ML20117H523
ML20117H523 | |
Person / Time | |
---|---|
Site: | Browns Ferry |
Issue date: | 05/20/1996 |
From: | TENNESSEE VALLEY AUTHORITY |
To: | |
Shared Package | |
ML20117H516 | List: |
References | |
RTR-NUREG-1433 GL-87-09, GL-87-9, NUDOCS 9605280239 | |
Download: ML20117H523 (14) | |
Text
. ~
ENCLOSURE 2 TERNESSEE VALLEY AUTHORITY I BROWS PERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS-373 l NARKED PAGES I. AFFECTED PAGE LIST Unit 1 Unit & Unit 3 1.0-11 1.0-11 1.0-11 II. MARKED PAGES See attached.
3>
l l
l 9605280239 960520 PDR ADOCK 05000259 P PDR
- I ,
1 1.0 DEFINITIONS (Cont'd)
E O2E GG. Site Boundarv - Shall be that line beyond which the land is not owned, leased, or otherwise controlled by TVA.
l HE. Unrestricted Area - Any area at or beyond the SITE BOUNDARY to
, which access is not controlled by the licensee for purposes of l protection of individuals from exposure to radiation and 4 radioactive materials or any area within the SITE BOUNDARY used
! for industrial, commercial, institutional, or recreational l purposes.
l II. Dose Eauivalent I-131 - The DOSE EQUIVALENT I-131 shall be the i concentration of I-131 (in pCi/gs) which alone would produce
} the,same thyroid dose as the quantity and isotopic mixture of 1 I-131, I-132, I-133, I-134, and I-135 actually present. The i thyroid dose conversion factor used for this calculation shall l be those listed in Table III of TID-14844 " Calculation of j Distance Factors for Power and Test Reactor Sites".
l JJ. Gaseous Waste Treatment System - The charcoal adsorber vessels i installed on the discharge of the steam jet air ejector to provide delay to a unit's offgas activity prior to release.
l KK. Members of the Public - An individual in a controlled or d
UNRESTRICTED AREA. However, an individual is not a MEMBER OF i THE PUBLIC during any period in which the individual receives j an occupational dose (as defir.ed in 10 CFR 20).
I
- LL. Surveillance - Surveillance Requirements shall be met during !
! the OPERATIONAL CONDITIONS or other conditions specified for j j individual limiting conditions for operation unless otherwise l I stated in an individual Surveillance Requirements. Each Surveillance Requirement shall be performed within the ,
j specified surveillance interval with a maximum allowable j
- extension not to exceed 25 percent of the specified i surveillance interval. It is not intended that this j (extension) provision be used repeatedly as a convenience to i l extend surveillance intervals beyond that specified for j j surveillances that are not perfgrmed during refueling outages. 1 1
I Performance of a Surveillance Requirement within the specified j time interval shall constitute compliance and OPERABILITY requirements for a limiting condition for operation and associated action statements unless otherwise required by thase specifications. Surveillance Requirements do not have to be performed on inoperable equipment, j T/lk2+ A -
BFW 1.0-11 AMENDMENT NO. 2 01 Unit 1 4
U 1.0.LL DEFINITION INSERT A l
If it' is diacovered that a surveillance was not performed within its specified frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, l up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified frequency,
, whichever is less. This delay period is permitted to allow l
performance of the surveillance. ,
If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable condition (s) must be entered.
' When the surveillance is performed within the delay period and the surveillance is not met, the LCO must immediately be declared not ;
met, and the applicable condition (s) must be entered.
1 i
l 1
I I
4 1
e I
l .
T 1.0 DEFINITIONS (Cont'd) DEC 0 21993 GG. Site Boundary - Shall be that line beyond which the land is not owned, leased, or otherwise controlled by TVA.
HE. Unrestricted Area - Any area at or beyond the SITE BOUNDARY to which acecas is not controlled by the licensee for purposes of protection of individuals from exposure to radiation and j radioactive materials or any area within the SITE BOUNDARY used for' industrial, commercial, institutional, or recreational j purposes.
