Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- W3P85-0130, Forwards Rept on License Condition 16 Evaluating Potential Adverse Effects of Failure of Containment Coatings on post-accident Fluid Sys + (ML20113C322)
- ML20113C323 + (ML20113C323)
- ML20113C327 + (ML20113C327)
- ML20113C343 + (ML20113C343)
- ML20113C357 + (ML20113C357)
- ML20113C366 + (ML20113C366)
- ML20113C368 + (ML20113C368)
- ML20113C370 + (ML20113C370)
- 05000454/LER-1996-008-01, :on 960528,fuel Assemblies Located in Incorrect Region of Spent Fuel Pool Identified.Caused by Cognitive Personnel Error.Performance Expectations Discussed W/Persons Involved + (ML20113C384)
- NSD-NRC-96-4755, Forwards non-proprietary & Proprietary Evaluation of Low Flow DNB Data of Modified V5H/IFM Fuel for AP600.Proprietary Encl Withheld,Per 10CFR2.790 + (ML20113C385)
- ML20113C388 + (ML20113C388)
- ML20113C389 + (ML20113C389)
- 3F0696-14, Forwards Results of Ampacity Derating Tests of Thermo-Lag & Mecatiss Fire Barriers Performed for Util by Ul.Review & Acceptance of Ul Ampacity Derating Tests Contained in Encl a & Derating & Correction Factors Requested.Encl Withheld + (ML20113C393)
- 05000454/LER-1985-028, :on 850304,reactor Tripped Due to Manual Turbine Trip.Caused by Abnormally Fluctuating Generator Output.Training Dept Will Emphasize That Turbine Power May Vary from Generator MW Output + (ML20113C400)
- ML20113C405 + (ML20113C405)
- NPL-96-0208, Forward UFSAR for Point Beach Nuclear Plant,Units 1 & 2 + (ML20113C414)
- ML20113C423 + (ML20113C423)
- NRC-96-0083, Provides Comments on Proposed RG 5.44,Rev 3 + (ML20113C429)
- ML20113C433 + (ML20113C433)
- ML20113C438 + (ML20113C438)
- ML20113C440 + (ML20113C440)
- ML20113C443 + (ML20113C443)
- 3F0185-03, Notifies of Rev to 830506 Commitment Re Hydrogen Recombiner Requirement.Further Study Revealed That Capability to Install External Hydrogen Recombiner Will Not Be Safety Grade.Capability Will Be Designed Per Seismic I Criteria + (ML20113C444)
- ML20113C445 + (ML20113C445)
- ML20113C448 + (ML20113C448)
- ML20113C454 + (ML20113C454)
- 05000278/LER-1996-001-03, :on 960529,HPCI Turbine Control Valve Failed to Open as Expected During Performance of Routine Test O-023A-450-3.Caused by Failed Solder Connection on HPCI Flow.Solder Connection Repaired + (ML20113C458)
- 05000265/LER-1996-001, Forwards LER 96-001-00.Listed Commitments Made,Including Event Will Be Included as Part of Continuing Training for Both Licensed Operators & Engineering Dept + (ML20113C463)
- 05000265/LER-1996-001-10, :on 960417,HPCIS Was Declared Inoperable Due to Procedural Deficiency Which Allowed Isolation of Turbine Exhaust Vacuum.Licensed Operators Have Been Trained on Procedure Changes + (ML20113C470)
- ML20113C473 + (ML20113C473)
- ML20113C481 + (ML20113C481)
- ML20113C485 + (ML20113C485)
- ML20113C488 + (ML20113C488)
- ML20113C494 + (ML20113C494)
- ML20113C499 + (ML20113C499)
- ML20113C508 + (ML20113C508)
- ML20113C514 + (ML20113C514)
- ML20113C519 + (ML20113C519)
- B11491, Amend to Final Significant Design & Const Deficiency Rept SD-70 Re Nonmotor Operated curtain-type Fire Dampers. Initially Reported on 850116.Testing & Evaluation Will Be Extended to QA Category II & III Fire Dampers + (ML20113C524)
- ML20113C527 + (ML20113C527)
- ML20113C531 + (ML20113C531)
- ML20113C550 + (ML20113C550)
- NSD-NRC-96-4757, Forwards Completed Review of AP600 Confirmatory Benchmark Problems for Piping Analysis Documented in Draft NUREG/CR-6414 + (ML20113C552)
- B15696, Updates & Revises Info Provided by Util in Response to GL 89-13 on Behalf of Millstone Unit 2 + (ML20113C574)
- ML20113C576 + (ML20113C576)
- B15761, Requests Senior Operator License for MP Mullin Be Modified to Include Recommendation Identified During Recent Medical Exam + (ML20113C577)
- 05000254/LER-1996-008, Forwards LER 96-008,Rev 00 & Makes Following Commitment: Procedure Qcts 0600-34 Will Be Revised to Ensure Appropriate Vent Path Exists When Leak Rate Testing 2251(2)-81A/B Panels + (ML20113C579)
- RBG-20549, Interim Deficiency Rept DR-275 Re Welded Studs for Variable Inlet Vane Assembly on Four Fans Supplied by Buffalo Forge Co for Standby Gas Treatment Sys & Fuel Bldg Charcoal Filtration Units.Next Rept Will Be Provided by 850412 + (ML20113C583)
- ML20113C584 + (ML20113C584)
- 05000278/LER-1985-007-01, :on 850301,during Startup from Maint Outage at 30% Power,Reactor Scrammed from Main Condenser Low Vacuum. Caused by Leak on Feedwater Heater A2 Shell Side Relief valve.Leak-off Plug Installed + (ML20113C585)
- ST-HL-AE-5411, Application for Amends to Licenses NPF-76 & NPF-80,allowing Extension of Sdg Allowed Outage Time to 14 Days & Extension of Essential Cooling Water Loop & Essential Chilled Water Loop to 7 Days + (ML20113C589)