Monthly Operating Rept for May 1996 for Catawba Nuclear Station Units 1 & 2
ML20112J264
Person / Time
Site: Catawba  Duke Energy icon.png
Issue date: 05/31/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20112J199 List:
References
NUDOCS 9606200064
Download: ML20112J264 (10)


Text

..

4 I

OPERATING DATA REPORT DOCKET NO 50-413 DATE June 14. 1996

~ OPERATING STATUS COMPLETED BY R.A. Willians TELEPHONE 704-382-5346

1. Unit Name Catawba 1
2. Reporting Period: May 1, 1996-May 31, 1996
3. Licensed Thersal Power ( Mti:

3411

4. Naseplate Rating (6ross Wel:

1305i Notes eNaseplate Rating

5. Design Electrical Rating (Net Mel:

!!45 (6tess MWe) calculated as 6, Maxieus Dependable Capacity (6 toss pel:

1192 1450.000 MVA :.90 power

7. Maximus Dependable Capacity (Net NWe):

!!29 factor per Page 111,

8. If Changes Occur in Capacity Ratings (itees Number 3 Through 71 Since Last NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, If Any (Net Me):
10. Reason For Restrictions, if any:

This Month Yr.-to-late Cueulative

11. Hours In Reporting Period 744.0 3647.0 95760.0
12. Number Of Hours Reactor Was Critical 691.8 3523.9 75817.6
13. Reactor Reserve Shutdown Hours

--0-- -0--

10. Hours Generator On-Line 675.6 3487.5 74576.2
15. Unit Reserve Shutdown Hours

--0-- -

--0--

-14. Gross Thersal Energy 6ererated (W H1 2271873 11409042 243359301

17. Gross Electrical Energy Generated (MWH1 809103 4089239 85992050
18. Net Electrical Energy Generated ( MH) 764206 3868652 80913741
19. Unit Service factor 90.8 95.6 77.9
20. Unit Availability Factor 90.8 95.6 77.9
21. Unit Capacity Factor (Using MDC Net) 91.0 94.0 74.6
22. Unit Capacity Factor (Using DER Neti 89.7 92.6 73.8
23. Unit Forced Outage Rate 9.2 4.4' 8.0
20. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling - June 13, 1996 - 46 days and Steam Generator Replacement - 53 days

. 25. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units In Test Status (Prior to Coseercial Operationi:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMERCIAL OPERATION 9606200064 960614 PDR ADOCK 05000413 R

PDR

OPERATING DATA REP 0kT DOCKET NO 50-413 WIT Catamba 1 DATE June 14. 1996 CONPLETED BY R.A. Willines TELEPHONE 704-382-5346 00kTH Nay. 1996 RE AVERA6E DA!LY POWER LEVEL DE AVERA6E DAILY POWER LEVEL (Me-Net )

(Nue-Net) 1 1162 17 1144 2

1159 1B 1143 3

1155 19 1142 4

115!

20 1141 5

1149 21 1143 6

1148 22 1145 7

1152 23

!!49 8

256 24 1142 9

0 25 -

!!46 10 0

26 1148 655 27 1143 12 1153 28 1146 13 1157 29 1145

- 14 1157 30 1152 15 1156 31 1157 16 1148

i UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-413 UNIT NAME carawna 1 i

DATE ve/le/ud REPORT MONTH May 1996 COMPLETED BY x.

A.

williams TELEPHONE

( v us ) - J es z -- d.s e d (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 2

96 8 F

68.42 A

1 RB CRDRVE MISALIGNMENT OF 2 CONTROL RODS IN CONTROL BANK

'A' DURING CONTROL ROD MOVEMENT PERFORMANCE TESTING i

(1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram (LER Event Report ( M EG-0161))

D-Regulato n Restriction 4-Other (Explain)

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

DOCKET: 50-413 UNIT: Catawba 1 Date: 06/14/96 NARRATIVE

SUMMARY

MONTH: May,1996 Catawba Unit I began the month of May operating at 100% full power. The unit operated at or near 100%

full power until 05/08/96 at 0421, when the unit began reducing power and was removed from service on 05/08/96 at 0726 due to misalignment of 2 control rods in control bank 'A' during control rod performance testing. The unit was placed on-line 05/11/96 at 0351. The unit returned to 100% power on 05/11/96 at 2010 and operated at or near 100% power the remainder of the month.

Prepared by: R. A. Williams Telephone: (704)- 382-5346

MONTHLY REFUELING INFORMATION REOUEST 1.

Facility name:

Catawba. Unit 1 2.

Scheduled next refueling shutdown: June 1996 3.

Scheduled restart following refueling: September 1996 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuel pool: 16_Q 8.

Present licensed fuel pool capacity: 14J1 Size of requested or planned increase: :--

9.

