Monthly Operating Repts for May 1996 for McGuire Nuclear Station Units 1 & 2
ML20112J304
Person / Time
Site: McGuire, Mcguire  Duke Energy icon.png
Issue date: 05/31/1996
From: Robert Williams
DUKE POWER CO.
To:
Shared Package
ML20112J203 List:
References
NUDOCS 9606200090
Download: ML20112J304 (10)


Text

-

i 4

4 s

SPERATING DATA REPORT l

l DOCKETNO 50-369 DATE June 14. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346

1. Unit Names McGuire !
2. Reporting Period: May 1, 1996-May 31, 1996
3. Licensed Thereal Power (Mt):

3411

4. Naseplate Rating (6tess MWe):

1305#

Notes *Naseplate Rating.

5. Design Electrical Rating (Net Me):

!!80 (6 toss Muel calculated as

~6. Manisue Dependable Capacity (6ross MWe):

!!71 1450.000 MVA

.90 power

7. Itaxieue Dependable Capacity (Net MWe):

!!29 factor per Page lit,

. 8. If Changes occur in Capacity Ratings (Itees Nueber 3 Through 7) Since Last NURE6-0020.

Report. Give Reasons

9. Power Level To Which Restricted, if Any (Net Mel
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cueulative t

it. Hours In Reporting Period 744.0 3647.0 127103.0

12. Nuoter Of Hours Reactor Was Critical 744.0 3068.5 91507.8 i
13. Reatter Reserve Shutdoun Hours

--0--

- --0--

14. Hours Generator On-Line 744.0 2976.8 90508.3
15. Unit Reserve Shutdown Hours

--0--

--0--

--0--

16. Gross Thereal Energy Generated (MM I 2529255 9980719 284734821
17. Gross Electrical Energy Generated (MHI 869767 3448373 97823653
18. Net Electrical Energy Generated (MW) 837346 3311722 93479293
19. Unit Service Factor 100.0 81.6 71.2
20. Unit Availability Factor 100.0 81.6 71.2
21. Unit Capacity Factor (Using MDC Net) 99.7 80.4 64.2 22.UnitCapaGtyfactor(UsingDERNet) 95.4 77.0 62.3
23. Unit Forced Outage Rate 0.0 1.9 13.2 24.' Shutdown Scheduled Over Nest 6 Mor,ths (Type, Date, and Duration of Each):

None-

25. If Shut Ocun At End Of Report Period. Estiaated Date of Startup:
26. Unitt In Test Status (Prior to Coseercial Operation):

Forecast Achieved e

INITIALCR!i!CALITY INii!AL ELECTRICITY COMERCIAL OPERAT10N 9606200090 960614 PDR ADOCK 05000369 t

R PDR

i

+

r v

OPERATING DATA REPORT 4

-t DOCKET NO 50-369 l

. Ulili McGuire 1 DATE Juns 14.1996 ColFLETED BY R.A. Williams TELEPHONE 704-302-5346 fl0llTH Mar.1996

't t

RE

AVERAGE DAILY Poller LEVEL RR AVERAGE DAILY Poller LEVEL-

-l (Mlle-Ilei1 -

(Mlle-Ilet) j t

1'

'1132 -

17 1129 2-1133=

18 1128 l

-3 1136 19 1127 l

t 4

1136 20 1128 5

1135 21 1127 l

t 6

1134 22 1113

--7

.. L130 '

23 1117 8

1131 24 1123 9

1132 25 '

1122

+

4 - 1130 26 1118 I

i 11 1131 27

!!24 12

!!26 28 1120

(

13 1124 29 1119

-14:-

1124 30 1117

' 15 '

1128 31 1082 4

16 1131 d

. i

)

. - =.,

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-369 UNIT NAME mwuixt, 1 DATE ub/le/yd REPORT MONTH May 1996 COMPLETED BY x.

A.

williams

~

TELEPHONE

( / ue )

.s a z -:>.5 e d (1)

(2)

(3)

(4)

(5)

R MET-E HOD T-A OF LICENSE N

.Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O-P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)

(2)

(3)

(4)

F Forced Reason-Method:

Exhibit G - Instructions S Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (NUREG-0161))

(LER D-Regulatory Restriction 4-Other (Explain).

