ML20112J335

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Dec 1984
ML20112J335
Person / Time
Site: Palisades Entergy icon.png
Issue date: 12/31/1984
From: Dienes A, Vandenberg D
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF ADMINISTRATION (ADM)
References
NUDOCS 8501180246
Download: ML20112J335 (4)


Text

..

. ~.

I -

t, OPERATING DATA REPORT b

DOCKET NO 50-255 DATE 01-07-85 4-COMPLETED BY AFDienes TELEPHONE (616)764-8913 OPERATING STATUS NOTES

'1.

Unit Name: Palisades

'2.,

Reporting Period:

841201-841231 3.

Licensed Thermal Power (MWt):

2530 4.

Nameplate Rating (Gross MWe):

811.7

5..

Design Electrical Rating (Net.MWe):

805 6.

Maximum Dependable Capacity (Gross MWe): *675 7.

Maximum Dependable Capacity (Net MWe):

  • 635-

'8.

If Changes Occur in Capacity Ratings ~(Items Number 3 through 7) since last report, j

give reasons:

9.

Power Level to Which_ Restricted, if any (Net MWe):

10.

Reasons for Restrictions, if any:

This Month Yr-to-Date Cumulative 11.

Hours In Reporting Period 744 8,784 114,279

12.. Number of Hours Reactor Was Critical 744 1.550.5-60,809.7
13. -Reactor Reserve Shutdown Hours
14.. Hours Generator On-Line 744 1,336.3 57,614.3
15. Unit Reserve Shutdown Hours 16 Gross Thermal Energy Generated (MWH) 1,838,256 2,722,728 118,082,952

.17.

Gross Electrical Energy Generated (MWH) 592,650 867,350

.36,617,790

18. Net Electrical Energy Generated (MWH) 562,662 811.549 34,439,563 l
19. Unit Service Factor 100 15.2 50.4
20. Unit Availability Factor 100 15.2 50.4 21.'

Unit Capacity Factor (Uning MDC Net) 119.1 14.6 47.5

22. Unit Capacity Factor (Using DER Net) 94.0 11.5 37.4
23. Unit Forced Outage Rate 0

64.0 33.5 24.. Shutdowns Scheduled Over Next Six Months (Type, Date.and Duration of Each):

l 25..

If Shut Down at End of Report Period, Estimated Date of Start Up:

26..

Units in Test. Status (Prior to Commercial Operation):

Forecast Achieved

?:

INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION-

  • Based on condenser backpressure-

-0C0185-0001B-OP02 hh55 0

~

? +.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO 50-255 UNIT Palisades DATE 01-07-85 COMPLETED BY AFDienes TELEPHONE (616)764-8913 MONTH December 1984 DAY AVERAGE DAILY POWER LEVEL

. DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 759 17 760 2

755 18 758 3

758-19 751 4-755 20 755 5

757 21 749 6

753 22 762 7

752 23 760 8

757 24 764-9 746 25 765 10 757 26 764 11 754 27 760 12 752 28 748 13 757 29 752 14-758 30 765 15 754 31 758 16 749 INSTRUCTIONS:

On this format, list the average daily unit power level in MWe-Net for.each

. day in the reporting month. Compute to the nearest whole megawatt.

OC0185-0001C-0P02

c;:

/

V,,,.; '

~

h l

l

SUMMARY

OF OPERATING EXPERIENCE FOR DECEMBER 1984

~

-The Plant operated at approximately 98 percent of rated power the entire month of December.

i t

-[

3 OC0185-0001E-OP02 w-

=

~

J. _. ~... g.

e' S

Consumem Power CompanyL l

Palisades Nuclear Planti 27780 Blue Star Memorial Highway. Covert. MI 49043 January 7, 1985 US Nuclear Regulatory Commission Mail and Records Section Washington, DC 20555

. LICENSE REPORT OF MONTHLY OPERATING DATA DPR-20, DOCKET NO 50-255 Enclosed is a copy of the Monthly Operating Data and a Summary of Operating Experience for the Palisades Nuclear Plant for the month of December 1984.

)

]

Dewey VanDenBerg 4

{

Reactor Engineer CC: KMHass, Palisades 1~

GHGoralski, Palisades JGKeppler, USNRC JRSchepers, Palisades DJVandeWalle, P24-614B DWRogers, Palisades Resident Inspector, Palisades DLHackett, P11-228B LABrown, P21-317 GWBruckmann, Div of Radiological Health Services, Lansing, Michigan SMierzwa,. Michigan Dept of Labor RCallen, Michigan Public Service Commission KMFarr, Palisades Records Center, INPO, Atlanta, GA RWraylor, CE, Palisades JBToskey, P25-101 EWRaciborski, P26-204 4

DRGanser, P26-205 Document Control, 950*22*35*10/L GHG85*001.

g OC0185-0001A-OP02

-