MONTHYEARML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0261998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 1.With 990115 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr ML18106A9831998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 2.With 981214 Ltr ML18106A9801998-11-30030 November 1998 Monthly Operating Rept for Nov 1998 for Salem,Unit 1.With 981214 Ltr ML18106A9641998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 2. with 981112 Ltr ML18106A9631998-10-31031 October 1998 Monthly Operating Rept for Oct 1998 for Salem,Unit 1. with 981112 Ltr ML18106A9151998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 2.With 981012 Ltr ML18106A9131998-09-30030 September 1998 Monthly Operating Rept for Sept 1998 for Salem,Unit 1.With 981012 Ltr ML18106A8751998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Generating Station,Unit 2.With 980915 Ltr ML18106A8741998-08-31031 August 1998 Monthly Operating Rept for Aug 1998 for Salem Unit 1.With 980915 Ltr ML18106A8161998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 1. W/980817 Ltr ML18106A8151998-07-31031 July 1998 Monthly Operating Rept for July 1998 for Salem,Unit 2. W/980817 Ltr ML18106A7151998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 2. W/980715 Ltr ML18106A7141998-06-30030 June 1998 Monthly Operating Rept for June 1998 for Salem,Unit 1. W/980715 Ltr ML18106A6541998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 1. W/980615 Ltr ML18106A6531998-05-31031 May 1998 Monthly Operating Rept for May 1998 for Salem Unit 2. W/980615 Ltr ML18106A6121998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Generating Station,Unit 1.W/980515 Ltr ML18106A6111998-04-30030 April 1998 Monthly Operating Rept for Apr 1998 for Salem Unit 2. W/980515 Ltr ML18106A5561998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem,Unit 1. W/980415 Ltr ML18106A4591998-03-31031 March 1998 Monthly Operating Rept for Mar 1998 for Salem Unit 2. W/980415 Ltr ML18106A3771998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 1.W/980316 Ltr ML18106A3761998-02-28028 February 1998 Monthly Operating Rept for Feb 1998 for Salem Generating Station,Unit 2.W/980316 Ltr ML18106A3281998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 2. W/980217 Ltr ML18106A3271998-01-31031 January 1998 Monthly Operating Rept for Jan 1998 for Salem,Unit 1. W/980217 Ltr ML18106A2721997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem,Unit 2. W/980115 Ltr ML18106A2711997-12-31031 December 1997 Monthly Operating Rept for Dec 1997 for Salem Generating Station,Unit 1.W/980115 Ltr ML18106A2081997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 1. W/971212 Ltr ML18106A2071997-11-30030 November 1997 Monthly Operating Rept for Nov 1997 for Salem,Unit 2. W/971212 Ltr ML18102B6811997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 2.W/ 971117 Ltr ML18102B6801997-10-31031 October 1997 Monthly Operating Rept for Oct 1997 for Salem,Unit 1.W/ 971117 Ltr ML18102B6271997-09-30030 September 1997 Monthly Operating Rept for Sept 1997 for Salem,Unit 2. W/971015 Ltr 1999-09-30
