ML20128M876

From kanterella
Jump to navigation Jump to search
Forwards Safety Evaluation Re Util 831104 Response to Generic Ltr 83-28,Items 3.1.1,3.1.2,3.2.1,3.2.2,4.1 & 4.5.1. Response to Items Acceptable.Review Complete
ML20128M876
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 05/13/1985
From: John Miller
Office of Nuclear Reactor Regulation
To: Musolf D
NORTHERN STATES POWER CO.
Shared Package
ML20128M880 List:
References
GL-83-28, NUDOCS 8506030107
Download: ML20128M876 (1)


Text

.

- May 13,1985 DISTRIBUTION:

Docket Nos. 50-282 i N PMKreutzer and 50-306 NRC PDR ACRS +10 Mr. - D. M. Musolf L PDR Gray File i

Nuclear Support Services Department ORB #3 Rdg JStevens Northern States Power Company HThompson L. Kinter 414 Nicollet Mall 0 ELD Midland Squart - 4th Floor EJordan Minneapolis, Minnesota 55401 BGrimes JPartlow

Dear Mr. Musolf:

DCDi Ianni The Commission has completed the review of your November 4,1983 response to

- Generic letter (GL) 83-28 Items 3.1.1 and 3.1.2 Post-Maintenance Testing (RTS Components), Items 3.2.1 and 3.2.2 Post-Maintenance Testing (all other Safety Related Components), Itea 4.1 RTS Reliability (Vendor Related Modification), and

-Item 4.5.1 RTS Reliability (System Functional Test Description), for the Prairie Island Nuclear Generating Plant Unit Nos. I and 2.

Our evaluation concludes that your responses to these items are adequate in content and, therefore, are acceptable. We consider our review for items 3.1.1, 3.1.2, 3.2.1, 3.2.2, 4.1 and 4.5.1 complete.

A copy of our safety evaluation is enclosed.

Sincerely, original ofgned byi James R. Miller, Chief Operating Reactors Branch #3 Division of Licensing

Enclosure:

Safety Evaluation cc w/ enclosure See next page

% [ 0 goy { $

2 P

h 1

a

%dC f

y*

ORB 3:DL ORB #3 DL ORB #3:DL LB#1s ter DDi Ianni:dd JStev ns JRMiller 85 5/jo/85 5//S/85 5/ /85