Part 21 Rept Re Possible Field Failure of Wellman Co Space Heaters on GE Motors Supplied W/Pumps.Caused by Carbonization of Epoxy End Plug & Subsequent short-out of Lead Wires.Replacement Heaters to Be Supplied
ML20114B645
Person / Time
Site: Vogtle  
Issue date: 01/24/1985
From: Ganoung P
GUY F. ATKINSON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
REF-PT21-85, REF-PT21-85-048-000 PT21-85-048-000, PT21-85-48, QAG-#85-14, NUDOCS 8501290393
Download: ML20114B645 (4)


Text

_

Bingham-Willamette Company A Dinston of Guy F Atkinson Company QAC #85-14 January 24, 1985 US Nuclear Regulatory Commission Vendor Program Branch Washington, D.C. 20555

Subject:

10CFR Part 21 - Reporting of Possible Field Failure of Space Heaters Supplied on General Electric Motors Gentlemen:

Per the requirements of 10CFR Part 21, Bingham Willamette Company hereby advises that the motors supplied with pumps for Bechtel/ Georgia Power Company, Vogtle Plant may have Wellman Company manuf actured space heatere which could cause a possible field failure. Bingham received notification from General Electric Company, Small AC Motor Department, Mr. Ken Kool, Product Service Engineer, San Jose, California, dated 1/18/85 --Attachment I.

We have formally notified Georgia Power Company of this matter and requested an inspection of motors to determine if any Wellman space heaters were supplied (AttachmentII).

A possible field failure exists if the end plug where the leads ex n arc epoxy, eventually the epoxy carbonizes and the lead wires short out.

This same condition may exist on motors supplied with pumps to Bechtel Power for Taiwan Power. Bingham Willamette Company has also notified Bechtel of this matter, although this would not directly fall under the jurisdiction of 10CFR Part 21. Bingham knows of no other pumps supplied with motors to other nuclear power plants with Space heaters from Wellman Company.

Corrective action has been as follows:

(1) Notification to appropriate customers to inspect motors and report any Wellman Space Heaters simultaneously to Bingham Willamette Company and General Electric Company, no later than February 1, 1985.

(2) General Electric-Company to supply replacement heaters.

(3) Bingham Willamette recommends that Georgia Power negotiate any required replacement heaters with Mr. Ken Kool, General Electric Company, San Jose, California to complete the action required no later than February 28, 1985.

Bingham Willamette Company will assit to obtain corrective action within the dates designated above Very truly yours, BINGHAM WILLAMETTE COMPANY cc: J W. Reece 1

Patricia A. Ganoung i

10CFR Part 21 File Manager, Quality Assurance 2800 N.W. Front Avenue Post office Box 10247

  • Portland, Oregon 97210 U.S.A. - (503) 226-5200
  • Telex: 360-516 TWX: 910-464-8031 s8reveport. Lows ana. u s A. Bu naoy, 6ni sh coiume.a. canada. camondge. oniano. canada. Edmoriton. A!bena Canada Pematone, Engfand r

8501290393 850124 PDR ADOCK 05000424 S

PDR

' Bingham-Willam;tta Company a o.i.,on o, our. 4, minion c '""*"'

@@MM2 r

January 24, 1985 Georgia Power Company Vogtle Plant P.O. Box 282 Waynesboro, GA 30830 Attention: Mr. H.H. Gregory, III, Project Construction Manager Mr. George Bockhold, Jr., Plant Manager Mr. B.E. Wilson, Vogtle Plant Proj. Procurement Manager Referece:

10CFR Part 21 - Possible Field Failure of Space Heaters Supplied on Specific G.E. Motors Gentlemen:

Per the requirements of 10CFR Part 21, Bingham Willamette Company hereby advises that the motors supplied with pumps on Georgia Power P.O. #PAV-625 and PAV2-67 may have Wellman Company manufactured space heaters which could cause a possible field failure (reference letter from General Electric Company, Small AC Motor Department, San Jose, California, dated January 18, 1985, Attachment I).

