ML20113C485
| ML20113C485 | |
| Person / Time | |
|---|---|
| Site: | McGuire |
| Issue date: | 06/24/1996 |
| From: | Canady K DUKE POWER CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20113C486 | List: |
| References | |
| NUDOCS 9607010265 | |
| Download: ML20113C485 (1) | |
Text
-.-.-
-. - ~ -. _.. - -
- ~.
ll l
Dube her Company PO Bax 1006 Charlotte, NC282011006 June 24,1996 DUKEPOWER J
U. S. Nuclear Regulatory Commission i
ATTN:' Document Control Desk Washington, D. C. 20555
Subject:
McGuim Nuclear Station, Unit 1 Docket Number 50-369 Core Operating Limits Repon for Cycle 11 Please find attached, pursuant to McGuim Technical Specification 6.9.1.9, a revision to the Core Operating Limits Report for McGuire Unit 1 Cycle 11. The purpose of this revision is to update the minimum contained borated water level indication for LCO 3.1.2.5a and 3.1.2.6a, to remove the ponion of the note included on the control rod insenion limits curve (3/4.1.3.6) penaining to turbine limited penalties, and to redefine F$"' to include bumup effects (3/4.2.2).
If there are any questions, please call Richani Clark at (704) 382-5823.
Very truly yours.
K. S. Canady, Manag r NuclearEngineering Nuclear Generation Depanment cc: Mr. V. Nerses, Project Manager bxc:
S. A.Gewehr Office of Nuclear Reactor Regulation G. A. Copp 111 U. S. Nuclear Regulatory Commission R.H. Clark MailStop 14H25 OWFN M.T. Cash (MNS)
. Washington, D. C. 20555 J. E. Snyder (MNS)
File: E-NRC-COLR Revision Mr. S. D. Ebneter, Regional Administrator U. S. Nuclear Regulatory Commission - Region 11 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 Mr. G. F. Maxwell Senior Resident inspector McGuire Nuclear Station 9607010265 960654
!l
~
PDR ADOCK 05000369 9
PDR nn w amue,,