Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000382/LER-1996-006-01, :on 960517,reactor Trip Occurred.Caused by Failed Component & Original Design Inadequacies.Replaced Both Motor/Generator (M/G) Set Overvoltage Relays & Replaced a M/G Set Voltage Regulator + (ML20112J102)
- ML20112J103 + (ML20112J103)
- ML20112J111 + (ML20112J111)
- ML20112J115 + (ML20112J115)
- ML20112J127 + (ML20112J127)
- ML20112J129 + (ML20112J129)
- ML20112J144 + (ML20112J144)
- ML20112J145 + (ML20112J145)
- ML20112J154 + (ML20112J154)
- ML20112J156 + (ML20112J156)
- ST-HL-AE-1194, Discusses 850116 Meeting W/Nrc Re Fire Protection Program & Fire Hazards Analysis.Detailed Summary Encl.Nrc Recommendations Re Possible Rev to Fire Hazards Analysis Rept Under Consideration + (ML20112J160)
- ML20112J163 + (ML20112J163)
- ML20112J164 + (ML20112J164)
- ML20112J172 + (ML20112J172)
- W3P85-0736, NPDES Noncompliance Notification:On 850313,oil & Grease Concentration at Outfall 003 Was 27 mg/1,exceeding Permit Limitation of 20 mg/1.Caused by Buildup of Matls in Discharge from Oil/Water Separator + (ML20112J174)
- ML20112J176 + (ML20112J176)
- ML20112J178 + (ML20112J178)
- ML20112J184 + (ML20112J184)
- ML20112J188 + (ML20112J188)
- ML20112J192 + (ML20112J192)
- ST-HL-AE-1174, Forwards Effective Page Listing Through Amend 43 for Facility Fsar.Listing Should Be Considered Addition to Fsar. Listing Will Be Updated Periodically + (ML20112J193)
- ML20112J196 + (ML20112J196)
- ML20112J197 + (ML20112J197)
- ML20112J200 + (ML20112J200)
- ML20112J208 + (ML20112J208)
- ML20112J214 + (ML20112J214)
- ML20112J226 + (ML20112J226)
- ML20112J239 + (ML20112J239)
- RBG-20480, Interim Deficiency Rept DR-175 Re HPCS Diesel Batteries Supplied by Ge.Interim or Final Rept Will Be Provided by 850403 + (ML20112J246)
- ML20112J250 + (ML20112J250)
- ML20112J259 + (ML20112J259)
- ML20112J264 + (ML20112J264)
- ML20112J281 + (ML20112J281)
- RBG-20479, Interim Deficiency Rept DR-267 Re Optical Isolators Supplied by Ge.Interim or Final Rept Will Be Provided by 850408 + (ML20112J282)
- ML20112J284 + (ML20112J284)
- 05000483/LER-1985-011, :on 850222,reactor Manually Tripped & Emergency Diesel Generator B Started & Loaded When Startup Transformer Lost.Caused by Interlock Between Transformer & Deluge Sys Due to Water Leakage & Power Loss to Rods + (ML20112J285)
- B11495, Application for Amend to License DPR-65,authorizing Rev to Tech Spec 3.7.5.1 Re Flood Level.Fee Paid + (ML20112J288)
- ML20112J293 + (ML20112J293)
- ML20112J295 + (ML20112J295)
- RBG-20481, Interim Deficiency Rept DR-279 Re Preventative Maint for safety-related Equipment.Interim or Final Rept Will Be Provided by 850410 + (ML20112J297)
- ML20112J298 + (ML20112J298)
- 05000483/LER-1985-007-01, :on 850201,six Limitorque Valves Declared Inoperable.Caused by Terminal Blocks Not Complying W/Generic Ltr 84-24 & IE Info Notice 83-72.Terminal Blocks Replaced & Valves Environmentally Qualified + (ML20112J301)
- RBG-20482, Interim Deficiency Rept DR-268 Re Rosemount Trip Units Supplied by Ge.Interim or Final Rept Will Be Provided by 850409 + (ML20112J303)
- ML20112J304 + (ML20112J304)
- 05000259/LER-1985-004-03, :on 850223,generator End of LPCI Motor Generator 1EA Found Overheated.Caused by Diode Failure Due to Vibration of Rectifier Ring.Phenolic Coil Clamps Replaced & Rectifier Rings Tightened + (ML20112J312)
- ML20112J315 + (ML20112J315)
- 05000454/LER-1985-023-01, :on 850227,automatic Safety Injection Actuation Occurred.Caused by Improper Calibr of Digital electro- Hydraulic Controllers & Valve Interlocks.Valve Positions Recalibr + (ML20112J316)
- RBG-20-570, Suppls 850122 Rev to FSAR Section 3.8.2.7 Re Initial Structural Acceptance Test of Containment Vessel.Rev Will Be Included in Future FSAR Amend + (ML20112J318)
- RBG-20595, Forwards Response to Request for Addl Info Re Optical Isolator & Mdr Auxiliary Relay Tests.Submittal Provides Final Response to SER Confirmatory Item 26 + (ML20112J320)
- ML20112J327 + (ML20112J327)
- RBG-20483, Interim Deficiency Rept DR-285 Re Instrument Setpoint Methodology for Rosemount 1152 Devices Supplied by Ge. Interim or Final Rept Will Be Provided by 850410 + (ML20112J331)