Construction Deficiency Reporting (15 pages) 6.
07/25/80 Weld Inspection Report (2 pages) 7.
07/25/80 Weld Inspection Report (2 pages) 8.
05/01/81 Weld Process Control Sheets (9'pages) 9.
08/06/81 Handwritten Notes Re: Inspection on Darger (4 pages)
- 10. 08/27/81 Exceptions or Alternatives to R-3A's (3 pages) 11.
09/24/81 Personnel Exit Interview Documentation Form w/ attached Handwritten Note to Bob Re: Weld Ouestion (3 pages) 12.
09/24/81 Weld Process Control Sheet (2 pages) 13.
10/19/81 Weld Process Control Sheet (5 pages) 14.
10/27/81 Weld Process Control Sheet (2 pages) 15.
11/30/81 Handwritten Note (2 pages) 16.
12/08/81 Handwritten Note Re: CPLFOIARequestDelay(1page)
- 17. 01/11/82 Note to J. R. Wells and L. R. Davison from R. A. Morgan Re: Catawba 1-2 w/ attachments Re: Concerns and Q-1A 13165 (5 pages) y
- 18. 01/14/82 Memo to Bob Morgan from Kenneth Karriker Re: Employee l
Recourse (1 page)
}
- 19. 01/18/82 Handwritten Note from V. C. Godfrey (1 page) i
r
- Re: F01A-84-722 Appendix D
- 20. 01/18/82 Handwritten Notes from R. W. Irly Re: Specific Technical Matters (1 page)
- 21. 01/19/82 Handwritten Notes from T. A. Bumgardner Re: Piping Traceability (2 pages)
- 22. 01/19/82 Handwritten Notes to Mr. R. A. Morgan from Ronald Rickland Re: Lack of Support of Welding Inspector's (1 page)
- 23. 02/12/82 Personnel Exit Interview Documentation Form w/ attachment Employee Concerns (8 pages)
- 24. Various 10 Technical Evaluation - Individual Concern - Statement Dates of Concern (121 pages) 03/20/82 03/22/82
- 25. 03/24/82 Note to W. H. Owen from C. Neal Alexander Re: Non Technical Welding Inspector Concerns w/ enclosure Non Technical Welding Inspector Concerns and Management Implementation Plan (8 pages)
- 26. 04/01/82 Letter to L. Dail, S. Blackley, S. Hager and C. Wylie from D. F. Mitchell Re: Catawba Welding Inspector Task Force Design Engineering Response Scope w/ attachment Concerns with Design Engineering Department Resolution Involvement (4 pages) 27.
04/02/82 Letter to S. B. Hager from D. F. Pitchell Re: Catawba Welding Inspector Task Force Design Engineering Pesponse Scope w/attachrent Technical Evaluation - Individual Concerr - Statement cf Concern (13 pages)
- 28. 05/07/82 Letter to W. H. Bradley from D. F. Mitchell Re: Catawba Welding Inspector Task Force Design Engineering Response w/ attachment Design Engineering Responses (11 pages)
- 29. 05/18/82 Notice of Significant Licensee Meeting Re: Catawba Units I and 2 (2 pages)
- 30. 07/15/82 Letter to G. W. Grier from C. N. Alexander Re: Status of Weldir.g Inspector Non-Technical Concerns w/ enclosures Letter dated 3/24/82 to W. Owen from Neal Alexander w/ enclosure Non-Technical Welding Inspection Concerns (19 pages)
O
- Re: F0!A-84-722 Appendix D
- 31. 02/28/83 Memo to File from G. W. Grier Re: Catawab Welding Inspector Concerns, Completion of (2 pages)
- 32. 03/14/83 Letter to James O'Reilly from Hal Tucker Re: IE Inspection Report (1 page)
- 33. 03/17/83 Handwritten Memo to K. Van Doorn from John McConaghy Re:
Welding Inspector Concerns (1 page)
- 34. 05/19/83 Letter to Billie Garde from J. Felton Re: F01A-83-200 w/ enclosures Appendix A, Appendix B and Letter dated 5/26/83 to James Kelley from Billie Garde w/ attached Affidavit (31 pages) 35.
10/12/83 Evening Herald News Article entitled "NRC Offers Hearing to Catawab Workers w/ attached Article entitled "TMI Probe Drags On" (2 pages)
- 36. 10/27/83 Handwritten Notes to Billie Garde Re: In Process Inspection (2 pages) 37.