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217A9931999-09-30030 September 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data ML18107A5581999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 2.With 991014 Ltr ML18107A5571999-09-30030 September 1999 Monthly Operating Rept for Sept 1999 for Salem,Unit 1.With 991014 Ltr ML18107A5301999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 2.With 990913 Ltr ML18107A5311999-08-31031 August 1999 Monthly Operating Rept for Aug 1999 for Salem,Unit 1.With 990913 ML18107A5031999-08-26026 August 1999 LER 99-006-00:on 990729,determined That SG Blowdown RMs Setpoint Was non-conservative.Caused by Inadequate ACs for Incorporating Original Plant Licensing Data Into Plant Procedures.Blowdown Will Be Restricted.With 990826 Ltr ML18107A5201999-08-12012 August 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#9) Second Interval,Second Period, First Outage (96RF). ML18107A4811999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 1.With 990813 Ltr ML18107A4821999-07-31031 July 1999 Monthly Operating Rept for July 1999 for Salem,Unit 2.With 990813 Ltr ML18107A4691999-07-28028 July 1999 LER 99-008-00:on 990714,determined That Limit Switch Cables Were Subject to Multiple Hot Shorts in Same Fire Area.Caused by Inadequate Original Post Fire Safe Shutdown Analysis.All Limit Switch Cables for MOVs Were Reviewed.With 990728 Ltr ML18107A4441999-07-0606 July 1999 LER 99-007-00:on 990605,surveillance for Quadrant Power Tilt Ratio (QPTR) Was Missed.Caused by Human Error.Qptr Calculation Was Performed & Personnel Involved Have Been Held Accountable IAW Pse&G Policies.With 990706 Ltr ML18107A4211999-07-0202 July 1999 LER 99-005-00:on 990605,11 Containment Declared Inoperable. Caused by Valves 11SW72 & 11SW223 Both Leaking.Procedure S1.OP-ST.SW-0010(Q) Was Enhanced to Provide Specific Instructions to Ensure Proper Sequencing.With 990702 Ltr ML18107A4331999-07-0101 July 1999 LER 99-002-01:on 990405,determined That 2SA118 Failed as Found Leakrate Test.Caused by Foreign Matl Found in 2SA118 valve.2SA118 Valve Was Cycled Several Times & Seat Area Was Air Blown in Order to Displace Foreign Matl.With 990701 Ltr ML18107A4321999-07-0101 July 1999 LER 99-006-01:on 990501,determined That There Was No Flow in One of Four Injection Legs.Caused by Sticking of Valve in Safety Injection Discharge Line to 21 Cold Leg.Valve Was Cut Out of Sys & Replaced.With 990701 Ltr ML18107A5211999-07-0101 July 1999 Rev 0 to Sgs Unit 2 ISI RFO Exam Results (S2RFO#10) Second Interval,Second Period,Second Outage (99RF). ML18107A4351999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 1.With 990713 Ltr ML18107A4341999-06-30030 June 1999 Monthly Operating Rept for June 1999 for Salem,Unit 2.With 990713 Ltr ML20196H8621999-06-30030 June 1999 NRC Regulatory Assessment & Oversight Pilot Program, Performance Indicator Data, June 1999 Rept ML18107A3951999-06-17017 June 1999 LER 99-004-00:on 990520,reactor Tripped from 100% Power,Due to Negative Flux Trip Signal from Nuclear Instrumentation. Cause Has Not Been Determined.Discoloration Was Identified on One of Penetrations.With 990617 Ltr ML18107A3661999-06-0909 June 1999 LER 99-003-00:on 990513,unplanned Entry Into TS 3.0.3 Was Made.Caused by Human error.Re-positioned Creacs Supply Fan Selector Switches & Revised Procedures S1 & S2.OP-ST.SSP-0001(Q).With 990609 Ltr ML18107A3551999-06-0202 June 1999 LER 99-005-00:on 990504,failure to Meet TS Action Statement Requirements for High Oxygen Concentration in Waste Gas Holdup Sys Occurred.Caused by Inability of Operators. Existing Procedures Will Be Evaluated.With 990602 Ltr ML18107A3441999-06-0101 June 1999 Interim Part 21 Rept Re Premature Over Voltage Protection Actuation in Circuit Specific Application in Dc Power Supply.Testing & Evaluation Activities Will Be Completed on 990716 ML18107A3541999-06-0101 June 1999 LER 99-006-00:on 990501,HHSI Flow Balance Discrepancy Was Noted During Surveillance.Caused by Sticking of Check Valve in SI Discharge Line to 