Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127B231 + (ML20127B231)
- 05000369/LER-1992-011-02, :on 921210,four AFW Pressure Switches Found Outside Specified Setpoint Limit.Caused by Setpoint Drift Due to Unknown Factors.Switches Replaced & Mods Implemented to Increase Setpoint for All 20 Switches by Addl 2 Psig + (ML20127B232)
- ML20127B234 + (ML20127B234)
- ML20127B236 + (ML20127B236)
- ML20127B241 + (ML20127B241)
- ML20127B242 + (ML20127B242)
- ML20127B246 + (ML20127B246)
- ML20127B247 + (ML20127B247)
- ML20127B254 + (ML20127B254)
- 05000443/LER-1992-019-01, Forwards LER 92-019-01 Re Delta T/Tavg Protection Channel Operational Test,Documenting Root Cause & Corrective Actions,Per Evaluation Ongoing at Time of LER 92-019-00 Submittal + (ML20127B255)
- ML20127B257 + (ML20127B257)
- RBG-21214, Final Deficiency Rept DR-302 Re Wiring Configuration of HPCS Diesel Generator Supplied by Ge.Item Determined Not Reportable Under 10CFR50.55(e).Field Deviation Disposition Request LD1-3211 Issued + (ML20127B258)
- ML20127B262 + (ML20127B262)
- ML20127B263 + (ML20127B263)
- ML20127B264 + (ML20127B264)
- ML20127B265 + (ML20127B265)
- ML20127B266 + (ML20127B266)
- ML20127B267 + (ML20127B267)
- ML20127B268 + (ML20127B268)
- ML20127B269 + (ML20127B269)
- 05000443/LER-1992-019, :on 920916,determined That Procedures for Performing Delta T/Tavg Protection Channel Operational Test Inadequate Due to Lack of Complete Technical Review of I&C Procedures.Appropriate Procedures Revised + (ML20127B270)
- ML20127B277 + (ML20127B277)
- ML20127B281 + (ML20127B281)
- ML20127B282 + (ML20127B282)
- LIC-93-0004, Forwards Application for Amend to License DPR-40,revising TS Requirements for Containment Integrity & Personnel Air Lock to Reflect Provisions of C-E STS + (ML20127B284)
- ML20127B286 + (ML20127B286)
- JAFP-93-0007, Monthly Operating Rept for Dec 1992 for Ja FitzPatrick Nuclear Power Plant + (ML20127B293)
- ML20127B294 + (ML20127B294)
- ML20127B295 + (ML20127B295)
- ML20127B301 + (ML20127B301)
- ML20127B304 + (ML20127B304)
- IR 05000259/1985026 + (ML20127B307)
- ML20127B309 + (ML20127B309)
- W3P85-1410, Monthly Operating Rept for May 1985 + (ML20127B311)
- ML20127B312 + (ML20127B312)
- ML20127B314 + (ML20127B314)
- ML20127B318 + (ML20127B318)
- BSEP-85-0934, Suppls 850426 Response to Violations Noted in Insp Repts 50-324/84-39 & 50-325/84-39,due to Ommission of Line 7 in Second Paragraph of Part Ii.Corrective actions:OI-01 Will Be Revised by 850522 + (ML20127B322)
- ML20127B325 + (ML20127B325)
- ML20127B328 + (ML20127B328)
- ELV-01657, Forwards LER Re Personnel Error Leading to Unsecured Safeguards Info.Ler Withheld + (ML20127B329)
- ML20127B330 + (ML20127B330)
- ML20127B331 + (ML20127B331)
- ML20127B332 + (ML20127B332)
- ML20127B335 + (ML20127B335)
- ML20127B336 + (ML20127B336)
- ML20127B340 + (ML20127B340)
- ML20127B341 + (ML20127B341)
- ML20127B344 + (ML20127B344)
- ML20127B347 + (ML20127B347)
- ML20127B350 + (ML20127B350)