3 1'U bM 7.i, c c, p r MEFCFR@P4 FOR: Jce Younnblod11, r+ ter Licers tng Branch flo.1 Olvidon of Licensing Albert Schwencer. Chief Licensing Branch No. 2 4
Divist n of Licensing FROM:
Georq; Lear Chief Structural and Geotechnical Engineering Branch Division of Enofneering
SUBJECT:
REQUEST FOR FURTHER REVIEW 0F MARK III CONTAI?NENTS STRUCTURAL CAPACITY Peference: Memoranda from W. Butler to G. Lear, dated February 3,1934 The referenced memorandum requested the SGEB to assist the CSB in evaluating the contalment capability for both positive and negative (reverse) pressure differentials.
This evaluation was requested for four Mark III nuclear power plants namely. Clinton, Perry, Grand Gulf, and Riverbend. The CSB also requesIed the SGEB to ovaluate the drywell structural capability including the steel head for positive and negative pressure.
4 In order for the SGEB to evaluate the structural capabilities of the above mentioned structures for the requested plants, pertinent information must be provided by the plant owners. The evaluation will include, but not be limited to the fo110wf7 ftems.
1.
tiltimate capacity in tems of psig of the containment shell for positive and negat:ye (reverse) pressure.
2.
Ultimate cap city in tems of psig of the drYWell pressure retaining a
boundary for negative pressure.
3.
If the refueling pool is filled with water during operation, the effect of the water on th.a drywell including the steel head should be con'.tdered.
4 In all cases the structural region or iten which Ilmits the pressure retalning capabili y should be identified as well as the particular failure mechanism.
DOCfo 02 CF
_/
CF l
~*
,. - - = * * *
(
\\
\\
y
g,y p"l.-
, 3^ "",7 7 7 " 4 1 -e ~
.y v
n
.. s.c.pic 9, l
l p 109 :
Ai! e r t "c hwnprer yjz The evaluation skull cnsider the pressures as static, not t re ns t er, t.
However, the staf f :ay request the transier,t pressure capability at a later date.
The requestM posit!<e and negative pressure capacities are 'cr the follevin niants:
Plant Date Required C,linton September 1984 Grand Gulf September 1904 Perry April 1984 Riverbend April 1984 Your cooperation and assistance in obtaining the required infomation from the utilities is requested. The regulatory t>asts for this request can be provided by C. Stable.
Mr. Harold Folk of this branch.For further information, contact Dr. C. P. Tan and George Lear, Chief Structural and Geotechnical Engineering Branch Ofvision of Engineering cc:
W. Butler
- 0. Jeng P. T. Kuo C. P. Tan H. Polk C. Stable D. Ilouston R. W. Houston J. Stefano G. Marrison E. J. Weinkam J. Knight 5,n[5GES:DE. ;SGES:DE