Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20128M863 + (ML20128M863)
- ML20128M864 + (ML20128M864)
- ML20128M865 + (ML20128M865)
- 05000259/LER-1985-023-01, :on 850613,partial Containment Isolation Occurred When Temporary Jumper Slipped Off Relay Neutral During Replacement of Defective Relay.Dislodged Jumper Reconnected & Isolation Reset + (ML20128M866)
- ML20128M867 + (ML20128M867)
- ML20128M868 + (ML20128M868)
- 0CAN058509, Requests Postponement of 850611-19 Safeguards Regulatory Effectiveness Review Until 850618-26 to Facilitate Security Mgt Personnel Attendance at EEI Workshop in Washington,Dc. Informal Request Granted by E Ten Eyck + (ML20128M869)
- ML20128M870 + (ML20128M870)
- ML20128M872 + (ML20128M872)
- ML20128M873 + (ML20128M873)
- ML20128M874 + (ML20128M874)
- ML20128M875 + (ML20128M875)
- ML20128M876 + (ML20128M876)
- ML20128M877 + (ML20128M877)
- ML20128M878 + (ML20128M878)
- ML20128M879 + (ML20128M879)
- ML20128M880 + (ML20128M880)
- ML20128M881 + (ML20128M881)
- ML20128M882 + (ML20128M882)
- ML20128M883 + (ML20128M883)
- ML20128M884 + (ML20128M884)
- ML20128M886 + (ML20128M886)
- ML20128M888 + (ML20128M888)
- ML20128M890 + (ML20128M890)
- ML20128M891 + (ML20128M891)
- ML20128M894 + (ML20128M894)
- ML20128M896 + (ML20128M896)
- ML20128M899 + (ML20128M899)
- LIC-93-0019, Responds to NRC Re Violations Noted in Insp Rept 50-285/92-33 on 921122-930102.Corrective Actions:P&Ids Will Be Revised to Indicate Required (Closed) Position for SG Blowdown Processing Sys Interface Valves + (ML20128M901)
- ML20128M903 + (ML20128M903)
- ML20128M905 + (ML20128M905)
- ML20128M907 + (ML20128M907)
- ML20128M908 + (ML20128M908)
- ML20128M909 + (ML20128M909)
- ML20128M911 + (ML20128M911)
- ML20128M913 + (ML20128M913)
- 05000309/LER-1993-002, :on 930121,control Room Ventilation Trains Declared Inoperable Due to Preventive Maint.Consequences of Event Which Will Occurred Quarterly,Minimal Since Loss of Trains Short Duration (Less than 1 H) + (ML20128M914)
- ML20128M915 + (ML20128M915)
- ML20128M916 + (ML20128M916)
- ML20128M917 + (ML20128M917)
- ML20128M918 + (ML20128M918)
- ML20128M919 + (ML20128M919)
- ML20128M920 + (ML20128M920)
- ML20128M921 + (ML20128M921)
- ML20128M922 + (ML20128M922)
- ML20128M923 + (ML20128M923)
- ML20128M924 + (ML20128M924)
- ML20128M926 + (ML20128M926)
- RBG-38151, Monthly Operating Rept for Jan 1993 for Rbs,Unit 1 + (ML20128M927)
- 2CAN058507, Forwards Response to Re post-LOCA Status of Reactor Coolant Pumps,Trip Vs No Trip,Per NUREG-0737,Item II.K.3.5 + (ML20128M929)
- ML20128M930 + (ML20128M930)