21 Cold Leg.Valve 21SJ17,was Cut Out of Sys & Replaced.With 990601 Ltr ML18107A3681999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 1.With 990611 Ltr ML18107A3721999-05-31031 May 1999 Monthly Operating Rept for May 1999 for Salem Generating Station,Unit 2.With 990611 Ltr ML18107A2931999-05-12012 May 1999 LER 99-002-00:on 990413,determined That Number 12 Auxiliary Bldg Exhaust Fan Was Rotating Backwards.Caused by mis-wiring of Motor Due to Human Error by Maint technician.Mis-wiring Was Corrected & Fan Was Returned to Svc.With 990512 Ltr ML18107A2781999-05-10010 May 1999 LER 99-004-00:on 990411,automatic Actuation of ESF Occurred During Reactor Vessel Head Removal in Support of Refueling Operations.Caused by High Radiation Condition.Containment Atmosphere Was Monitored.With 990505 Ltr ML18107A2791999-05-0404 May 1999 LER 99-003-00:on 990406,all Salem Unit 2 Chillers Rendered Inoperable.Caused by Human Error.Lessons Learned from Event Were Communicated to All Operators by Including Them in Night Orders.With 990504 Ltr ML18107A2741999-05-0303 May 1999 LER 99-002-00:on 990405,determined That Containment Isolation Valve Failed as Found Leakrate Test.Caused by Foreign Matl Blocking Valves from Closing.Check Valve Mechanically Agitated.With 990504 Ltr ML18107A3711999-04-30030 April 1999 Corrected Monthly Operating Rept for Apr 1999 for Salem Generating Station,Unit 1 ML18107A3151999-04-30030 April 1999 Submittal-Only Screening Review of Salem Generating Station Individual Plant Exam for External Events (Seismic Portion), Rev 1 ML18107A2991999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 1.With 990514 Ltr ML18107A2971999-04-30030 April 1999 Monthly Operating Rept for Apr 1999 for Salem Unit 2.With 990514 Ltr ML18107A2351999-04-23023 April 1999 LER 99-001-00:on 990330,MSSV Failed Lift Set Test.Caused by Setpoint Variance Which Is Result of Aging.Valves Were Adjusted & Retested to Ensure TS Tolerance.With 990423 Ltr ML18107A2881999-04-0707 April 1999 Rev 0 to NFS-0174, COLR for Salem Unit 2 Cycle 11. ML18107A1821999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 1.With 990414 Ltr ML18107A1831999-03-31031 March 1999 Monthly Operating Rept for Mar 1999 for Salem,Unit 2.With 990414 Ltr ML18106B1471999-03-29029 March 1999 LER 99-001-00:on 990228,reactor Scram Was Noted as Result of Turbine Trip.Caused by Operator Error.Lesson Plans Revised to Explicitly Demonstrate Manner in Which Valve Functions. with 990329 Ltr ML18106B1021999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 2.With 990315 Ltr ML18106B1011999-02-28028 February 1999 Monthly Operating Rept for Feb 1999 for Salem Unit 1.With 990315 Ltr ML18106B0931999-02-25025 February 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Caused by Crack Due to Improper Location of Heated Bar.Only One Part Out of 7396 Pieces in Forging Lot Was Found to Be Cracked.Affected Util,Notified ML18106B0701999-02-16016 February 1999 LER 98-015-00:on 981208,inadvertent Discharge Through RHR Relief Valve During Startup Was Noted.Caused by Operator Performing Too Many Tasks Simultaneously.Appropriate Actions Have Been Taken IAW Policies & Procedures.With 990216 Ltr ML18106B0551999-02-0101 February 1999 Part 21 Rept Re Possible Matl Defect in Swagelok Pipe Fitting Tee,Part Number SS-6-T.Defect Is Crack in Center of Forging.Analysis of Part Is Continuing & Further Details Will Be Provided IAW Ncr Timetables.Drawing of Part,Encl ML18106B0561999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 2.With 990212 Ltr ML18106B0571999-01-31031 January 