File E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

G-Operator Error Exhibit I - Same Source H-Other i

i DOCKET: 50 369 UNIT: McGuire 1 Date:

06/14/96 NARRATIVE

SUMMARY

i.

MONTH: May,1996 McGuire Unit I began the month of May operating at 100% full power. The unit operated at or near 100%

- full power for the entire month.

t t

i

.i a

c J

P s

l

?

b i

. Prepared by: R. A. Williams Telephone:(704)- 382-5346 i

l 8

4

,ee a,

MONTHLY REFUFl.ING INFORMATION REOUEST 1.

Facili:y name:

McGuire. UniLl 2.

Scheduled next refueling shutdown: February 1997 3.

Scheduled restart following refueling: May 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSE AMENDMENT. THEREFORE, QUESTIONS 4 -

'I11 ROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

If no, has reload design and core configuration been reviewed by Safety Review Committee j

regarding unreviewed safety questions?

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

7.

Number of Fuel assemblies (a) in the core:.19)

(b) in the spent fuel pool: 223 8.

Present licensed fuel pool capacity: 1461 Size of requested or planned increase: :=

9.

Projected date of last refueling which can be accommodated by present license capacity: Maa;h

g...

DUKE POWER COMPANY DATE: June 14.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346 i

i

j OPERATJW6DATAREPORT DOCKET N0 50-370 DATE June 14. 1996 OPERATIN6 STATUS COMPLETED By R,A,Willians TELEPHONE 704-382-5346

1. Unit Name McGuire 2
2. Reporting Feriod: May 1, 1996-May 31, 1996
3. Licensed Thermal Power (MWt):

3411

4. Nameplate Rating (Gross MWel 1305e Notes *Naseplate Rating
5. Design Electrical Rating (Net MWels 1180 (Gross MWel calculated as
6. Marisus Dependable Capacity (6ross MWels 1171 1450.000 MVA x.90 power
7. Maxisus Dependable Capacity (Net MWel

!!29 factor per Page 111,

8. If Changes occur in Capacity Ratings (!tres Number 3 Through 7) Since Last NUREG-0020.

Report. Give Reasons:

9. Power Level To Which Restricted, if Any (Net MWelt
10. Reason For Restrictions, If any:

This Month Yr.-to-Date Cueulative

!!. Hours in Reporting Feriod 744.0 3647.0 107399.0

12. Nusber Of Hours Reactor Was critical 209.5 2493.0 B4248.6
13. Reactor Reserve Shutdown Hours

--0-- --0--

14. Hours Generator On-Line 180.5 1464.9 B3195.6 18.UnitReserveShutdownHours

- - -+-

16. Cross Thersal Energy Generated (MWH1 413906 6084550 273324199
17. Stoss Electrical Energy Generated (MWH) 137352 2842511i 95345791
18. Net Electrical Energy Generated (MWH) 120510 2724703 91437060
19. Unit Service Factor 24.3 6'.6 77.5
20. Unit Availability Factor 24.3 67.6 77.5
21. Unit Capacity Factor (Using MDC Net) 14.4 66.2 74.7
22. Unit Capacity Factor (Using DER Net) 13.7 63.3 72.2
23. Unit Forced Dutage Rate 56.6 8.7 6.5
24. Shutdoun Scheduled Over Next 6 Months (Type. Date, and Duration of Each):

None

25. If Shut Dean At End Of Report Period. Estinated Date of Startup: July 01, 1996
26. Units In Test Status (Prior to Coseercial Operationi:

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL DPERATION I

~.

.+

t 1

L l

9PERATING M TA REPORT f

i DOCKET N0 50-370-UNIT McGuire 2

[

MTE June 14.1996 COMPLETED BY ~ R.A.' Williams.

l TELEPIOlE 704-302-5346-

'[

.I l

-- 110 NTH

-Nav. 1996

- 96.

AVERM E M ILY POWER LEVEL-3g.

