Text
._
O se Arizona Nuclear Power Project ja 10 g lD 20 P.o. box 52034 e PHOENIX, ARIZONA 85072-2034 July 3, 1985 ANPP-32950-TDS/TPS U. S. Nuclear Regulatory Commission Region V 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368 Attention:
Mr. D. F. Kirsch, Acting Director Division of Reactor Safety and Projects
Subject:
Interim Report - DER 85-22 A 50.55(e) Potentially Reportable Def.leiency Relating to Color Coded Visual Indicators Breaking Off Control Relays and Preventing Travel File: 85-019-026; D.4.33.2
Reference:
Telephone Conversation between L. Miller and P. Coffin on June 4, 1985
Dear Sir:
The NRC was notified of a potentially reportable deficiency in the ref-erenced telephone conversation. At that time, it waa estimated that a determination of reportability would be made within thirty (30) days.
Due to the extensive inver.tigation and evaluation required, an Interim Report is attached.
It is now expected that this information will be finalized by July 26, 1985, at which time a complete report will be submitted.
Very truly yours,
/
C>m.
E. E. Van Brunt, Jr.
Executive Vice President Project Director EEVB/TPS/jb Attachment cc:
See Page Two 8507260098 850703 PDR ADOCM 05000528 Ig S
PDR 1
Ms.b.F. Kirsch DER 85-22 Page Two
+
cc: Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.
20555 D. B. Karner W.
E.' Ide'-
D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo B. S. Kaplan J. R. Bynum-J. M. Allen D..Canady
.A. C. Gehr W. J. Stubblefield
'W. G. Bingham R. L. Patterson R. W. Welcher H. D. Foster D.-R. Hawkinson R. P. Zimmerman, M. L. Clyde B. T.. Parker T. J. Bloom D. N. Stover J. D. Houchen J. E. Kirby Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, GA 30339
?
-,e
%J.
~1, ~ i
- 1. ' ~41 INTERIM REPORT DER 85-22 POTENTIAL REPORTABLE DEFICIENCY-
. ARIZONA NUCLEAR POWER PROJECT PVNGS UNITS 1,12,~3 1.-
Potential Problem
- 1. ' The N.O./N.C. color coded visual indicators on Westinghouse industrial control relays, type ARD used in the Aux relay cabinets, are breaking off the relays and falling into the
-relays and preventing travel _(i.e. cabinet 2E-ZAB-C01 relay E6/SSY1, terminals #1 and #3).
2.
Also, upon preliminary inspection of the relays in the Aux relay cabinets, items such as wire markers, wire in-
.sulation, metal pieces, paper, etc., were found inside the relays (i.e. 3E-ZJB-C01 relay D1/S1X5, contact 9-10 a piece of metal,was found inside relay housing)..
EER number 85-XI-001 is written for Unit one.
Note: The auxiliary relay cabinets were' supplied by.Harlo Corporation on 10407-13-EM-002' II.
Approach To and Status Of P'roposed Rebolution Bechtel Engineering has dispositioned NCR SE5774 to implement
-the corrective action,.to: inspect and remove debris, and is currently preparing the final report.
III. Projected Completion of' Corrective Action and Submittal of the Final Report i
The complete evaluation and final report are forecast to be completed by July 26, 1985.
4 8
.