10/28/83 Letter to William Dircks from Billie Garde Re: Workers At Catawba Nuclear Facility (3 pages) 38.
10/28/83 Message to James Vorse from 01:HQ w/ attachment Letter to Billie Garde from William Dircks Re: Allegation of a Quality Assurance Breakdown at Catawba (3 pages)
- 39. 10/31/83 Memorandum to Case File Re: Billie Garde (1 page) 40.
11/01/83 Memorandum to Case File Re: Call from Garde (1 page) 41.
11/02/83 Memoranoum to Case File Re: Call to B. Garde (1 page) 42.
11/08/83 Memorandum to Case File Re: Interview with Garde (1 page) 43.
11/08/83 Memorandum to Case File Re: Call to B. Garde (1 page) 44.
11/16/83 Memorandum to Case File Re: Call to Sinclair (1 page) 45.
11/16/83 Memorandum to Case File Re: Call to R. Fortuna (1 page) 46, 11/16/83 Memorandum to Case File Re: Call to B. Garde (1 page) 47.
11/16/83 Conversation Record to Jerry Charnoff Re: Catawba (2 pages) 48.
11/16/83 Handwritten Notes to Charnoff Re: Interview with Duke Personnel (2 pages)
L
Re: F01A-84 722 Appendix 0 49.
11/17/83 Telephone or Verbal Conversation Record between Gerald Charnoff and R. Fortuna Le: Catawba 01 Investigation (1page) 50.
11/18/83 Conversation Record to J. Charnoff P,e: Catawba (1 page) 51.
11/22/83 Memorandum to Case File Re: Call to Mr. Charnoff (1 page) 52.
11/22/83 Memorandum to Case File Re: Call to J. Bezant (1 page) 53.
11/22/83 Letter to Len Williamson from Gerlad Charnoff Re:
Duke Power Company w/ enclosure Organization Charts (12 pages) 54.
11/22/83 Federal Express Receipt from Gerald Charnoff to Len Williamson(1page) 55.
11/17/83 Letter to Robert Fortuna from Gerald Charnoff Re:
Guidelines Provided to Duke Power Company w/ enclosure Guidelines for Duke Power Company Employees Involved in NRC Investigat'ans (2 pages) 56.
12/13/83 Mercrandum t File Re: Call to Gerald Charnoff (1 page) 57.
12/14/83 Handwritten Notes to Don Brutley Re: Wages Being Cut (3 pages)
- 58. 01/16/84 Memorandum to Case File Re: Status of Investigation (1 page)
- 59. 01/16/84 Menorandun to Case File Re: Call to Jim FitzGerlad w/ enclosure Affidavit of Non-Disclosure (4 pagesi
- 60. 01/26/84 MessaSe to James Vorse f rom Carol Ann Reed w/ enclosure Memo to Dick Brady from Donnie Grimsley Re: F0IA Request From Billie Garde for Documents Regarding Region II and/or the Office of Investigations Inspection / Investigation of the Issues Raised by Mr. Langley and the Three in Camera Witness who Testigied in tr.e Catawab Licensing Proceeding w/ enclosure F0IA Request (6 pages)
- 61. 02/01/84 Memorandum to Case File Re: Call to B. Garde (1 page)
- 62. 03/20/84 Memo to Bruno Uryc from James Vorse Re: Catawba Nuclear Station: Disposition of R2A's (1 page) 03.
04/06/84 Memorandum to Case File Re: Contacting and Interviewing DPC Management Personnel (1 page)
-5 Re: F01A-84-722 Appendix D
- 64. 04/06/84 Memorandum to Case File Re: Interview (1 page)
- 65. 04/13/84 Handwritten Notes to Ray Hollings Re: Duke (1 page)
- 66. 04/23/84 Memorandum to Case File Re: Call to Confirm Meeting on 4/12/84 (1 page)
- 67. 04/23/84 Memorandum to Case File Re: Meeting (1 page)
- 68. 04/24/84 Memo to Bruno Uryc from E. L. Williamson Re: Catawba Nuclear Station: Infomation Provided by Interviewee (1 page)
- 69. 04/25/84 Memorandum to Case File Re: Call to Al Carr (1 page)
- 70. 05/24/84 Memo to Bruno Uryc from James Vorse Re: Catawba Nuclear Station: Information Provided by Interviewee (1 page)
- 71. 07/12/84 Memo to James O'Reilly from Ben Hayes Re: Catawba Nuclear Station: Alleged Cheating on QC Welding Inspection Examinations w/ enclosure Report of Investigation (18 pages) 72.