1 II. Dose Eauivalent I-131 - The DOSE EQUIVALENT I-131 shall be the i
concentration of I-131 (in pCi/ga) which alone would produce the same thyroid dose as the quantity and isotopic mixture of I-131, I-132, I-133, I-134, and I-135 actually present. The thyroid i dose conversion factor used for this calculation shall be those listed in Table III of TID-14844 " Calculation of Distance Factors j for Power and Test Reactor Sites".
i JJ. Gameous Waste Treatment System - The charcoal adsorber vessels
! installed on the discharge of the steam jet air ejector to ,
- provide delay to a unit's offgas activity prior to release.
i KK. Members of the Public - An individual in a controlled or
- UNRESTRICTED AREA. However, an individual is not a MEMBER OF THE i
PUBLIC during any period in which the individual receives an occupational dose (as defined in 10 CFR 20).
l LL. Surveillance - Surveillance Requirements shall be met during the i OPERATIONAL CONDITIONS or other conditions specified for
. individual limiting conditions for operation unless otherwise
! stated in an individual Surveillance Requirements. Each
! Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to
! exceed 25 percent of the specified surveillance interval. It is j not intended that this (extension) provision be used repeatedly
- as a convenience to extend surveillance Mtervals beyond that specified for surveillances that are not performed during refueling outages.
) Performance of a Surveillance Requirement within the specified time interval shall constitute compliance and OPERABILITY requirements for a limiting condition for operation and associated action statements unless otherwise required by these specifications. Surveillance Requirements do not have to be performed on inoperable equipment.
In2O 4 .
BFs 1.0-11 AMENDMENT NO. 2 20 Unit 2
- 1
1.0.LL DEFINITION INSERT A If it' is discovered that a surveillance was not performed within its specified frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified frequency, whichever is less. This delay period is permitted to allow perf.ormance of the surveillance.
If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable condition (s) must be entered.
i l
When the surveillance is performed within the delay period and the j surveillance is not met, the LCO must immediately be declared not met, and the applicable condition (s) must be entered. l l
l
1 .
{I 1.0 DEFINITIONS (Cent'd)
DEC 0 21993
!- GG. Site Boimdarv - Shall be that line beyond which the land is not
!' i l
owned, leased, or otherwise controlled by TVA. l 2
f HE. Unrestricted Area - Any area at or beyond the SITE BOUNDARY to '!
I which access.is not controlled by the licensee for purposes of l
' protection of individuals from exposure to radiation and '
radioactive materials or any area within the SITE BOUNDARY used i for industrial, commercial, institutional, or recreational {
} purposes.
I II. Dome Eaulvalent I-131 - The DOSE EQUIVALENT I-131 shall be the I
concentration of I-131 (in pCi/sm) which alone would produce the same thyroid dose as the quantity and isotopic mixture of~I-131, I-132, I-133, I-134, and I-135 actually present. The thyroid l
dose conversion factor used for this calculation shall be those
! listed in Table III' of TID-14844 " Calculation of Distance l
e Factors for Power and Test Reactor Sites".
! JJ. Gaseous Waste Treatment System - The charcoal adsorber ven.sels j installed on the discharge of the steam jet air ejector to
! provide delay to a unit's offgas activity prior to release.
b EK. M -hers of the Public - An individual in a controlled or l UNRESTRICTED AREA. However, an individual is not a MEMBER OF THE PUbLIC during any period in which the individual receives an i occupational dose (as defined in 10 CFR 20).
I LL. Surveillance - Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS or other conditions specified for
! individual limiting conditions for operation unless otherwise
- . stated'in an individual Surveillance Requirements. Each 4
Surveillance Requirement shall.be performed within the specified
! surveillance interval with a maximum allowable extension not to l exceed 25 percent of the specified surveillance interval. It is i not intended that this (extension) provision be used repeatedly i as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during l refueling outages. 1 1
Performance of a Surveillance Requirement within the upecified time interval shall constitute compliance and OPERABILITY requirements for a limiting condition for operation and associated action statements unless otherwise required by these specifications. Surveillance Requiremente do not have to be performed on inoperable equipment.
r Tnsce A BFN 1.0-11 AMENDME!E NO.174 Unit 3
_ ,m -~ 7 - .,
%-- -_- _ _ - - + m ,, -, _ - _
-c - , -
9 i
1.0.LL DEFINITION i INSERT A If it' is discovered that a surveillance was not performed within its specified frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, l up to 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or up to the limit of the specified frequency, I whichever is less. This delay period is permitted to allow performance of the surveillance. )
i If the surveillance is not performed within the delay period, the :
LCO must immediately be declared not met, and the applicable l condition (s) must be entered. j i
When the surveillance is performed within the delay period and the l surveillance is not met, the LCO must immediately be declared not i met, and t he applicable condition (s) must be entered. ;
1 l
l l
j 4
. \
ENCLOSURE 3 TENNESSEE VALLEY AUTHORITY BROWNS FERRY NUCLEAR PLANT (BFN)
UNITS 1, 2, AND 3 PROPOSED TECHNICAL SPECIFICATION (TS) CHANGE TS-373 REVISED PAGES
[
I. AFFECTED PAGE LIST llDit i lin.lt;._1 Unit 3 1.0-11 1.0-11 1.0-11 1.0-12 1.0-12 1.0-12 II. REVISED PAGES See attached.
