Forwards Ga Technologies,Inc 850124 Document 907785, NDE of 62 Fuel & Reflector Elements from Fort St Vrain Core Segment 3. All Fuel Elements,Including FTE-2,in Good Condition & irradiation-induced Dimensional Change Small
ML20112H464
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/21/1985
From: Brey H
PUBLIC SERVICE CO. OF COLORADO
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML20112H468 List:
References
P-85096, TAC-57625, NUDOCS 8504020262
Download: ML20112H464 (2)


Text

, ,

^

. r,..

O PublicService 2420 W. 26th Avenue, Suite 1000, Denver, CO 80211 company of colo,.do P.O. Box 840 Denver, CO 80201- 0840 (303) 571- 7511 March 21, 1985 Fort St. Vrain Unit No. 1 P-85096 Regional Administrator 32@SUME

)

Region IV U. S. Nuclear Regulatory Commission W27E 611 Ryan Plaza Drive, Suite 1000 p Arlington, TX 76011 Attn: Mr. E. H. Johnson DOCKET N0. 50-267

SUBJECT:

Segment 3 and FTE-2 Nondestructive Examination Report

REFERENCES:

1) P-84104, Warembourg to Collins, dated 4/6/84
2) P-84076, Warembourg to Collins, dated 3/6/84
3) P-84053, Warembourg to Collins, dated 2/15/84

Dear Mr. Johnson:

Enclosed are 40 copies of GA Document No. 907785, " Nondestructive Examination of 62 Fuel and Reflector Elements from Fort St. Vrain Core Segment 3," January 24, 1985. The work described in this report fulfills the Segment 3 and FTE-2 nondestructive examination commitment as defined in references 1, 2, and 3.

This report describes the results of nondestructive examinations (visual and metrology) of selected Segment 3 fuel elements, including fuel test element FTE-2. The results of these examinations showed that all of the fuel elements are in good condition (no cracks were observed) and that the irradiation-induced dimensional change of the elements was small and consistent with our expectations.

V f

8504020262 850321 gDR ADOCK0500g7 )) O u

e .y 4 o

.P-85096 Page 2 l P. lease note that Reference 1 erroneously included Region 29 in the Segment 3 PIE program. As shown in the attachments to Reference 1, Region 29 was not included in the overheads presented or the discussions at the April 4, 1984 meeting, and was not intended to be, nor was part of the Segment 3 PIE program.

If you have any questions regarding this report, please call Mr. M. H. Holmes at (303) 571-8409.

Very truly yours,

14. L. Gy )y l 71$hb3 @edUr H. L. Brey, Manager Nuclear Licensing and Fuels Division HLB /JCS:pa Enclosures