ML20127C480

From kanterella
Jump to navigation Jump to search
Responds to Suppl 1 to NRC Bulletin 90-001, Loss of Fill Oil in Transmitters Mfg by Rosemount. All Unit 2 Transmitters Currently Installed Mfg post-890711 or Refurbished W/Sensing Elements
ML20127C480
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 01/13/1993
From: William Cahill
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-90-001, IEB-90-1, TXX-93015, NUDOCS 9301140229
Download: ML20127C480 (3)


Text

7,,,2 d

Log # TXX-93015 C~

File # 10119 2

883 Ref. # NRCB 90-01 Supp. 1 TUELECTRIC January 13, 1993

% Libra J. Cahill, Jr.

Gwup Vwe funkm U. S. Nuclear Regulatory Commission Attention:

Document Control Desk Washington, DC 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

^

DOCKET NOS. 50-445 AND 50-446 NRC BULLETI,190-01 SUPPLEMENT 1; LOSS OF FILL-0IL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT Gentlemen:

On December 22, 1992, the NRC issued Bulletin 90-01 Supplement 1, " LOSS OF FILL-Oll IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT."

In response to the bulletin, TU Electric submits the following.

Unit 2 is a NTOL unit under construction that must confirm, prior to the date scheduled for fuel load, that the actions required by the bulletin have been completed.

The supplement requests holders of construction permits to:

1.

Review plant records and identify any Rosemount transmitters series 1153 B, 1153 0, or 1154 that were manufactured before July 11, 1989, and that are or may in the future be used in safety-related systems or systems installed in accordance with 10 CFR 50.62.

In response, TU Electric provides that all Unit 2 transmitters currently installed, or in spares that may in the future be installed, are either of post July 11, 1989, manufacture or are refurbished with sensing elements that were manufactured after the July 11, 1989, date.

140030 9301140229 930113

/

PDR ADOCK 0300 5

f O

die N. Olive Strect LD. 81 Deltas,Texu 73201 g

l

J) ' '

i s

TXX-93015 Page 2 of 2 2.

Evaluate the enhanced surveillance program used to monitor the transmitters under surveillance.

As none of the Unit 2 transmitters are required to be monitored for loss of fill oil, Unit 2 does not have an enhanced surveillance program.

TV Electric's CPSES Unit 1 is an operating plant that will respond to the requirements in the supplement within the 60 days allowed by the bulletin.

If you have any further questions please contact Jose' D. Rodriguez at (214) 812-8674.

Sincerel,

f g '_ _

Will am J. Cahill, Jr.

JDR/

Attachmont c-Mr. J. L. Milhoan, Region IV Resident inspectors, CPSES (2)

Mr. T. A. Bergman, NRR Mr. B. E. Holian, NRR

,dd ~

\\

Attachment to TXX-93015 Page 1 of 1 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION in the Matter of

)

Texas Utilities Electric Company Docket Nos. 50-445 50-446 (Comanche Peak Steam Electric Station, Units 1 & 2)

AFF10AVIl I, William J. Cahill, Jr. being duly sworn, hereby deposes and says that I am Group Vice President, Nuclear of TU Electric, the lead Applicant herein; that I have full authority tn execute this oath; that I have read the foregoing response to NRC BULLETIN 90-01 SUPPLEMENT 1; " LOSS OF FILL-OlL IN TRANSMITTERS MANUFACTURED BY ROSEMOUNT" and know the contents thereof; and that to the best of my knowledge, information, and belief the statements made in it are true, y

'/

-WilliamJ.Cahil&(Jr.

Group Vice President, Nuclear Production STATE OF TEXAS

)

)

COUNTY OF

)

Subscribed and sworn to before me, on this hl '

day of d waat-L,1992, lbu&

Notary Public

.