i l
l l
l
1 . -l
. l i -
) 1.0 DEFINITIONS - (Cont ' d)
~
oo. sita nonnd=rv - Shall be that line beyond which the land its not owned, leased, or otherwise controlled by TVA.
j- HH. Unrestricted Area - Any area at or beyond the SITE BOUNDARY to which L access is not controlled by the licensee for purposes of protection l of individuals from exposure to radiation and radioactive materials i
or any area within the SITE BOUNDARY used for industrial, commercial, institutional, or recreational purposes.
r
-II. Dona nauivalent I-131 -
The DOSE EQUIVALENT I-131 shall be the i-
- concentration of I-131' (in ' C1/gm) which alone would produce the same thyroid dose as the quantity and isotopic mixture of I-131,:I-132, I-l' 133, I-134, and I-135 actually present. The thyroid dose conversion I factor used for this calculation shall be'those listed in Table III
- of TID-14844 " Calculation of Distance Factors for Power and Test i Reactor Sites".
l JJ. Gaseous Wasta Treatment System - The charcoal adsorber vessels
! installed on the discharge of the' steam jet air ejector to provide i delay to a unit's offgas activity prior to release.
KK. " =ra of the public An individual in a controlled or UNRESTRICTED AREA. However, an individual is'not a MEMBER OF THE PUBLL': during any period in which the individual receives an occupational dose ~ (as
- . defined in 10 CFR 20).
- f. .
! LL. Surveillance - Surveillance Requirements shall be met during the i OPERATIONAL CONDITIONS or other conditions-specified for individual 4 limiting conditions for operation unless otherwise stated in an d' individual Surveillance Requirements. ~Each Surveillance Requirement l shall be performed within the'specified surveillance interval with a i maximum allowable extension not to exceed 25 percent of the specified i surveillance interval. It.is not intended that this (extension) provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not j performed during refueling outages. !
Performance of a Surveillance Requirement within the specified time interval shall constitute compliance and OPERABILITY requirements for l a limiting condition for operation and associated action statements unless otherwise required by these specifications. Surveillance j Requirements do not have to be performed on inoperable equipment. l If it is discovered that a surveillance was not performed within its specified frequency, then compliance with the requirement to declare the LCO not met may be delayed, from the time of discovery, up to 24 ,
hours or up to the limit of the specified frequency, whichever is l less. This delay period is permitted to allow performance of the surveillance.
BFN 1.0-11 Unit 1
. 1 1.0 DEFINITIONS (Cont'd)
If the surveillance is not performed within the delay period, the LCO I must immediately be declared not met, and the applicable condition (s) must be encored. -
l When the surveillance is performed within the delay period and the l surveillance is not met, the LCO must immediately be declared not I met, and the applicable condition (s) must be entered. I l
I MM. Surveillance Requirements for ASME Section XI Pump and Valve Program l
- Surveillance Requirements for Inservice Testing of ASME Code Class 1, 2, and 3 components shall be applicable as follows: )
I
- 1. Inservice testing of ASME Code Class 1, 2, and 3 pumps and l
valves shall be performed in accordance with Section XI of the l ASME Boiler and Pressure Code and applicable Addenda as required by 10 CFR 50, Section 50.55a (g) , except where specific written relief has been granted by the Commission pursuant to l 10 CFR 50, Section 50.55 (g) (6) (i) .
- 2. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the l inservice testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable as follows in these technical specifications:
ASME Boiler and Pressure Vessel Required frequencies Code and applicable Addenda for performing inservice terminology for inservice testina activities testinc activities
- Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366 days
- 3. The provisions of Specification 1.0.LL are applicable to the above required frequencies for performing inservice testing activities.
- 4. Performance of the above inservice testing activities shall be in addition to other specified surveillance requirements.