12/14/83 Handwritten Interview - Bentley (2 pages)
- 73. Undated Blank Memorandum to Case File Forms, Form RII-T19 (IFD 4) (10 pages)
- 74. Undated Memorandum to Case File, Form RII-T19, Blank Sheet (FFD9)
(1 page)
- 75. Undated Handwritten Notes Re: Implementing the QA Program (2 pages)
- 76. Undated ASME Requirements with Regards to Metal Surfaces (4 pages) w/ attachments 4/23/82 memo to File from John McConaghy Pe:
Catawab Nuclear Station and 4/29/82 Handwritten Memo to File from J. McConaghy (6 pages)
- 77. Undated Palmetto Alliance Press Release (1 page)
- 78. Undated News Clipping entitled " Group Alleges Duke Records Falsified at Nuclear Plant" (1 page)
- 79. Undated Index of Documents Catawt'a Nuclear Power Plant (3 pages)
Re: F01A-84-722 Appendix D
- 80. Undated Investigation Status Record Re: Possible Violation of Board Order; Lack of QA/QC Independence & Harassment /
Intimidation of QC Inspectors (1 page)
- 81. Undated Allegation Data Form (1 page)
- 82. Undated Investigation Status Record Re: Possible Violation of Board Order; Lack of QA/QC Independence & Harassment /
Intimidation of QC Inspectors (6 pages)
- 83. Undated Case Chronology Sheet (4 pages)
- 84. Undated Handwritten Letter to Mr. Morgan Re: Job as a Welding Inspector at Duke Power's Catawba Nuclear Station (2 pages)
- 85. Undated Handwritten Letter from Ransom Sims Re: QAProgram(2pages)
- 86. Undated Investigation Status Record Re: Alleged Cheating of QC Welding Inspectors Duke Power Company, Catawba Nuclear Plant (1 page)
- 87. Undated Memorandum to Case File Continuation Sheet Re: F01A-84-48 (Ipage) i
- 88. Undated DPC Personnel Information Record Blank Page (1 page) 89 Undated Handwritten Letter from Laura Dalsen Re: QC Program (2 pages)
- 90. Undated Handwritten Notes Re: Duke Power (3 pages)
- 91. Undated Handwritten Letter from Lindsey Harris Re: Catawba (3 pages)
- 92. Undated Handwritten Letter from Fichard Jcren Re: Routine Inspection (2 pages)
- 93. Undated Handwritten Letter Re: QC Department at Catawba Nuclear Station (2 pages)
- 94. Undated Handwritten Note from B. Deaton Re: QA Tech Group (1 page)
- 95. Undated Handwritten Notes Re: Inspectors and for the QA Program (12pages)
- 96. Undated Handwritten Letter from Boyce Cauthen Re: Lack of Support From QA (3 pages)
- 97. Undated Handwritten Note from A. S. Gantt Re: Checking Cleanup forWeld(1page)
Re: 84-722 (2nd Response)
APPENDIX E Records Denied In Entirety - Exemptions (5) and (7)(D)
Exemotions 1.
12/15/83 Interview Notes of Confidential Source (7)(D) 2.
Undated Draft Memo from Hayes to O'Reilly,
Subject:
Catawba Nuclear Station Alleged Harassment and Intimidation of QC Welding Inspectors (2-83-038) with attached copy of the undated draft investigation report.
(88 pages)
(5) and (7)(D) m.,
GL
~ W: /
~~
Q
- f --
-Q
\\ucear In"ormation anc Resource Service 1346 Connectcut Avenue NW 4:n floor Washrgon D C 20036 (2023 296J552 September 5, 1984 James M. Felton, Director Division of Rules and Records FREEDOM OF INFORMATON Office of Adminstration ACT REQUEST U.S. Nuclear Regulatory Commission Washington, D.C. 20555
[OJA '[k' M
/d
~ N FREEDOM OF INFORMATION ACT REQUEST
Dear Mr. Felton:
Pursuant to the Freedom of Information Act, 5 U.S.C. 522, as amended, the Nuclear Information and Resource Service requests the following documents regarding a Notice of Violation at the Catawba plant.
