Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20114B628 + (ML20114B628)
- ML20114B632 + (ML20114B632)
- ML20114B633 + (ML20114B633)
- 05000397/LER-1984-127, :on 841218,during Wiring Changes to Auxiliary Steam Sys,Automatic Isolation of Reactor Water Cleanup (RWCU) Sys Occurred.Logic Signal Reset & RWCU Sys Returned to Svc + (ML20114B635)
- ML20114B636 + (ML20114B636)
- ML20114B637 + (ML20114B637)
- ML20114B640 + (ML20114B640)
- ML20114B644 + (ML20114B644)
- ML20114B645 + (ML20114B645)
- ML20114B647 + (ML20114B647)
- ML20114B650 + (ML20114B650)
- ML20114B651 + (ML20114B651)
- ML20114B659 + (ML20114B659)
- ML20114B660 + (ML20114B660)
- ML20114B661 + (ML20114B661)
- ML20114B671 + (ML20114B671)
- ML20114B673 + (ML20114B673)
- ML20114B676 + (ML20114B676)
- ML20114B682 + (ML20114B682)
- ML20114B683 + (ML20114B683)
- 05000389/LER-1984-016-02, :on 841219,turbine/reactor Trip Occurred on Low Vacuum Due to Condensate Pump 2B Recirculation Line Crack. Cause Not Stated.Recirculation Line,Breaker & Reactor Coolant Pressure Seals Replaced + (ML20114B687)
- ML20114B696 + (ML20114B696)
- ML20114B707 + (ML20114B707)
- ML20114B708 + (ML20114B708)
- A04566, Responds to NRC Re Violations Noted in Insp Rept 50-423/84-20.Corrective Actions:S&W Field QC & QA Personnel Initiated Surveillance Insp to Ensure Compliance W/Welding Electrode Procedure & Welder Involved Terminated + (ML20114B716)
- ML20114B718 + (ML20114B718)
- ML20114B719 + (ML20114B719)
- ML20114B720 + (ML20114B720)
- ML20114B724 + (ML20114B724)
- ML20114B728 + (ML20114B728)
- ML20114B729 + (ML20114B729)
- ML20114B731 + (ML20114B731)
- ML20114B736 + (ML20114B736)
- ML20114B741 + (ML20114B741)
- ML20114B748 + (ML20114B748)
- ML20114B751 + (ML20114B751)
- ML20114B752 + (ML20114B752)
- ML20114B754 + (ML20114B754)
- AECM-85-0018, Forwards Evaluation of RHR Relief Valve Condensation Oscillation Loads on Structures & Piping.Info Demonstrates That All Loads Which Could Be Produced by Actuation of RHR HX Relief Valves Acceptable + (ML20114B756)
- ML20114B758 + (ML20114B758)
- ML20114B759 + (ML20114B759)
- ML20114B764 + (ML20114B764)
- ML20114B765 + (ML20114B765)
- ML20114B769 + (ML20114B769)
- ML20114B773 + (ML20114B773)
- ML20114B774 + (ML20114B774)
- ML20114B776 + (ML20114B776)
- ML20114B780 + (ML20114B780)
- ML20114B781 + (ML20114B781)
- 05000443/LER-1992-009, :on 920729,determined That 18-month Surveillance Testing Program for Reactor Trip Breakers & Reactor Trip Bypass Breakers Did Not Test Shunt Trip Circuits.Caused by Inadequate Procedure + (ML20114B783)
- ML20114B784 + (ML20114B784)