Attachment II lists BWC Sales Order, model/ size of pumps and equipment identification number of the pumps applicable to P.O. #PAV-625 and PAV-67.

Please inspect the attached equipment and simultaneously notify Bingham-Willamette Company and General Electric Company of any Wdllman space heaters with model and serial number of each motor no later than February 1, 1985.

Bingham-Willamette Company recommends that you directly negotiate supply of any required replacement heaters with Mr. Ken Kool, General Electric Company, San Jose, California, Product Service Engineer.

Bingham-Willamette Company will assist to obtain a timely resolution as requested.

cc; Mr. M. Malcom-Bechtal Power Corp.

Very Truly Yours, R, Logan T, Morton BINGHAM-WILLAMETTE COMPANY J. Schaeffer bC Pa t 21 File D

.atricia A. Ganoung

()

Quality Assurance Manager 2800 N.W. Front Avenue

  • Post Office Box 10247 Portland, Oregon 97210 u S A. * (503) 226-5200
  • Telex: 360-516 TWX: 910-464-8031 shievepo i. Louisiana. u s A. Burnaby. e< t.sn cotumbia. canada. cambrioge. ontse.o. canada. Edmonton Albena. Canada e Penistone Eng!and

o

~

' GENER AL $ ELECTRIC uOTOR susiNEss azOuP SMALL AC MOTOR DEPARTMENT OENERAL ELECTRIC COMPANY,2155 south PIRST STREET, P.O. BOX 6376 SAN JOSE MOTOR PLANT M/C ggQ SAN JOSE, CAllFoRNIA 95150, Phone (408) 925-18A5 4s Arrnct4rac r T January 18, 1985 Binghan Willamette Co.

2000 N.W. Front Ave.

Portland, Oregon 97210 Customer Requisition:

471-54385.

- 471-51900 47.1-51900 Model Number:

SK6348XC127A & B 5K6338XC138A SK6256XJ4015A Job Number:

gwc P.O.1-58765 P.O. 1 -39781 P.O.

1 -39781 1981

,1981 1981 13edJd/

f gm,n &iu-/B&M n,w 8tNG Id!"

~

Gentlemen:

/ A D SR Ota' 7 YR'/hr There is a possibility that the snace hea ters that we supplied on. your order will not be satis f actory.

We have purchased this component. from two vendors and recently had some field failures with those manufactured by Wellman Company.

In discussing.this with Wellman, we found that they had changed the end plug where the leads exit frcm ceramic to epoxy.

Eventually the epoxy carbonizes and the lead wires short out.

We suggest that you check the heaters in 'your.notors listed above..If you find you have Wellman heaters, advise us the model and serial numbers of the motor and we will supply replacement heaters free of charge.

Please reply by 2/28/84 latest.

Very truly yours,

)l

[-Of/M M

M

. T d l'Al h / 6 H e t.

Ken Kool 50 li'l O'4 M 4' Product Service Engineer gg[gpg4

/mf Q,y /

} /,/

Q}/,Qusurr^

naceweo l zi @

JM 221985 I

Bingham-Willamette Company ATTACHMENT II Giorgia Power Company Nuclear Service Cooling Water & Transfer Pumps BWC SALES ORDER #

MODEL/ SIZE OF PUMPS CUST. EQUIP. ITEM NUMBERS 1A052 18x27 BVCM, 2 stage 1-1202-P4-001 1A053

-002 1A054

-003

-004 1A055

-C05 1A056

-006 1A057 2-1202-P4-001 1A058 1A059 2-1202-P4-002 1A060

-003

-004 1A061

-005 1A062 1A063

-006 1A064 8x12A VCM, 2 stage 1-1202-P4-007 1-1202-P4-008 1A065 1A066 2-1202-P4-007 2-1202-P4-008 1A067 GPCo P,0.'s PAV-625, PAV2-67

..)