NPDES Noncompliance Notification:On 960318,flow Integrator Used to Measure Spray Pond Effluent Flow Declared Inoperable.Caused by Faulty Flow Integrator.Frequency of Use of Instrument Changed to Daily as Stated in Issue Number
ML20113C445
Person / Time
Site: Limerick  
Issue date: 06/24/1996
From: Boyce R
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To: Oneil S
PENNSYLVANIA, COMMONWEALTH OF
References
NUDOCS 9607010239
Download: ML20113C445 (2)


Text

. _

Robert W. Boysa Plant Manager v

Limenck Generating Staton v

PECO NUCLEAR ee:O cn-am-ev Limenck Generating Station A Unit of PECO Energy PO Box 2300 Sanatoga. PA 19464-0920 610 718 2000 June 24, 1996 Steven J.

O'Neil Chief, Operations Section Department of Environmental Resources Bureau of Water Quality Management Suite 6010, Lee Park 555 North Lane Conshohocken, PA 19428

SUBJECT:

Limerick Generating Station, Unit 1 and 2 Noncompliance of NPDES Permit No. PA-0051926

Dear Mr. O'Neil:

Descriotion of the Non-Comoliance:

The flow integrator used to measure Spray Pond effluent flow was declared inoperable on March 18, 1996 and returned to service after repairs on June 6, 1996.

This instrument, required by Part A of the permit, is used to measure the contribution of Spray Pond flow to the total integrated flow at Outfall 001.

There are no contingencies within the permit for an alternate means to measure flow when any of the four separate flow meters that contribute to the total outfall 001 discharge are inoperable.

Daily observations were taken to estimate the flow from thn Spray Pond.

The estimated gallons is included in the daily total discharge for outfall 001.

Cause of the Non-Comoliance:

The cause of the non-compliance is due to a faulty flow integrator.

The discharge from the Spray Pond is intermittent, therefore the failure of this instrument was not readily evident.

1lO 96070102399606b4 '

f/hh

/

PDR ADOCK 05000352 8

PDR I

)

l l,

June 24, 1996 1

l Page Two Action to Prevent Recurrence:

The frequency of use of this instrument has changed to daily as stated in issue number five of our noncompliance letter dated April 28, 1996.

The daily recording of flow will allow the System Manager to assess the operability of i is t

instrument on a weekly basis.

If there are any questions please do not hesitate t.; contact Mr. James L. Kantner at (610) 718-3400.

l Sincerely, DMS/cah cc:

U.S. Nuclear Regulatory Commission l

Document Control Desk Docket Nos. 50-352/352 Washington, D.C.

20555 T. T. Martin Administrator, Region I, USNRC Docket Nos.

50-352-353 N.

S.

Perry USNRC Senior Resident Inspector, LGS Docket Nos. 50-352/353 Program Management Section (3WM52)

Permits Enforcement Branch Environmental Protection Agency Water Management Division Environmental Protection Agency Water Permits Section Region III 841 Chestnut Building Philadelphia, PA 19107

~~

- -