Please consider " documents" to include reports, studies, test results, correspondence, memoranda, meeting notes, meeting minutes, working papers, graphs, charts, diagrams, notes and summaries of conversations and interviews, computer records, and any other forms of written communication, including internal NRC Staff memoranda.
In your response. olease identify which documents correspond to which reauests below.
Pursuant to this request, please provide all documents prepared or utilized by, in the possession of,.or routed through the NRC related to:
- 1. Tne Notices cf Violation 84-88-01 and 84-39-01 (associated with Inspection Reports 50-413-84-88 and 50-414-84-39, respectively), concerning " Inadequate Implementation of Quality Assurance Requirements in the Welding Program";
- 2. All " raw data" (g g. telephone interviews, affidavits, notes),
studies, and analyses done by Duke Power Company, the Brookhaven National Laboratory, and other consultants relating to investigation (s) by Duke Power Company in connection with the
" Welder B" issue, and the above-referenced Notices of Violation;
- 3. All " raw data", studies and analyses done by or for the NRC Staff (or its consultants) for the NRC Staff's investigation of the " Welder B" issue and the above-referenced Notices of Violation; and
- 4. The NRC Staff review of the Duke Power investigation and documents related to the investigation.
2>dhh '
e, w Ac m,
~ y.
-~
j L
6 ' )
.,, In our opinion, it is appropriate in this case for you to waive search charges, pursuant to 5 U.S.C. 552(a)(4)(A) "because furnishing the information can be considered as primarily benefiting the general public."
The Nuclear Ir.fermation and Resource Service is a non-profit organization serving local organizations concerned about nuclear power and p*oviding infor-mation to the general public.
Information required by 10 CFR 9.14a was provided by letter dated August 3, 1984.
The documents requested by this letter will be used by the intervenors, the Palmetto Alliance, in the Catawba operating license proceeding.
Insofar as the information can lead to a full and public airing of issues related to public safety, in an ajudicatory proceeding, the release of such documents will benefit the public living near and around the Catawba plar.t.
I look forward to a response within the ten working days allowed by law.
Sincerely,
/e 0)
" - c. _, ~e r Nina Bell Nuclear Safety Analyst cc: File
.y p.q A,
. -- e.~ ~.- -
- - = - _ _
~ " 'M gg 1 g WB2 NOTICE OF SIGNIFICANT LICENSEE tiEETING Name of Licensee:
Duke Power Company Name of Facility:
Catawba Units 1 and 2 Docket Numbers:
50-413 and 50-414 Date and Time of lieeting:
May 25,1982 at 10:00 a.m.
)
location of Meeting:
Region II Office Purpose of Meeting:
To discuss the licensee's findings relative to the Quality l
Assurance Program in verifying design interfaces and i
investigation of welding QC inspector concerns.
t4RC Attendees:
James P. O'Reilly, Regional Administrator R. C. Lewis, Director, Division of Project and Resident il Programs H. C. Dance, Reactor Projects Branch 2 J. C. Bryant, Chief, Reactor Projects Section 2A P. K. VanDoorn, Senior Resident inspector K. Jabbour, Project Manager, NRR A. J. Ignatonis, Project inspector Licensee Attendees:
W. H. Owen, Executive Vice President, Engineering and Construction, DPC L. C. Dail, Vice President, Engineering, DPC Other selected representatives from DPC l
f40T E :
Atter. dance by NRC personnel at this NRC/ Licensee meeting should be made known by 2:00 p.m., t'.ay 21,1982 via telephone call to J. C. Bryant FTS 242-5537.
i Distribution:
V. Stello, Jr., DEDROGR J. flurray, Division of Rulemaking and Enforcement, ELD R. DeYoung, Director, IE J. Lieberman, Acting Director, Enforcement Staff, IE J. Taylor, Director, Division of Reactor Programs H. Denton, Director, OtiRR D. G. Eisenhut, Director, DL, ONRR E. G. Adensam, Chief, Licensing Branch No. 4, DL, NRR Qb'M'dN T9?
o Q-W,_
. s
.'.6..
%ke' Mr Compenr 2
bec:
Regional Administra tor Deputy Regional Administrator Division Directors Director, EIS Public Affairs Officer
' Docket File Region II Distribution i
List C W
Receptionist I
t b
RII 1
L,,/,.)y',
RII. t, RI a toni s.gr
\\Q f
ryant HChance 5//7//j4 5/// /82 5/,1/82 5//p/82 RClewis 0
/
4-
f ffWic' 3 P.
