Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127C452 + (ML20127C452)
- IA-92-338, Package of Documents Re Project & Budget Proposal for Listed NRC Work + (ML20127C453)
- ML20127C453 + (ML20127C453)
- ML20127C454 + (ML20127C454)
- ML20127C456 + (ML20127C456)
- ML20127C458 + (ML20127C458)
- ML20127C461 + (ML20127C461)
- LIC-93-0008, Forwards Suppl Application to Amend License DPR-40, Changing TS to Revise Requirements for Containment Integrity & Personnel Air Lock to Reflect Provisions of C-E Standard TSs + (ML20127C464)
- ML20127C466 + (ML20127C466)
- ML20127C469 + (ML20127C469)
- ML20127C473 + (ML20127C473)
- ML20127C474 + (ML20127C474)
- ML20127C475 + (ML20127C475)
- ML20127C480 + (ML20127C480)
- 05000498/LER-1992-009, :on 920801,operator Performing AFW Portion of Solid State Protection Sys Test Misread Procedure & Turned Control Switch On,Causing Pump to Discharge Into SG C.Caused by Personnel Error.Procedure Revised + (ML20127C483)
- ML20127C484 + (ML20127C484)
- 05000344/LER-1992-021, :on 920730,discovered That Manual Vent Valves in MSIV Air Supply Lines Not Installed Properly.Caused by Insufficient Info in Design Change Package.Fire Procedures Revised & Engineering Personnel Trained + (ML20127C485)
- ML20127C486 + (ML20127C486)
- ML20127C489 + (ML20127C489)
- IA-85-127, Requests 850225 Meeting to Discuss Scope,Content & Purpose of Evaluations of Hydrogen Control Owners Group (Hcog) Program Plan.Transmission of Hcog Program & Evaluation Targeted for mid-Apr + (ML20127C490)
- ML20127C490 + (ML20127C490)
- ML20127C492 + (ML20127C492)
- ML20127C494 + (ML20127C494)
- ML20127C496 + (ML20127C496)
- ML20127C499 + (ML20127C499)
- ML20127C503 + (ML20127C503)
- ML20127C506 + (ML20127C506)
- ML20127C507 + (ML20127C507)
- ML20127C511 + (ML20127C511)
- ML20127C513 + (ML20127C513)
- ML20127C516 + (ML20127C516)
- ML20127C518 + (ML20127C518)
- IR 05000344/1992019 + (ML20127C527)
- ML20127C530 + (ML20127C530)
- ML20127C531 + (ML20127C531)
- ML20127C532 + (ML20127C532)
- ML20127C534 + (ML20127C534)
- 05000298/LER-1992-013, :on 920730,error Discovered in Limiting Single Failure Assumption for ECCS Performance Analysis.Analysis in 1976 Contained Erroneous Evaluation of Eccs.Plant Mods Will Be Made to Restore Validity of Previous Assumptions + (ML20127C536)
- ML20127C537 + (ML20127C537)
- ML20127C538 + (ML20127C538)
- ML20127C539 + (ML20127C539)
- IA-92-276, Final Response to FOIA Request for Documents Re FWCI Sys at Facility.Forwards Documents Listed in App a Which Are Being Made Available in Pdr.App B Document Withheld in Entirety (Ref FOIA Exemption 7) + (ML20127C539)
- 05000298/LER-1992-014, :on 920731,HPCI Sys Declared Inoperable Due to Severe Oil Leak from Diaphragm Area of Mechanical/Hydraulic Overspeed Trip Auto Reset Control Assembly.Valve Assembly Replaced & HPCI Sys Tested Satisfactorily & Returned to Svc + (ML20127C541)
- ML20127C542 + (ML20127C542)
- ML20127C544 + (ML20127C544)
- 05000339/LER-1992-007-03, :on 920806,MS Trip Valve Failed Causing Reactor Trip & Safety Injection Due to Failure of Ms Trip Valve Air Cylinder Rupture Disc.Rupture Discs on Ms Trip Valve C Replaced + (ML20127C546)
- ML20127C547 + (ML20127C547)
- IA-85-119, Responds to FOIA Request for License Applications Submitted by Isomedix & Precision Mats Corp of New Jersey.Forwards Documents 6,9 & 10 Listed in App A.Other Documents Responsive to Request Available in PDR + (ML20127C547)
- ML20127C554 + (ML20127C554)
- ML20127C555 + (ML20127C555)
- ML20127C556 + (ML20127C556)