1999 Monthly Operating Rept for Jan 1999 for Salem Generating Station,Unit 1.With 990212 Ltr ML20205P1671999-01-31031 January 1999 a POST-PLUME Phase, Federal Participation Exercise ML18106B0441999-01-29029 January 1999 Part 21 Rept Re Possible Defect in Swagelok Pipe Fitting Tee Part Number SS-6-T.Caused by Crack in Center of Forging. Continuing Analysis of Part & Will Provide Details in Acoordance with NRC Timetables ML18106B0491999-01-28028 January 1999 LER 98-007-01:on 980730,reactor Coolant Instrument Line through-wall Leak Was Noted.Caused by Transgranular Stress Corrosion Cracking.Replaced Affected Tubing.With 990128 Ltr ML18106B0401999-01-18018 January 1999 LER 98-016-00:on 981219,ECCS Leakage Was Outside of Design Value.Caused by Leakage Past Seat of 21RH34 Manual Drain. Valve 21RH34 Was Reseated.With 990118 Ltr ML18106B0251998-12-31031 December 1998 Monthly Operating Rept for Dec 1998 for Salem Unit 2.With 990115 Ltr 1999-09-30
[Table view] |
Text
. AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-311 Unit Name Salem # 2 Date Jan. 10,1985 Completed by J. P. Ronafalvy Telephone 609-935-6000 Extension 4455 Month December 1984 Day Average Daily Power Level Day Average Daily Power Level (MWe-NET) (MWe-NET) 1 0 17 0 2 0 18 0 3 0 19 0 4 0 20 0 5 0 21 0 6 0 22 0 7 0 23 0 8 0 24 0
- 9. 0 25 0 10 0 26 0 11 0 27 0 12.. 0 28 0 13 0 29 0 14 0 30 0 15 0 31 0 16 0
.Pg. 8,1-7 R1 8501170247 841231 PDR ADOCK-05000311 R PDR III
OPERATING DATA REPORT Docket No. 50-311 Date Jan. 10,1985 Telephone 935-6000 Completed by J. P. Ronafalvy Extension 4455 Operating Status
- 1. Unit Name Salem No. 2 Notes
- 2. Reporting Period December 1984
- 3. Licensed Thermal Power (MWt) 3411
- 4. Nameplate Rating (Gross MWe) 1162
- 5. Design Electrical Rating (Net MWe) 1115
- 6. Maximum Dependable Capacity (Gross MWe)1149 i
- 7. Maximum Dependable Capacity (Net MWe) 1106
- 8. If Changes Occur in Capacity Ratings (items 3 through 7) since Last Report, Give Reason N/A
- 9. Power Level to Which Restricted, if any (Net MWe) N/A
- 10. Reasons for Restrictions, if any N/A This Month Year to Date Cumulative
- 11. Hours in Reporting Period 744 8784 28225
- 12. No. of Hrs. Reactor was Critical 0 3386.0 15094.6
- 13. Reactor Reserve Shutdown Hrs. 0 1442.9 3533.6
- 14. Hours Generator On-Line 0 3194.8 14612.1
- 15. Unit Reserve Shutdown Hours 0 0 0
- 16. Gross Thermal Energy Generated (M103) 0 10255964 43727036
- 17. Gross Elec. Energy Generated (MWH) 0 3409360 14277650
- 18. Net Elec. Energy Generated (MWH) (2965) 3200588 13517836
- 19. Unit Service Factor 0 36.4 51.8
- 20. Unit Availability Factor 0 36.4 51.8
- 21. Unit Capacity Factor (using MDC Net) 0 32.9 43.3
- 22. Unit Capacity Factor (using DER Net) 0 32.7 43.0
- 23. Unit Forced Outage Rate 0 56.6 37.1
- 24. Shutdowns scheduled over next 6 months (type, date and duration of each)
N/A
, 25. If shutdown at end of Report Period, Estimated Date of Startup:
4-1-85
- 26. Units in Test Status (Prior to Commercial Operation) :
Forecast Achieved Initial Criticality 6/30/80 8/2/80 Initial Electricity 9/1/80 6/3/81 Commercial Operation 9/24/80 10/13/81 8-1-7.R2
UNIT SHUTDOWN AND POWER REDUCTIONS Docket No. 50-311 REPORT MONTH-December 1984- Unit Name- Salem No.2 '
Date Jan. 10,1985 Completed by J.P. Ronafalvy Telephone 609-935-6000 Extension 4455 Method of Duration Shutting License Cause and Corrective Action to No. Date Type Hours Reason Down Event System Component 1 2 Reactor Report Code 4 Code 5 Prevent Recurrence Generator Major Overhaul HA GENERA 84-302 11-03 F 744 A 4 - .