~
J t
\\_
UI'h'E }#UW E }4 COM }'A.W P.O. box 3 31Hi*
CMAHLOTTI..%.C. uB24u H AL h T1 T KE R rurm>n i i ao4. ara.4sa.
.*.....+.-
l March 14, 19E3 r
Mr. James P. O'Reilly,> Regional Administrator U. S. Nuclear Regulatory Com:r.ission
'R2sion II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30303 j[
Re:
RII:P1*
-L13!8:-39 5 0-i-;.s i e 2-31 D2ar Mr. O'Reilly:
Duke Power Company does not consider any information contained in the subject IE Inspection Report to be proprietary.
l Vary truly yours, g [w s
Hal B. Iucker
,RWO/php I
e
.i P
)n W
\\
m i*
gg g
,( ayS %\\'/J
{Als D- %
MEMORANDUM 5 ~ / 7-O3 DATE
'a K.
Vw M en N E C.
FsE@ REM 50JTA nJ6 ADDRESS OA M "> M pjapfge, Iosfecreg dsocscos M'
GO SUBJECT N 6I 909 Z - VbME MrpA/S FROM L h ab M N D $_.h.
N o,,Q _ m _ _ _ f ep p m~u) eaa-a, ucum (uamunrkps
-k & ~ _ Q - g L M e h i s d a i M i,. w. e..
A?f-Mutuf& Ih_NE.a
.p&o-x4_
W.
- 8'8 m
41fl~$O_
..k_aw a1 + anM& mdath.1L44_
..apaaa s. w w u p w n p a>22e._
Lma. G weaAh 4 >A~24eGA3ae __
i i
s O
.N W
b W_
_..s sa w g'-SA4 p gu &. _ _.
. a Q., tk.
m du k m adsncs. A m p f%
M.
_ n c.T. J x a n &
.mA15.wea& 4 L aQk 4e4Lo Az _
gpr,
-.a -
a
.+0.h@~.tuahfaadm.ufa._7kif p t..
a-a.
s
. nn.
.- m'daudubiu &y m m A ts ) J Q & 4 % a.
i s g h C;ls N! ?g "
f
"'I Y
M d s73-42 3M/Na e it n
0-33 w
a
.t gf
'o, umTED s1 ATEs g
NUCLE AR REGULATORY CCMMISSION vg E
W ASHINGT ON. D. C.10555 8/7;~ N3/~
23 May 19,1983 e
Docket'Nos. 50-413 50-414 Ms. Billie P. Garde, Director Citizens Clinic for Accountable Government Government Accountability Project Institute for Policy Studies 1901 Que Street, N.W.
IN. RESPONSE REFER Washington, DC 20009 TO F01A-83-200
Dear Ms. Garde:
This is in partial response to your letter dated April 21, 1983, in which you requested, pursuant to the Freedom of Information Act, copies of any and all agency records and information related to and/or generated in connection with an investigation at the Catawba Nuclear Power Plant in South Carolina in " Concerns of Welding Inspectors (
Reference:
Case 2G022)." You stated your request includes any and all records and information concerning the allegations by the site QC welding inspection personnel, including inspections or investigations by any and all regional or Washington divisions, offices or sections of the Nuckar Regulatory Commission.
In partial response to your request, copies of the documents listed on Appendix A are being placed in the NRC Public Document Room,1717 H Street, N.W., Washington, DC where they will be available for public inspection and copying.
Copies of the documents released in response to this request are also being placed in the NRC's Catawba facility local Public Document Room located at the York County Library,138 East Black Street, Rock Hill,-SC 29730, Ms. Mary Mallaney, Assistant Reference Librarian.
Portions of documents one through eight of Appendix B have been deleted in order to withhold information which would directly or indirectly reveal the identity of confidential informants.
Because disclosure of this information would disclose the identity of a confidential source, it is being wohhald kom public disclosure ' ursuant to Exemption (7)(D) p of the Freedom of Information Act (5 U.S.C. 552(b)(7)(D)) and 10 CFR 9.5(a)(7)(iv).
\\
Pursuant to 10 CFR 9.9 of the Commission's regulations, it has been determined that the information withheld is exempt from production or disclosure, and that its production or disclosure is contrary to the public interest.
