Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000456/1992025 + (ML20128K256)
- ML20128K260 + (ML20128K260)
- U-602101, Monthly Operating Rept for Jan 1993 for Clinton Power Station,Unit 1 + (ML20128K262)
- ML20128K263 + (ML20128K263)
- ML20128K264 + (ML20128K264)
- ML20128K265 + (ML20128K265)
- ML20128K266 + (ML20128K266)
- ML20128K267 + (ML20128K267)
- ML20128K269 + (ML20128K269)
- ML20128K270 + (ML20128K270)
- PNO-III-85-060, on 850712,facility Shut Down for Maint on RHR Sys Train a Shutdown Cooling Injection Valve & Train B Suppression Pool Spray Valve.Valves Failed Local Leak Rate Testing.Outage Expected to Last Until 850722 + (ML20128K271)
- ML20128K272 + (ML20128K272)
- ML20128K275 + (ML20128K275)
- ML20128K276 + (ML20128K276)
- ML20128K277 + (ML20128K277)
- ML20128K279 + (ML20128K279)
- ML20128K280 + (ML20128K280)
- ML20128K281 + (ML20128K281)
- ML20128K282 + (ML20128K282)
- ML20128K283 + (ML20128K283)
- ML20128K284 + (ML20128K284)
- BSEP-85-1070, Responds to Violations Noted in Insp Repts 50-324/85-05 & 50-325/85-05.Corrective Actions:Surveillance Activity Turnover Guidelines Established to Ensure Improved Transition of Work Between Individuals + (ML20128K285)
- ML20128K290 + (ML20128K290)
- ML20128K291 + (ML20128K291)
- ML20128K292 + (ML20128K292)
- ML20128K293 + (ML20128K293)
- ML20128K294 + (ML20128K294)
- ML20128K295 + (ML20128K295)
- ML20128K297 + (ML20128K297)
- ML20128K298 + (ML20128K298)
- ML20128K302 + (ML20128K302)
- 05000295/LER-1993-002-01, :on 931114,discovered That Various Readings for SG & Pressurizer Pressure Channel Checks Not Completed on Previous Day.Caused by Personnel Error.Rounds Completed on 930114 + (ML20128K303)
- ML20128K304 + (ML20128K304)
- ML20128K305 + (ML20128K305)
- ML20128K308 + (ML20128K308)
- ML20128K309 + (ML20128K309)
- ML20128K310 + (ML20128K310)
- ML20128K311 + (ML20128K311)
- ML20128K312 + (ML20128K312)
- NG-96-1687, Advises That Current Repair & Replacement Program Will Be Used for All Activities in RFO 14 to Avoid Confusion,Since DAEC Begins Third 10-yr Insp Interval on 961101 + (ML20128K315)
- ML20128K318 + (ML20128K318)
- JSP-064-93, Application for Amend to License NPF-62,revising TS 6.9.1.7, Semiannual Radioactive Effluent Release Rept to Bring TS in Compliance W/Amended 10CFR50.36a Requirements Which Change Submittal Frequency of Rept to Annually + (ML20128K320)
- ML20128K321 + (ML20128K321)
- ML20128K322 + (ML20128K322)
- ML20128K323 + (ML20128K323)
- ML20128K325 + (ML20128K325)
- ML20128K328 + (ML20128K328)
- 1CAN078504, Forwards Change Notice 1 to Primary Reactor Containment Integrated Leak Rate Test,Final Rept. Errors Caused by Use of Different Computer Sys for Generation of Rept + (ML20128K330)
- ML20128K331 + (ML20128K331)
- ML20128K332 + (ML20128K332)
- ML20128K333 + (ML20128K333)