Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NSD-NRC-96-4728, Forwards Nonproprietary & Proprietary Versions of Draft Chapter to Wgothic Applications Rept Scheduled for Completion in June.Draft Chapter Describes AP600 PCS Film Coverage Model.Proprietary Draft Chapter Withheld + (ML20117H435)
- ML20117H437 + (ML20117H437)
- ML20117H448 + (ML20117H448)
- ML20117H452 + (ML20117H452)
- ML20117H456 + (ML20117H456)
- ML20117H459 + (ML20117H459)
- ML20117H472 + (ML20117H472)
- LIC-96-0044, Forwards Comments on SALP Rept 50-285/96-99 + (ML20117H475)
- ML20117H486 + (ML20117H486)
- ST-HL-AE-5457, Forwards 1RE06 ISI Summary Rept for Sys Pressure Tests (Class 1 & 2) STP Electric Generating Station,Unit 1 + (ML20117H492)
- 3F0596-22, Informs NRC That FPC Completed New SBLOCA Analyses in Support of Efforts Re Improved HPI Instrumentation & Change as Stated in PCT in Accordance w/10CFR50.46 Requirements + (ML20117H503)
- ML20117H509 + (ML20117H509)
- PY-CEI-NRR-0244, Clarifies SER Section 6.3.1.3 Re Safety Relief Valve Operability.Each Automatic Depressurization Sys Valve Will Be Manually Actuated During Initial Plant Startup & After Refueling Outages to Demonstrate Operability + (ML20117H512)
- ML20117H513 + (ML20117H513)
- ML20117H523 + (ML20117H523)
- ML20117H524 + (ML20117H524)
- ML20117H535 + (ML20117H535)
- ML20117H536 + (ML20117H536)
- ML20117H541 + (ML20117H541)
- AECM-85-0155, Forwards Response to 850503 Request for Addl Info Re FSAR Startup Test 25B, Full Reactor Isolation. Startup Testing Program Ahead of Schedule.Review & Approval of Encl Info Requested to Allow Implementation of Revised Test Schedule + (ML20117H542)
- ML20117H549 + (ML20117H549)
- ML20117H556 + (ML20117H556)
- ST-HL-AE-5458, Forwards 1RE06 ISI Summary Rept for Repairs & Replacements STP Project Electric Generating Station,Unit 1 + (ML20117H557)
- ML20117H559 + (ML20117H559)
- 05000456/LER-1996-005-03, :on 960423,identified Operation of Safety Injection Accumulators Outside Design Basis.Caused by Mgt Deficiency.Operating Procedures Revised + (ML20117H562)
- ML20117H563 + (ML20117H563)
- ML20117H571 + (ML20117H571)
- TXX-9637, Forwards Supplemental Response to NRC Bulletin 96-001, Control Rod Insertion Problems + (ML20117H575)
- 05000302/LER-1996-014, :on 960325,discovered That ASME Section XI Category B-K-1 Exam Not Performed.Caused by Personnel Error. All Category B-K-1 Insps Identified & Completed During Refuel 10 + (ML20117H578)
- LIC-96-0071, Forwards Application for Amend to License DPR-40 & TS, Relocating Operability Requirements for Shock Suppressors (Snubbers) from TS to USAR & or Plant Procedures & Incorporating Snubber Exam & Testing Requirements in TS 3.3 + (ML20117H581)
- ML20117H585 + (ML20117H585)
- ML20117H587 + (ML20117H587)
- 05000423/LER-1996-010-02, :on 960425,determined That Potential Failure Mode of Rod Control Sys Acopian Power Supplies Could Create Unanalyzed Condition.Caused by Inadequate Design Review. Reset Feature Will Be Deleted + (ML20117H588)
- ML20117H593 + (ML20117H593)
- 05000302/LER-1996-015, :on 960408,determined That Cables Routed Improperly Due to Personnel Error.Cables Routed to MCB-SSR Replaced W/Appropriate Cables & Mods of Circuits Associated W/Toxic Gas Monitors Completed + (ML20117H598)
- ML20117H607 + (ML20117H607)
- ML20117H612 + (ML20117H612)
- ML20117H616 + (ML20117H616)
- ML20117H617 + (ML20117H617)
- 05000293/LER-1996-005, :on 960419,automatic Scram Occurred Due to Turbine Vibration During Planned Power Reduction.Turbine Vibration Trip Setting That Initiates Trip of Turbine Due to High Vibration Changed + (ML20117H620)
- ML20117H621 + (ML20117H621)
- LIC-96-0059, Requests Relief from ASME B&PV Code,Section III Overpressure Protection Requirements for Ccws + (ML20117H631)
- ML20117H632 + (ML20117H632)
- LIC-96-0072, Discusses 960418 Telcon Involving NRC & Util Re Util Providing Clarification of Methodology Involved in Human Reliability Analyses Portion of Plant IPE + (ML20117H633)
- ML20117H652 + (ML20117H652)
- LIC-96-0073, Forwards Public & Central Files Versions of Revised EPIPs & Radiological Emergency Response Plan.Central Files Version Revised EPIPs Withheld + (ML20117H655)
- ML20117H658 + (ML20117H658)
- ML20117H662 + (ML20117H662)
- 05000395/LER-1996-008, :on 960805,plant Personnel Discovered That STP-501.001,had Been Performed on B Train Station Battery, While Battery Was on Equalize Charge.Caused by Procedural Inadequacy.Procedure Has Been Changed + (ML20117H668)
- ML20117H671 + (ML20117H671)
- ML20117H672 + (ML20117H672)