The persons responsible for this denial are the undersigned and Mr. James P. O'Reilly, Regional Administrator, RII, Atlanta, Georgia.
i_J~
p d Q wpB fj
/ c/
- adap C - h, g/n,,
'A Ms. Billie P. Garde This denial may be appealed to the Comission's Executive Director for Operations within 30 days from the receipt of this letter. As provided in 10 CFR 9.11, any such appeal must be in writing, addressed to the Executive Director for Operations, U.S. Nuclear Regulatory Comission.
Washington, DC 20555, and should clearly stath on the envelope and in the letter that it is an " Appeal from an Initial F0IA Decision."
A few additional documents are under review and we will comunicate with you again concerning their disposition.
Sincerely,.
Nl 2:,f
/ O2
,i
- s
[b J. M. Felton, Director Division of Rules and Records Office of Administration
Enclosures:
As stated Y
e M
Z e/ S/
M(
b@CM r
M-"
Appendix A F
83-200 1.
12/8/81 - Log, handwritten (1 page) 12/16/81 2.
5/18/82 - Notice of Significant Licensee Meeting (2 pages) 3.
5/25/82 Presentation for IE/ REGION II, Resolution of Inspector Concerns, Catawba Nuclear Station (15 pages) 4.
7/15/82 Memo to G. W. Grier from C. N. Alexander, Jr. re: Status of Welding Inspector Non-Technical Concerns w/ enclosures (19 pages) 5.
7/27/82 Memo to Dance from Bryant,
Subject:
Catawba Prehearing Contentions-Chronology (3 pages) 6.
7/30/82 Memo to D. G. Eisenhut from R. C. Lewis,
Subject:
Contentions Expressed at the Catawba Prehearing in York South Carolina, on January 11-12, 1982 (14 pages) 7.
9/30/82 Letter to H. B. Tucker from R. C. Lewis,
Subject:
Report Nos. 50-413/82-21 and 50-414/82-19 w/ enclosures (21 pages) 8.
Undatdd Memo to J. Y. Vcrse from P. K. Van Doorn,
Subject:
Allegations Concerning QC Welding Inspection at Catawba Nuclear Station (Case No. 2G022) (1 page) 9.
2/14/83 Letter to H. B. Tucker from H. C. Dance,
Subject:
Report Nos. 50-413/82-33 and 50-414/82-31 (7 pages) 10.
2/23/83 Memo to G. E. Johnson from C. E. Alderson,
Subject:
Documentation of Allegations: Duke Power Company, Catawba Nuclear Station (1 page) 11, 2/28/83 Mcmo to File, by G. W. Grier,
Subject:
Catawba Welding Inspector Concerns, Completion of (2 pages) 12.
3/4/83 IE Presentation to ACRS on March 4,1983 (5 pages) 3.
3/14/83 Letter to J. P. O'Reilly from H. B. Tucker, re: RII:PKV 50-413, 82-33; 50-414/82-31 (1 page) 14.
3/17/83 Memo to K. Van Doorn from J. M. McConaghy,
Subject:
Welding Inspector Concerns NCI 9092-Dome Pitting (92 pages) 15.
4/20/83 Palmetto Alliance Pres's Release (1 page)
- 16. 4/21/83 List-Case Chronology, File Number 2G022 (1 page)
- 17. Undated News article by Jack Horan, Observer Staff Writer, titled: Group Alleges Duke Records Falsified (1 page)
- 18. Undated Report -Final Report of Task Force Effort to Evaluate Technical Concerns of Catawba Welding Inspectors - Volume 1 - Task Force Program Summary -
Prepared by L. M. Coggins, et al. (42 pages)
.b t/3/
y 19.
Undated Report-Final Report of Task Force Effort to Evaluate Technical Concerns of Catawba Welding Inspectors - Volume II - Technical Evaluations and Verifications-Individual Concerns (452 pages) 4 20.
Undated Handwritten Statement by Dean 8entley - Things that concern me most about the present condition of the QA, QC Program (2 pages)
\\
21.
10/26/79 Handwritten notes (4 pages) to 8/19/80 22.
Undated Report, handwritten, by JRB - Lack of Support for the QC Welding Inspectors and for the QA Program (12 pages) 23, 11/26/79 Nonconforming Item Repor't Serial No. 6918 w/ attachments (7 pages) s s
4 24.
