ML20117H535

From kanterella
Jump to navigation Jump to search
Forwards Rev 0 to Toed Davis-Besse Unit 1 Cycle 11 COLR & Addendum 1 to Rev 1 to BAW-2271, Davis-Besse Nuclear Power Station Unit 1, Cycle 11 -- Reload Rept & Addendum
ML20117H535
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 05/22/1996
From: Stetz J
CENTERIOR ENERGY
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117H538 List:
References
2380, NUDOCS 9605280244
Download: ML20117H535 (1)


Text

'

t

.1 i

g cswrnmon W

ENERGY

(

300 h h ue JohnP.$setz foisdo, OH 43652 0001 Vice Pfesident - Nuclear 419-249 2300 I

Doh-m Docket Number 50-346 License Number NPF-3 Serial Number 2380 May 22, 1996 United States Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

Subject:

Core Operating Limits Report and Reload Report for Cycle 11 Ladies and Gentlemen:

Enclosed is a copy of the Davis-Besse Nuclear Power Station, Unit 1 (DBNPS) Core Operating Limits Report (COLR) for Cycle 11 operation (Enclosure I).

The COLR is being submitted in accordance with DBNPS Technical Specification 6.9.1.7.

In addition, an information only copy of the DBNPS Cycle 11 Reload Report is provided as Enclosure II.

If you have any questions, please contact Mr. J. L. Freels, Manager -

Regulatory Affairs, at (419) 321-8466.

Very truly yours, MKL/laj i

Enclosures cc:

L. L. Gundrum, DB-1 NRC/NRR Project Manager H. J. Miller, Regional Administrator, NRC Region III S. Stasek, DB-1 NRC Senior Resident Inspector Utility Radiological Safety Board i

280031 9605290244 960322 PDR ADOCK 05000346 P

PDR Operating Companies Cleveland Electne liluminating l

Toledo Edison