Projected date of last refueling which can be accommodated by present license capacity:

Scotember 2002 DUKE POWER COMPANY DATE: June 14.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 l

OPERATIN6 DATA REPORT DOCKET NO 50-414 DATE June 14. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Nase: Catawba 2 2.ReportingPeriod: May 1, 1996-May 31, 1996
3. Licensed Thersal Pcuer (MWth 3411
4. Naseplate Rating (Gross MWel:

1305a Notes aNaseplate Rating

9. Design Electrical Rating (Net MWeb 1145 (Gross MWe) calculated as
6. Marisus Dependable Capacity (Gross MWe b 1192 1450.000 MVA x.90 power
7. Maxieus Dependable Capacity (Net MWeb

!!29 factor per Page iii,

8. If Changes Occur in Capacity Ratings (!tess Nusber 3 Through 71 Since Last NUREG-0020.

Report. Give Reasons:

O. Power Level To Which Restricted, If Any (Net MWeh

10. Reason For Restrictions, If anys__

This Month Yr.-to-Date Cusulative

11. Hours In Reporting Period 744.0 3647.0 85776.0
12. Nusber Of Hours Reactor Was Critical 744.0 3404.3 67570.5
13. Reatter Reserve Shutdown Hours

--0--

--0-- -

14. Hours Generator On-Line 744.0 3366.1 66503.7
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross Thersal Energy Benerated (MWH1 2418538 11311077 214727615
17. Gross Electrical Energy Generated (MWH) 862079 4052428 76156795
18. Net Electrical Energy Generated (MWHI B17148 3845734 71757991
19. Unit Service Factor 100.0 92.3 77.5
20. Unit Availability Factor 100.0 92.3 77.5
21. Unit Capacity Factor (Using MDC Neti 97.3 93.4 74.0
22. Unit Capacity Factor (Using DER Net) 95.9 92.1 73.1 23.- Unit Forced Outage Rate 0.0 7.7 8.8
24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Eachh None
25. If Shut Down At End Of Report Period. Estisated Date of Startup:
26. Units In Test Status (Prior to Cossercial Operationh Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION I

l

l OPERATING DATA REPORT DOCKET NO 50-414 UNIT Catawba 2 DATE June 14. 1996 COMPLETED BY R.A. Williams TELEPHONE 704-382-5346 MONTH May 1996 QAl AVERABE DAILY POWER LEVEL LA1 AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Neti 1

1164 17 1137 2

1162 IB 493 3

!!59 19 1052 4

1153 20 1146 5

1152 21 1149 i

6 963 22 1153 7

552 23 1153 8

987 24

!!47 9

1141 25

!!51 10 1146 26 1155

!!52 27 1147 12

!!64 28 1152 13 1167 29 Ii52 14 1166 30 1159 15 1167 31

!!61 16 1158

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-414 UNIT NAME Carantsa z DATE ub/le/':#6 REPORT MONTH May 1996 COMPLETED BY

x. A _. william's TELEPHONE t/vei-Juz-d346 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 3-P 96 6 F

A HA CKTBKR

'2B' MAIN GENERATOR BREAKER TRIPPED DUE TO FAULTY LOAD TRANSFER CIRCUIT TIMER 4-P 96-5-18 F

B EA TRANSF MAIN TRANSFORMER TAP ADJUSTMENT

)

i (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions 1

S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data

~

B-Maintenance or test 2-Manual Scram Ent W Sneets For Licensee C-Refueling 3-Automatic Scram Event Report (LER) i D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other i

f f

_ _. ~. -

- _. _. ~ - - -

-m i

1 e

DOCKET: 50-414 UNIT: Catawba 2 Date: 06/14/96 l

NARRATIVE

SUMMARY

MONTH: May,1996 Catawba Unit 2 began the month of May operating at 100% fuli power. The unit operated at or near 100%

full power until 05/06/96 at 1637 when '2B' main generator breaker tripped due to faulty load transfer circuit timer resulting in a unit runback to 51% power. On 05/08/96 at 1725 the unit returned to 100%

power. On 05/17/96 at 2110 the unit began decreasing power and held at 46% power from 05/18/96 at 0225 to 2343 due to main transformer tap adjustment. The unit returned to 100% power on 05/19/96 at i126 and operated at or near 100% power the remainder of the month.

Prepared by: R. A. Williams i

Telephone: (704)- 382-5346

\\

MONTHLY REFUELING INFORM ATION REOUES_I 1.

Facility name:

Catawba. Unit 2 2.

Scheduled next refueling shutdown: March 1997 3.

Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

4 If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

l 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core: 19]

(b) in the spent fuel pool: $2.4 4

8.

Present licensed fuel pool capacity: 1413 i

Size of requested or planned increase: =

4 9.

Projected date of last refueling which can be accommodated by present license capacity:

Scotember 2Q11 i

4 1

1 l

DUKE POWER COMPANY DA'IT!: June 14.1996 Name of

Contact:

R. A. Williams Phone: (7(M) - 382-5346 f

1 l