3/11/80 Nonconforming Item Report, Serial No. 7514 w/ attachment (2 pages) 25.
7/25/80 Report - ANSI B31.1 Weld Inspection Report - Drawing CN-1WL-912 Weld Number lWL912-25 w/ attachment (2 pages) 26.
7/25/80 Report - ANSI B31.1 Weld Inspection Report - Drawing CN-1WL-912; Weld Number 1WL912-26 w/ attachment (2 pages) 27.
8/19/80 Nonconforming Item Report, Serial No. 9258 (1 page) 28.
8/20/80 Nonconforming Item Report, Sorial No. 9264 (1 page) 29.
8/20/80 Nonconforming Item Report, Serial No. 9266 (1 page) 30.
8/22/80 Nonconforming Item Report, Serial No. 9291 w/ attachments (5 pages)
't 1
l 31.
8/22/80 Nonconforming Item Report, Serial No. 9293 (1 page) 32.
11/6/80 Nonconforming Item Report, Serial No. 10013 ( 1 page) 33.
12/7/81 Nonconfoming Item Report, Serial No. 13540 (1 page) 34.
11/19/81 Nonconforming Item Report, Serial No.13455 w/ attachments (6 pages) l
- 35. 10/7/81 Nonconforming Item Report, Serial No.13053 w/ attachment (2 pages)
- 36. 12/12/80 Variation Notice Serial No.14967 w/ attachment (2 pages)
- 37. 3/16/81 Nonconforming Item Report, Serial No. 11309 (1 page) 7/9/81 Nonconforming Item Report, Serial No. 12139 (1 38.
Weld Process Control Sheet, Weld No. 2NC16-10 (1 page)page) w/ attachment:
39.
9/25/81 Weld Process Control Sheet, Weld No. 2NC16-15 (1 page) w/ attachment:
Nonconforming Item Report, Serial No. 12139 (1 page) 4
%/s/!
3 7
- 40. 4/8/81 Nonconforming Item Report, Serial No. 11534 (1 page)
- 41. 8/7/81 Duke Power Company Form - Exceptions or Alternatives to R-3A's, R-3A Serial No. 14052 (1 page), w/ attachments, Variation Notice Serial No.14,052 (2 pages)
- 43. 7/17/81 Nonconforming Item Report, Serial No. 12213 (1 page)
- 44. 7/21/81 Nonconforming Item Report, Serial No. 12239 (1 page) 4/1/81 Weld Process Control Sheet, Weld No. 2NV373-3 (1 page) w/ attachment (1 page) 45.
- 46. 9/16/81 Nonconforming Item ' Report, Serial No. 12782 (1 page) w/ attachments (1 page)
1NI162-27 (1 page) w/ attachments (4 pages)
- 48. 1/19/82 Handwritten statement by T. A. Baumgardner (2 pages) 9.
7/2/79 Nonconforming Item Report, Serial No. 6047 (1 page)
- 50. 7/31/79 Nonconfirming Stem Report, Serial No. 6259 (1 page) 51.
8/6/81 Handwritten notes - unsigned (4 pages) 52.
8/6/81 Nonconforming Item Report, Serial No. 12420 (2 pages)
- 53. 8/32/81 Nonconforming Item Report, Serial No. 12454(1 page) w/ attachment (1 page) 54.
9/3/81 Nonconforming Item Report, Serial No. 12682 (1 page) ndatedHandwrittenNotesbyBoyceCauthen--LackofSupportfromQA(3 capes) 5.
Undated Handwritten Notes by C. D. Crisp -- Concerns 1 through 6 (1 page) 56.
57 Undated Handwritten Notes by B. Deaton (1 page)
Undated Handwritten Notes by Harold Eubanks (1 page)
I 58.
59.
ndated Handwritten Notes Re: NCI 7850 by Harold Eubanks (1 page) 2/29/80 Nonconforming Item Report, Serial No. 7850 (4 pages) 8/28/81 Handwritten Notes by A. 5. Gantt (1 page) 61
- 62. Undated Blank Form (1 page) 2/13/79 Weld Process Control Sheet, Weld No..INV 309-1 w/ attachments (5 pa 63.
