Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-19935, Informs That,In Light of Pending Issuance of Followup Insp Rept & in Consultation W/J Milhoan,Addl Info Re Integrated Design Insp Rept 50-458/84-18 & Followup Activities Will Be Provided by 850215 + (ML20114A701)
- ML20114A702 + (ML20114A702)
- ML20114A708 + (ML20114A708)
- ML20114A711 + (ML20114A711)
- ML20114A713 + (ML20114A713)
- ML20114A714 + (ML20114A714)
- ML20114A717 + (ML20114A717)
- B14209, Application for Amend to License DPR-65,revising Lco,Action Statement & Surveillance Requirements in TS 3.2.3 & 4.2.3.2 Re Total Unrodded Radial Peaking Factor & LCO in TS 3.3.3.2 Re in-core Detectors,Per Cycle 12 Reload Operation + (ML20114A719)
- 2CAN089208, Monthly Operating Rept for Jul 1992 for ANO Unit 2 + (ML20114A722)
- ML20114A723 + (ML20114A723)
- ML20114A725 + (ML20114A725)
- ML20114A726 + (ML20114A726)
- ML20114A730 + (ML20114A730)
- ML20114A732 + (ML20114A732)
- ML20114A734 + (ML20114A734)
- ML20114A735 + (ML20114A735)
- ML20114A745 + (ML20114A745)
- ML20114A747 + (ML20114A747)
- ML20114A750 + (ML20114A750)
- ML20114A757 + (ML20114A757)
- ML20114A760 + (ML20114A760)
- ML20114A761 + (ML20114A761)
- 3F0185-09, Forwards Tech Spec Change Request 116 Re Amend to License DPR-72,modifying ESF Circuitry to Allow Testing of All Test Groups During Power Operation.Certificate of Svc Encl + (ML20114A763)
- 05000277/LER-1992-012-01, :on 920717,reactor Scram Occurred When Main Generator Output Breaker Tripped Open & Caused Main Generator Power Load Unbalance Trip Signal.Caused by Severe Thunderstorm.Scram & Isolations Reset + (ML20114A764)
- ML20114A769 + (ML20114A769)
- ML20114A770 + (ML20114A770)
- ML20114A774 + (ML20114A774)
- ML20114A776 + (ML20114A776)
- ML20114A781 + (ML20114A781)
- ML20114A791 + (ML20114A791)
- ML20114A795 + (ML20114A795)
- ML20114A796 + (ML20114A796)
- 05000277/LER-1992-011-01, :on 920625,review of NRC Bulletin 92-001 Re Failure of Thermo-Lag 330 Fire Barrier Sys Completed & Fire Barriers Delineated in Bulletin Declared Inoperable.Caused by Design Deficiencies.Fire Watch Established + (ML20114A798)
- ML20114A799 + (ML20114A799)
- ML20114A800 + (ML20114A800)
- ML20114A802 + (ML20114A802)
- ML20114A803 + (ML20114A803)
- 05000423/LER-1992-017, :on 920717,determined That One Train of Pressurizer Steam Space Vent Path Was Inoperable & Action Statement Not Performed.Caused by Personnel Error.Changes to TS Will Be Submitted to Clarify Actions + (ML20114A807)
- ML20114A809 + (ML20114A809)
- TXX-4392, Forwards Summary Description of balance-of-plant Mechanical Equipment Qualification Program.No Corrective Action Necessary as Result of Environ Qualification Study for safety-related Equipment in Potentially Harsh Environs + (ML20114A824)
- 1CAN128405, Requests Waiver on Completion of Annual Simulator Requalification Training of Licensed Operators for 1984-85 Requalification Training Yr.Onsite Simulator Will Be Operational During Third Quarter 1985 + (ML20114A825)
- ML20114A826 + (ML20114A826)
- ML20114A829 + (ML20114A829)
- ML20114A832 + (ML20114A832)
- ML20114A840 + (ML20114A840)
- ML20114A841 + (ML20114A841)
- ML20114A842 + (ML20114A842)
- ML20114A847 + (ML20114A847)
- ML20114A851 + (ML20114A851)
- ML20114A861 + (ML20114A861)
- ML20114A869 + (ML20114A869)