Major Turbine TURBIN Overhaul 84-302 11-03' S 744 A 4 - HA Misc. Major -
.84-302 11-03 S 744 B 4 - HC HTEXCH Condenser Overhaul 1 2 Reason 3 Method 4 Exhibit G 5 Exhibit 1 F: Forced A-Equipment Failure-explain 1-Manual Instructions Salem as S: Scheduled B-Maintenance or Test 2-Manual Scram. for Prepara- Source C-Refueling 3-Automatic Scram. tion of Data D-Regulatory Restriction 4-Continuation of Entry Sheets E-Operator Training &. Licensing Exam Previous Outage for Licensee F-Administrative 5-Load Reduction Event Report G-Operational Error-explain 9-Other (LER) File H-Other-explain ,
(NUREG 0161)
MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH DECEMBER 1984 UNIT NAME: Salem 2 DATE: January 10, 1984 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/935-6000 X4455
- DCR NO. PRINCIPLE SYSTEM SUBJECT 2EC-1566 Chilled Water Install a 10 psig relief valve at the chilled water expansion tank.
2EC-1733 Waste Disposal-Liquid Replace existing impeller, coupling set and motor on No.
2 Waste Evaporator Feed Pump with upgraded components.
2EC-1944 Cables and 28VDC Replace existing 2C #14 cable (2BDE7A-ET) with a new cable so that the original. cable manufactured by AIW, can be tested for E.Q. Replaced cable should be qualified cable.
2EC-1957 Pressurizer System Modify control circuit to 2PR6 and 2PR7 valves.
2EC-1963 Service Water Position No. 24 Service Water Motor (Allis Chalmers) has failed and is being replaced with a spare (GE) motor.
2EC-1998 Steam Generator Feed Provide inspection openings Pumps on both north and south side o f the No. 22 Steam Generator feed baseplate.
-2SC-0483 Chilled Water Change shaft sleeve material
(#22 Chiller.cond. from stainless steel- (316) to Recirc Pump only) monel.
2FC-1162 24 RCP Motor Replace #24 RCP motor rotor resistance rings with new-improved design.
MAJOR PLANT MODIFICATIONS DOCKET NO.: 50-311 REPORT MONTH DECEMBER 1984 UNIT NAME: Salem 2 DATE: January 10, 1984 COMPLETED BY: J. Ronafalvy TELEPHONE: 609/339-4455 DCR NO. 10CFR 50.59 SAFETY EVALUATION 2EC-1566 This change does not jeopardize the pressure retaining boundary nor does it impact the operation / basic design of the Chilled Water System. No unreviewed safety or environmental questions are involved.
2EC-1733 This change to upgrade the Waste Evaporator Feed Pump capacity is consistent with the manufacturers rating tor maximum working pressure of the pump and design rating of the Liquid Waste Disposal System piping. No unreviewed safety or environmental questions are involved.
2EC-1944 This change involves no potential for failures or malfunctions. No unreviewed safety or environmental questions are involved.
2EC-1957 This change involves enhancement of the valve operation and is in accordance with the manufacturers recommendation for valve movement. No unreviewed safety or environmental questions are involved.
2EC-1963 This change involves hookup of non-safety related thermocouples.to the new motor. No unreviewed safety or environmental questions are involved.
2EC-1998 The modification to the baseplate of No. 22 Steam Generator Feed Pump does not affect any presently performed safety analysis nor does it create any new hazards. The basis for the Technical Specifications remains unchanged. No unreviewed safety or environmental questions are involved.
2SC-0483 The new shaft sleeves are designed to the same requirements as per the original pump design. The material change from stainless steel to monel does not affect'any presently' performed safety analysis nor does it create any new hazards. The basis for the Technical Specifications remains unchanged. No unreviewed safety or environmental questions are involved.
2SC-1162 Implementation of this DCR does not add, delete, or alter any safety related equipment. No unreviewed safety or environmental questions are involved.
