ML20114B628
| ML20114B628 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 08/20/1992 |
| From: | Mcmeekin T DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20114B630 | List: |
| References | |
| NUDOCS 9208310007 | |
| Download: ML20114B628 (3) | |
Text
. _ _ _ _ _ _.
11 l
Duke l'reer Company.
.T C A1:xunt AlcGwre hdear Ger.eraticn Department i\\ce President I ?00 flwrs l'erry Read (kfG01A)
. (704>873-4800.
Huntersch, NClF0Th 8993 (704) sis 4M9 fn DUKE POWER August 20, 1992 U.S.
Nuclear Regulatory Commission Washington, DC 20555 Attention:
Document Control Desk J
Subject:
McGuire Nuclear Station, Units 1 and 2 Dochet-Nos. 50--369 and 370 Proposed-Technical Specification Change Gentlemen:
Pursuant to 10 CFR 50.4 a n d ' 5 0'. 9 0, attached is a proposed license amendment to Appendix A,_ Technical Specifications, _of Facility Operating Licenses, NPF-9 AND NPF-17 for McGuire Nuclear Station Units 1 and 2, respectively.
The-propoced change would eliminate the "during shutdown" restriction for the 60 month 125 volt battery surveillance 4.8.2.1.2.e.
Attachment 1 contains the proposed Technical Specification change. contains the justification for -the proposed change, and the analysis performed in.accordance with the standards contained in 10.CFR-50.92,-which concludes that the amendment does not involve a
significant Hazards Consideration.
Duke Powa r is forwarding a copy of this amendment request -application and No Significant Hazards Consideration analysis to the appropriate North Carolina st. ate officials.
The proposed _ amendment has been reviewed and has been -determined to have no adverse safety o~? environmental impact.
Should there be any questions concerning this proposed amendment or if additional information is required, please call L.
J.
Kunka at-(704) 875-4000,. Ext. 4032.
Vecy truly yours, tfhf l T. C.
McMeekin, Vice President McGuire Nuclear Site 4208310007 920020 PDR ADOCK 05000369 i
P PDR (i1 I
ne.nnnw
\\
l
l[
f I
Document-Control Desk Page Two i
August 20,-1992 Attachments:
i s
1.
Proposed Technical Specification Changes l
2.
Justification and Analysis of Significant Hazards j
Consideration.
i xc:
(W/ Attachments)
Mr.
S. D.
Ebneter, Regional Administrator l
U.S.
Nuclear Regulatory Commist;.n, Region If i
Mr. Dayne Brown, Chief i
Radiation Protection Branch
{
Division of Facility Services Department of Human Services, State of NC l
j Mr.
T.
A.' Reed, Project Manager j
Office of Nuclear Reactor Regulation l_
U.S.
Nuclear Regulatory Commission.
Mr.
P.K. VanDoorn NRC Resident Inspector McGuire Nuclear Station American Nuclear Insurers e
r l
M& M Nuclear Consultants l
INPO Records Center i
i 4
E i
i t
1 1
i i
t.
i1
Document Control Desk j
Page 3 August 20, 1992 i
T.C.
McMeekin,- being duly sworn,. states that he is-Vice President of Duke Power Company;.that he is authorized on the i
part of said Company to sign and file with the Nuclear Regulatory Commission this revision to the McGuire Nuclear' i
Station License Nos. NPF-9 and NPF-17 and that all statements and matters set forth therein are true and correct to the best of his knowledge.
l i
i 1
O j
T.C.
McMeekin, Vice President i
i c
i l1-l Subscribed and sworn to before me this 20th day of August, 1992.
e i-l i
i hw
. hJf)z1 AJ i
No ery ubli My Commission expires:
NAMhA> lb l
)
'