- 5. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any technical specification.
- 6. The inservice inspection program for piping identified in NRC l
Generic Letter 88-01 shall be performed in accordance with the staff positions on schedule, methods, personnel, and sample expansion included in this generic letter.
! BFN 1.0-12 Unit 1
a s
1.0 DEFINITIONS (Cont'd) l GG. Site soundarv - Shall be that line beyond which the land is not {
owned, leased, or otherwise controlled by TVA. i l
HH. unrestricted Area - Any area at or beyond the SITE BOUNDARY to which l access is not controlled by the licensee for purposes of protection l of individuals from exposure to radiation and radioactive materials !
or any area within the SITE BOUNDARY used for industrial, commercial, institutional, or recreational purposes.
II. Dose Eauivalent I-131 - The DOSE EQUIVALENT I-131 shall be the ;
concentration of I-131 (in Ci/gm) which alone would produce the same i thyroid dose as the quantity and isotopic mixture of I-131, I-132, I- j 133, I-134, and I-135 actually present. The thyroid dose conversien i factor used for this calculation shall be those listed in Table III I of TID-14844 " Calculation of Distance Factors for Power and Test l Reactor Sites". I l
JJ. cameous wantc 7;yatment Svstem - The charcoal adsorber ve3sels installed on due discharge of the steam jet air ejector to provide delay to a unit's offgas activity prior to release.
I KK. Members of the Public - An individual in a controlled or UNRESTRICTED )
AREA. However, an individual is not a MEMBER OF THE PUBLIC during 1 any period in which the individual receives an occupational dose (as
]
defined in 10 CFR 20).
i LL. Surveillanqa - Surveillance Requirements shall be met during the )
OPERATIONAL CONDITIONS or other conditions specified for individual J 4
limiting conditions for operation unless otherdise stated in an individual Surveillance Requirements. Each Surveillance Requirement )
shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval. It is not intended that this (extension) provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages.
I Performance of a Surveillance Requirement within the specified time interval shall constitute compliance and OPERABILITY requirements for a limiting condition for operation and associated action statements unless otherwise required by these specifications. Surveillance Requirements do not have to be performed on inoperable equipment.
4 If it is discovered that a surveillance was not performed within its j specified frequency, then compliance with the requirement to declare ;
the LCO not met may be delayed, from the time of discovery, up to 24 )
hours or up to the limit of the specified frequency, whichever is i less. This delay period is permitted to allow performance of the I surveillance.
l BFN 1.0-11 Unit 2
- . . , .. . 2 a -
1.0- DEFINITIONS (Cont'd)
I If the surveillance is not performed within the delay period, the LCO '
must immediately be declared not met, and the applicable condition (s) must be entered. <
When the surveillance is performed within the delay period and the surveillance is not met, the Leo must immediately be declared not met, and the applicable condition (s) must be entered.
MM. Surveillance Reauirements for ASME Section TI Pmm and Valve Program
- Surveillance Requirements for Inservice Testing of ASME Code Class 1, 2, and 3 components shall be applicable ss follows:
, 1. Inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the ASME Boiler and Pressure Code and applicable Addenda as required by 10 CFR 50, Section 50. 55a (g) ,, except where specific written relief has been granted by the Commission. pursuant to 10 CFR 50, Section 50.55 (g) (6) (i) .
- 2. Surveillance intervals specified in Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda for the inservice testing activities required by t.he ASME Boiler and Pressure Vessel Code and applicable Addendt shall be applicable as follows in these technical specifications: J ASME Boiler asa fiessure Vessel Required frequencies Code and applicable Addenda for percforming inservice ;
terminology for inservice testing activities I testina activities l
Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days i Every 9 months At least once per 276 days I Yearly or annually At least once per 366 days
- 3. The provisions of Specification 1.0.LL are appAicable to the above required frequencies for performing inservice testing activities.
- 4. Performance of the above inservice testing activities shall be in addition to other specified surveillance requi.rements.
- 5. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any terhnical specification.
- 6. The inservice inspection program for piping identified in NRC Generic Letter 88-01 shall be performed in accordance with the staff positions on schedule, methods, personnel, and sample expansion included in this generic letter.
BFN 1.0-12 Unit 3
l o
( .-
- i l
j 1.0 DEFINITIONS (Cont'd) i GG. Site Boundarv - Shall be that line beyond which the land is not owned, leased, or otherwise controlled by TVA.