AVERAGE DAILY PONER LEYEL' (HWe-Wet)

(flue-Net) -

.i 1

0 17 464 j

f 2'

0 11 936 '

i 3

'0 19 1073 i

i

-4 0

20 1128 5

0 21 1130~

-i

.. ('

6.

0 22 101

.5 7

0 23 0

l 8

0 M

0 I

i l

9 0

-25 0

"10 0

26 0

i 11 0

27 0

l

-12 0

28 0

s 13 0

29 0

.14 11 30 0

i

~9 213-31 0

l

. 16

'214 i

l l

.J j

o

)

i J

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-370 UNIT NAME rit u u l g b z DATE ub/14/sb REPORT MONTH May 1996 COMPLETED BY x.

a.

Williams TELEPHONE t y u 4 ) - 3 u t.} :> > e 6 (1)

(2)

(3)

(4)

(5)

R MET-E HOD T

A OF LICENSE N

Y S

SHUT EVENT SYS-CAUSE AND CORRECTIVE O

P DURATION O

DOWN REPORT TEM COMPONENT ACTION TO DATE E

HOURS N

R/X NO.

CODE CODE PREVENT RECURRENCE 1

96 1 S

327.98 C

RC FUELXX END-OF-CYCLE 10 REFUELING OUTAGE 1-P 96-5-14 S

A HG XXXXXX FEEDWATER CHEMISTRY 2-P 96-5-15 S

B RC INSTRU POWER ESCALATION TESTING 3-P 96-5-15 S

A HH VALVEX FEEDWATER VALVE (2CF-28) 4-P 96-5-18 S

B RC INSTRU POWER ESCALATION TESTING 2

96-5-22 F

235.57 A

3 CB PUMPXX

'2B' REACTOR COOLANT PUMP TRIPPED (1)

(2)

(3)

(4)

F Forced Reason:

Method:

Exhibit G - Instructions S Scheduled A-Equi ment FailureB-Mainkenanceortest(Explain) 1-Manual for Preparation of Data 2-Manual Scram Entry Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER)

D-Regulatory Restriction 4-Other (Explain)

File (NUREG-0161)

E-Operator Training & License Examination F-Administrative (5)

(Explain) (Explain)

Exhibit I - Same Source G-Operator Error H-Other

I l

DOCKET: 50-370 l

UNIT: McGuire 2 Date:

06/14/96 l

t i

NARRATIVE

SUMMARY

i l

MONTH: May,1996 l

i McGuire Unit 2 began the month of May in end-of-cycle 10 refueling outage. The refueling outage j

spanned 39.44 days. The unit was placed on-line 05/14/96 at 1559. During power escalation, the unit held j

at approximately 10% power from 05/14/96 at 1700 to 2l00 due to feedwater chemistry. The unit held at i

30% power from 05/15/96 at 0000 to 05/17/96 at 0255 due to power escalation testing and feedwater valve i

(2CF-28).On 05/18/96 from 0314 to 1035 the unit held at 78% power due to power escalation tesung. On j

05/22/96 at 0426 *2B' reactor coolant pump tripped causing a reactor trip. The unit remained in the outage the remainder of the month.

j i

i i

i i

i i

Prepared by: R. A. Williams j

.. Telephone: (704)- 382-5346 j

t i

i 1

i e

MONTHLY REFUELING INFORMATION REOUEST l

I 1.

Facility name:

McGuire. Unit 2 2.

Scheduled next refueling shutdown: Scotember 1997 3.

Scheduled restart following refueling: kgember 1997 THE PROJECT MANAGER HAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CHANGE OR LICENSB AMENDMENT. THEREFORE, QUESTIONS 4 THROUGH 6 WILL NO LONGER BE MAINTAINED IN THIS REPORT.

4.

Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?

If yes, what will these be?

l l

If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?

i l

5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

6.

Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).

I 7.

Number of Fuel assemblies (a) in the core: 121 (b) in the spent fuelpool: 262 8.

Present licensed fuel pool capacity: 1461 Size of requested or planned increase: r.::-

9.

Projected date of last refueling which can be accommodated by present license capacity:

&cember 2001 DUKE POWER COMPANY DATE: June 14.1996 Name of

Contact:

R. A. Williams Phone: (704)- 382-5346

,