Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20117D821 + (ML20117D821)
- 05000321/LER-1996-005, :on 960414,supply Breaker for 4160V/600V Station Svc Transformer 1D Opened de-energizing 600V Bus 1R23-S004.Caused by Personnel Error.Personnel Involved Counseled + (ML20117D825)
- 05000219/LER-1996-003, :on 960409,determined Certain 4160 Vac Emergency Electrical Bus Grid Undervoltage Relay Contacts Not Functionally Tested Required by TS Table 4.1-1,Items 28 a & B.Caused by Inadequate Testing + (ML20117D840)
- 05000263/LER-1996-003, Forwards LER 96-003-00 Re re-analysis of High Energy Line Break,Error Found in Existing Analysis.Rept Contains Submitted New NRC Commitments + (ML20117D841)
- 05000263/LER-1996-003-01, :on 960404,personnel Identified Error in Current Licensing Basis Analysis.Caused by Improper Analyzed Ambient Temps in Vicinity.Mods Will Be Installed During Current Outage + (ML20117D846)
- 05000322/LER-1985-013, :on 850407,failure of HPCI Circuit Inverter Rendered HPCI Sys Inoperable.Caused by Failure of Cooling Fan Causing Inverter Cabinet & Circuitry to Overheat. Procedures for Fan Insp Will Be Revised + (ML20117D848)
- ML20117D851 + (ML20117D851)
- ML20117D864 + (ML20117D864)
- ML20117D876 + (ML20117D876)
- ML20117D877 + (ML20117D877)
- 2CAN038505, Provides Justification That Senior Reactor Operators Adequately Trained to Cope W/Emergency Situations.Scope of Training for Future Senior Reactor Operator Candidates Will Place More Emphasis on Emergency Plan Training + (ML20117D878)
- JAFP-96-0200, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Core or Over Safety-Related Equipment, + (ML20117D880)
- ML20117D886 + (ML20117D886)
- ML20117D891 + (ML20117D891)
- ML20117D912 + (ML20117D912)
- ML20117D919 + (ML20117D919)
- NRC-96-0048, Requests NRC Review & Approval of Proposed QA Program Change for Audit Program,Deleting Frequencies from Audits Specified by Regulations & Deleting Requirement to Perform Annual Audit of Fitness for Duty Lab + (ML20117D931)
- ML20117D953 + (ML20117D953)
- 05000373/LER-1985-036-01, :on 850403,RHR Inboard Shutdown Cooling Suction Isolation Valve 1E12-F009 Isolated.Caused by Spurious Pressure Spike.Pressure Snubbers Installed & Upgrades for Environ Qualification Reviewed + (ML20117D959)
- ML20117D968 + (ML20117D968)
- DCL-96-102, Submits Change 8 to Rev 18 of Physical Security Plan,Per 10CFR50.54(p).Encl Withheld + (ML20117D970)
- ML20117D971 + (ML20117D971)
- ML20117D974 + (ML20117D974)
- ML20117D993 + (ML20117D993)
- ML20117D996 + (ML20117D996)
- ML20117D997 + (ML20117D997)
- ML20117E004 + (ML20117E004)
- RBG-20753, Responds to NRC Re Violations Noted in Insp Rept 50-458/85-02.Corrective Actions:Ansi & ASME Codes Reviewed for Spare Parts Storage Requirements & MSP-0002 Revised to Clarify Methods Used to Meet Requirements + (ML20117E009)
- ML20117E025 + (ML20117E025)
- ML20117E037 + (ML20117E037)
- ML20117E048 + (ML20117E048)
- ML20117E052 + (ML20117E052)
- ML20117E056 + (ML20117E056)
- RBG-20183, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-28.Corrective Actions:Qa Sys Audited Until Maint to Address Preventive Maint of Equipment & QA Instruction 2.1, Audit Performance & Reporting, Revised + (ML20117E060)
- ML20117E065 + (ML20117E065)
- ML20117E068 + (ML20117E068)
- ML20117E074 + (ML20117E074)
- ML20117E079 + (ML20117E079)
- AECM-85-0129, Forwards Revised Fire Protection Review Summary Rept,Per 10CFR50,App R & Bechtel Rept, Fire Hazards Analysis,Grand Gulf Nuclear Station,Unit 1. Review of Mods Increasing Fire Protection Requested.Fee Paid + (ML20117E082)
- ML20117E085 + (ML20117E085)
- ML20117E086 + (ML20117E086)
- ML20117E096 + (ML20117E096)
- ML20117E102 + (ML20117E102)
- ML20117E106 + (ML20117E106)
- ML20117E130 + (ML20117E130)
- ML20117E146 + (ML20117E146)
- HL-5171, Discusses Gpc Determination to Follow BWR Vessel & Internals Project:Guidelines for Reinspection of BWR Core Shrouds (BWRVIP-07) for Hatch Units 1 & 2 + (ML20117E148)
- ML20117E152 + (ML20117E152)
- ML20117E166 + (ML20117E166)
- ML20117E168 + (ML20117E168)
- ML20117E170 + (ML20117E170)