HH. nnrestricte.d Area - Any area at or beyond the SITE BOUNDARY to which access is not controlled by the licensee for purposea of protection of individuals from exposure to radiation and radioactive materials or any area within the SITE BOUNDARY used for industrial, commercial, institutional, or recreational purposes.
II.
Dose Eadivalent T-131 - The DOSE EQUIVALENT I-131 shall be the concentration of I-131 (inyCi/gm) which alone would produce the same thyroid dose as the quantity and isOLogic mixture of I-131, I-132, I-133, I-134, and I-135 actually present. The thyroid dose conversion factor used for this calculation shall be those listed in Table III of TID-14844 " Calculation of Distance Factors for Power and Test Reactor Sites".
JJ. Gaseous waste Treatment System - The charcoal adsorber vessels installed on the discharge of the steam jet air ejector to provide delay to a unit's effgas activity prior to release.
KK. Members of the Public - An individual in a controlled or UNRESTRICTED AREA. However, an individual is not a MEMBER OF THE PUBLIC during any period in which the individual receives an occupational dose (as defined in 10 CFR 20) .
LL. Surveillance - Surveillance Requirements shall be met during the OPERATIONAL CONDITIONS or other conditions specified for individual limiting conditions for operation unless otherwise stated in an individual Surveillance Requirements. Each Surveillance Requirement shall be performed within the specified surveillance interval with a maximum allowable extension not to exceed 25 percent of the specified surveillance interval. It is not intended that this (extension) provision be used repeatedly as a convenience to extend surveillance intervals beyond that specified for surveillances that are not performed during refueling outages.
Performance of a Surveillance Requirement within the specified time interval shall constitute compliance and OPERJBILITY requirements for a limiting condition for operation and associated action statements unless otherwise required by these specifications. Surveillance k'equirements do not have to be performed on inoperable equipment.
If it is discovered that a surveillance was not performed within its specified frequency, then compliance with the requirement to declare l
the LCO not met may be delayed, from the time of discovery, up to 24 l hours or up to the limit of the specified frequency, whichever is
! less. This delay period is permitted to allow performance of the surveillance.
{ BFN 1.0-11 Unit 3 l
l l
l .
- . . . ~ . . - - _ - ~ . ~ . ._ _- . - --
l l
1.0 DEFINITIONE (Cont'd)
If the surveillance is not performed within the delay period, the LCO must immediately be declared not met, and the applicable condition (s) i must be entered. .
l l
when the surveillance is performed within the delay period and the surveillance is not met, the LCO must immediately be declared not met, and the applicable condition (s) must be entered.
MM. Surveillance Requirements for ASME Section XI Pump and Valve Program
- Surveillance Requirements for Inservice Testing of ASME Code Class
, 1, 2, and 3 components shall be applicable as follows: I i
- 1. Inservice testing of ASME Code Class 1, 2, and 3 pumps and valves shall be performed in accordance with Section XI of the !
ASME Boiler and Pressure Vessel Code and applicable Addenda as l required by 10 CFR 50, Section 50.55a (g), except where specific l written relief has been granted by the Commission pursuant to l 10 CFR 50, Section 50.55a (g) (6) (i) . i
- 2. Surveillance intervals specified in Section XI of the ASME i Boiler and Pressure Vessel Code and applicable Addenda for the I inservice testing activities required by the ASME Boiler and Pressure Vessel Code and applicable Addenda shall be applicable
~
as follows in these technical specifications: l ASME Boiler and Pressure Vessel Required frequencies Code and applicable Addenda for performing inservice terminology for inservice testine activities testina activities- .
Weekly At least once per 7 days Monthly At least once per 31 days Quarterly or every 3 months At least once per 92 days Semiannually or every 6 months At least once per 184 days Every 9 months At least once per 276 days Yearly or annually At least once per 366_ days l
- 3. The provisions of Specification 1.0 LL are applicable to the above required frequencies for performing inservice testing activities.
- 4. Performance of the above inservice testing activities shall be in addition to other specified surveillance requirements.
- 5. Nothing in the ASME Boiler and Pressure Vessel Code shall be construed to supersede the requirements of any technical specification.
l 6. The inservice inspection program for piping identifed in NRC
( Generic Letter 88-01 shall be performed in accordance with the
' staff positions on schedule, methods, personnel, and sample expansion included in this generic letter.
i i f
BFN 1.0-12 Unit 3
! l l
i
.