Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B11403, Forwards Fracture Prevention of Containment Pressure Boundary (GDC 51), in Response to Matls Engineering Branch SER Confirmatory Item 28.Results Verified Acceptability of Containment Pressure Boundary + (ML20112H449)
- ML20112H455 + (ML20112H455)
- ML20112H464 + (ML20112H464)
- ML20112H470 + (ML20112H470)
- ML20112H471 + (ML20112H471)
- ML20112H473 + (ML20112H473)
- ML20112H478 + (ML20112H478)
- ML20112H479 + (ML20112H479)
- ML20112H484 + (ML20112H484)
- ML20112H485 + (ML20112H485)
- ML20112H490 + (ML20112H490)
- ML20112H495 + (ML20112H495)
- ML20112H496 + (ML20112H496)
- ML20112H497 + (ML20112H497)
- ML20112H504 + (ML20112H504)
- ML20112H508 + (ML20112H508)
- 1CAN069602, Forwards Relief Request 96-001 for Application of Alternative Insp Approach for ASME Class 1 B-D pressure- Retaining full-penetration nozzle-to-vessel Welds & Nozzle Inner Radius Sections in SGs + (ML20112H512)
- ML20112H515 + (ML20112H515)
- ML20112H516 + (ML20112H516)
- ML20112H517 + (ML20112H517)
- ML20112H522 + (ML20112H522)
- ML20112H524 + (ML20112H524)
- 05000374/LER-1982-021, Informs of Change in C/A in LER 82-021-00 Re RCIC Leak Detection Miswired + (ML20112H525)
- ML20112H527 + (ML20112H527)
- ML20112H532 + (ML20112H532)
- ML20112H534 + (ML20112H534)
- ML20112H535 + (ML20112H535)
- ML20112H536 + (ML20112H536)
- ML20112H540 + (ML20112H540)
- ML20112H542 + (ML20112H542)
- ML20112H544 + (ML20112H544)
- ML20112H550 + (ML20112H550)
- ML20112H552 + (ML20112H552)
- ML20112H553 + (ML20112H553)
- ML20112H555 + (ML20112H555)
- ML20112H557 + (ML20112H557)
- ML20112H559 + (ML20112H559)
- ML20112H560 + (ML20112H560)
- ML20112H562 + (ML20112H562)
- ML20112H565 + (ML20112H565)
- ML20112H574 + (ML20112H574)
- BECO-85-061, Forwards Final Rept of Inservice Insps Conducted During 1984 & Refueling Outage 6.Results of Mechanized,Manual,Surface & Direct Visual Exams Summarized in Encl Exam Summary Rept. Final Rept Contains 26 Vols + (ML20112H587)
- L-84-240, Forwards Written Responses & Ref Matls to Substantiate Statements Made During 840907 Exit Interview Re Reactor & Senior Reactor Operating Exams on 840905 + (ML20112H594)
- ML20112H595 + (ML20112H595)
- ML20112H601 + (ML20112H601)
- ML20112H605 + (ML20112H605)
- 05000361/LER-1984-077, :on 841210,control Room Isolation Sys (Cris) Train B Inadvertently Actuated While Instrumentation & Control Technicians Performed 31-day Surveillance.Caused by Failure to Fully Depress Cris Switch + (ML20112H612)
- ML20112H616 + (ML20112H616)
- ML20112H618 + (ML20112H618)
- ML20112H619 + (ML20112H619)
- 05000271/LER-1984-024, :on 841213,functional Testing of HPCI-torus Water Level Sys Not Performed During Wk of 841001.Caused by Inadvertent Administrative Oversight in Scheduling. Surveillance Procedures Revised + (ML20112H621)