Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ST-HL-AE-5404, Forwards Core Operating Limits Rept for South Tx Project Unit 1,Cycle 7 + (ML20112J332)
- ML20112J335 + (ML20112J335)
- ML20112J336 + (ML20112J336)
- ML20112J344 + (ML20112J344)
- ML20112J345 + (ML20112J345)
- ML20112J349 + (ML20112J349)
- ML20112J350 + (ML20112J350)
- ML20112J351 + (ML20112J351)
- ML20112J361 + (ML20112J361)
- ML20112J373 + (ML20112J373)
- ML20112J374 + (ML20112J374)
- RBG-20462, Final Deficiency Rept DR-215 Re Uninterruptible Power Supplies Provided by Elgar Corp.Initially Reported on 850214.Broken Pc Board Replaced & Wires Relugged + (ML20112J377)
- 05000278/LER-1985-006-01, :on 850220,RCIC Inboard Steam Isolation Valve Mo 3-13-15 Found Fitted W/Incorrect Limitorque Operator.No Addl Unsatisfactory Operators Found.Valve Fitted W/Correct Operator + (ML20112J381)
- ML20112J383 + (ML20112J383)
- ML20112J387 + (ML20112J387)
- ML20112J392 + (ML20112J392)
- ML20112J395 + (ML20112J395)
- 05000325/LER-1996-002-01, :on 960123,main Turbine Bearings Experienced Increasing Vibration.Caused by Diaphragm Packing Rubbing on Monoblock Turbine Rotors.Addl Monitoring Equipment Installed to Monitor Main Turbine Performance + (ML20112J403)
- ML20112J404 + (ML20112J404)
- ML20112J410 + (ML20112J410)
- ML20112J414 + (ML20112J414)
- ML20112J424 + (ML20112J424)
- ML20112J431 + (ML20112J431)
- ML20112J436 + (ML20112J436)
- ML20112J439 + (ML20112J439)
- ML20112J444 + (ML20112J444)
- ST-HL-AE-1208, Interim Deficiency Rept Re Postulated Failure of Reactor Coolant Pump Thermal Barrier HX & Component Cooling Water Return Isolation Valve.Initially Reported on 850220. Conceptual Solution Under Development.Next Rept by 850523 + (ML20112J446)
- ML20112J453 + (ML20112J453)
- JAFP-96-0240, Monthly Operating Rept for May 1996 for Ja FitzPatrick Nuclear Power Plant + (ML20112J470)
- ML20112J474 + (ML20112J474)
- ML20112J477 + (ML20112J477)
- ML20112J479 + (ML20112J479)
- ML20112J489 + (ML20112J489)
- 05000483/LER-1985-012, :on 850222,turbine Trip Occurred Due to hi-hi Level Signal on Steam Generator D.Caused by Steam Flow/ Feedwater Flow Recorder AE-FR-544 Not Operating Properly. Recorder Will Be Repaired + (ML20112J499)
- ML20112J500 + (ML20112J500)
- ML20112J501 + (ML20112J501)
- 05000361/LER-1985-006-01, :on 850113,toxic Gas Isolation Sys Train a Actuated.Caused by Hydrocarbon Analyzer Flameout,Which Caused Instrument Failure Actuation Signal.Dirty Filters Replaced & Train a Tested & Restored + (ML20112J503)
- ML20112J505 + (ML20112J505)
- ML20112J507 + (ML20112J507)
- IR 05000305/2002006 + (ML20112J513)
- ML20112J516 + (ML20112J516)
- ML20112J522 + (ML20112J522)
- ML20112J528 + (ML20112J528)
- ML20112J541 + (ML20112J541)
- AECM-85-0069, Endorses Hydrogen Control Owners Group Hydrogen Control Program Plan Transmitted in 841214,850214,19 & 28 Ltrs. Requests That NRC Continue to Review & Support Program for Final Resolution of Hydrogen Control Issue + (ML20112J548)
- AECM-85-0088, Submits Info Re Elevated Groundwater Level Recorded on 850228 for Dewatering Well 8.Elevation Caused by Equipment Failure & Above Average Precipitation.Tables Listing Precipitation Measurements & Groundwater Elevations Encl + (ML20112J555)
- ML20112J556 + (ML20112J556)
- BECO-85-063, Submits Addl Info Re Status of Containment Purging & Venting,In Response to NRC 840203 & 0411 Requests.Reduction in Risk Purported in NUREG-0737,Item II.E.4.2(7) Not Clearly Demonstrated + (ML20112J558)
- ML20112J561 + (ML20112J561)
- ST-HL-AE-1220, Forwards Response to FSAR Questions 032.42,032.44 & 032.45 to Support Resolution of Questions from Instrumentation & Controls Sys Branch 850326 Review Meeting.Info Will Be Included in FSAR Amend 46 + (ML20112J564)
- ML20112J566 + (ML20112J566)