2/12/82 Fom QA-107A Revision 1 -- Personnel Exit Interview Docum 1/20/82) (8 pages) 64.
w/ handwritten report by V. C. Godfrey, Jr. (dated fo( %/
4
+
1 65
/18/82 Handwritten Report by V. C. Godfrey, Jr. (1 page)
C6 7/30/80 Nonconforming Item Report, Serial No. 9085 (2 pages) 67 8/29/80 Nonconfonning Item Report, Serial No. 9358 (2 pages) 11/24/80 Nonconforming Item Report, Serial No. 10187(2pages) 69 8/i/80 Nonconforming Item Report, Serial No. 9119 (1 page)
- 70. 2/29/80 Nonconfonning Item Report, Serial No. 7850 (4 pages)
- 71. Undated Handwritten Report by Lindsey Harvey Hollis, Jr. -- To Whom It May Concern (3pages) 72.
1/18/82 Handwritte'n statement by R. W. Irby (1 page) 3.
1/11/82 Memo to J. R. Wells & L. R. Davison from R. A. Morgan Re: Catawba 1-2,g Management Procedure 8030-0003, Resolution of Technical Matters w/attachm ts M (5 pages) 1-(p W
~
74.
7/31/80 Nonconforming Item Report, Serial No. 9092, w/ attachments (8 pages)
- 75. 8/24/81 Nonconforming Item Report, Serial No.12549, w/ attachments (5 pages) 76 Undated Handwritten Statement by Larry D. Jackson (2 pages) 77.
Undated Handwritten Statement by Richard Allen Jones (2 pages) 78.
1/14/82 Memo to Bob Morgan from Kenneth W. Kerriker
Subject:
EMPLOYEE RECOURSE (1 page)
~
7
/19/82 Handwritten Note to R. A. Morgan from Ronald Kirkland (1 page) 80.
ndated Handwritten Statement by John R. McCoy (2 pages)
Bl.
11/30/81 Form 184 (5-76) Handwritten Notes re events on 2/27/81; 2/26/81; and 2/ 2 5/ 81 (2 pages - virtually identical) 1/19/82 Handwritten Notes by G. E. Rose (18 pages) 83.
3/11/80 Nonconfo'rming Item Report, Serial No. 7514 (2 pages) 84.
10/7/81 Nonconforming Item Report, Serial No. 13053(2pages) 85.
/24/81 Form QA-107A Revision 1 -- Personnel Exit Interview Documentation Form w/ handwritten report Re: Weld No. IFW10-13 (3 pages) 4/1/81 Weld Process Control Sheet, Weld No. 2NV373-3 w/ attachment (2 pages) 86.
Undated Handwritten Note by Ransom Sims (2 pages)
Undated Handwritten Note by Jerry Standridge (2 pages) ndated Handwritten Note by unidentified author (2 pages) f 43/
Re:
r01A-83-200 APPENDIX B 1.
Undated Memo to C. E. Anderson, from P. K. VanDoorn,
Subject:
ALLEGATIONS CONCERNING QC WELDING INSPECTION AT CATAWBA NUCLEAR STATION (1 page) 2.
3/15/82 Memo to C. E. Anderson, from P. K. VanDoorn,
Subject:
CONCERNS EXPRESSED BY A QC WELDING INSPECTOR AT CATAWBA NUCLEAR STATION (1 page) 3.
3/24/82 Memo for C. E. Alderson, fnom W. J. Tobin,
Subject:
INITIAL
SUMMARY
OF CASE NO. 2G022 (2 pages) 4.
5/18/82 Memo for Jack Bryant, from C. E. Alderson,
Subject:
CATAWBA -
CONCERNS OF WELDING INSPECTORS (
REFERENCE:
CASE 2G022) (1 page) 5.
Undated Handwritten Notes (2 pages) 6.
9/30/82 Memo for Jack Bryant, from C. E. Alderson,
Subject:
CATAWBA -
CONCERNS OF WELDING INSPECTORS (REF. CASE 2G022) (2 pages) 7.
2/22/83 Memo for G. E. Johnson, from P. K. VanDoorn,
Subject:
INFORMATION RELATIVE TO WELDING INSPECTOR CONCERNS AT CATAWBA NUCLEAR STATION (1 page) 8.
3/22/83 Draft - NRC Staff Second Supplemental Response to Palmetto
~
Alliance First Interrogatories and Production Requests on Contentions 6 and 7 (Re: General Interrogatory 4) (8 pages) 8
'7q si