PSE&G SALEM GENERATING STATION SAFETY RELATED WORK ORDER LOG SALEM UNIT 2 WO NO DEPT UNIT EQUIPMENT IDENTIFICATION ~
0099121204 SMD 2 VALVE 21SW22 FAILURE DESCRIPTION: VALVE WILL NOT OPERATE MANUALLY CORRECTIVE. ACTION: REPLACED BEVEL GEAR AND HANDWHEEL MECHANISM 84-12-19-009-2 SMD 2. NO.~22 BAT PUMP FAILURE DESCRIPTION: PUMP DOES NOT PUMP CORRECTIVE ACTION: REPLACED DIAPHRAGM ON 21CV156 0099124696 SMD 2 . VALVE 22RH19 FAILURE DESCRIPTION: VALVE WILL NOT OPEN CORRECTIVE ACTION: REPLACED OPERATE / RESET COIL ON CONTROL CIRCUIT 84-12-40-085-9 SMD. 2 2A VITAL BUS INVERTOR FAILURE DESCRIPTION: NO TRANSFER TO NORMAL FEED CORRECTIVE ACTION: REPLACED K1, K2, AND K4 RELAY AND TIGHTENED LOOSE WIRE ON TP2-5 0099120861 _
-SMD 2 W BE OIL COOLER FAILURE DESCRIPTION: SERVICE WATER LEAK, CRACK ON WELD ON BELL CORRECTIVE ACTION: CLEANED AND' REPAIRED WELD
. . _ . . - _ _ _ - - .- . . -~ _ _ . - _
SALEM UNIT 2 WO NO ' DEPT UNIT EQUIPMENT IDENTIFICATION 84-11-06-001-2 SMD 2 2VC1 FAILURE DESCRIPTION: EXPANSION BOOT UPSTREAM OF VALVE HAS A RIP-IN-IT a
CORRECTIVE ACTION: REPLACED RUBBER EXPANSION JOINT .
84-11-17-011-0 -
- SMD 2 2A EMERGENCY DIESEL
! FAILURE DESCRIPTION: THE LUBE OIL HEATER HAS FAILED AND CAUGHT ON FIRE I
CORRECTIVE ACTION: LUBE OIL HEATER ELEMENT REPLACED; INSTALLED NEW LUBE OIL FLOW DEVICE
]
9 I >
.I .
i 4
J j
i 4
SALEM GENERATING STATION MONTHLY OPERATING
SUMMARY
- UNIT NO. 2 DECEMBER 1984 The period began with the second refueling / turbine outage in progress.
Mode 6 (first Reactor Head stud detensioned) was entered on 12/14/84.
Main Generator replacement work continues. The General Electric Generator was set in place two (2) days ahead of schedule. Turbine work is continuing. All lower and upper inner cylinders have been removed for reblading and the machining of sealing areas is in progress. Steam Generator eddy current work was completed. All secondary work on the Steam Generators was completed. No. 24 Steam Generator tube leak repair was completed. Reactor disassembly work was completed. All new fuel has been received and is in storage.
Core unloading commenced on 12/22/84 and was completed on 12/30/84.
Nos. 21 and 23 Reactor Coolant Pump (RCP) seal replacement has been completed. Type C leak rate testing of Containment Isolation Valves is in progress. No. 21 Service Water Header outage and No. 2A Vital Bus outage activities were completed. 2B Battery and 2C Battery cell replacement was initiated and completed. No. 21 Component Cooling Heat Exchanger tube inspections have been complete. A significant number of tube wall thinning was found. Selected retubing of No. 21 Component Cooling Heat Exchanger tubes was started. Approximately 1600 tubes will be replaced. MSR work waa started and is continuing.
REFUELING INFORMATION DOCKET NO.: 50-311 COMPLETED BY: J. Ronafalvy UNIT NAME: Salem 2 DATE: January 10, 1985 TELEPHONE: 609/935-6000 EXTENSION: 4455 Month December 1984
- 1. Refueling information has changed from last month:
YES X NO
- 2. Scheduled date for next refueling: October 4, 1984
- 3. Scheduled date for restart following refueling: April 1, 1985
- 4. A) Will Technical Specification changes or other license amendments be required?
YES X* NO B) Has the reload fuel design been reviewed by the Station Operating Review Committee?
YES X NO If no, when is it scheduled? N/A
- 5. Scheduled date (s) for submitting proposed licensing action:
N/A
- 6. Important licensing considerations associated with refueling:
NONE
- 7. Number of Fuel Assemblies:
A) Incore 0 B) In Spent Fuel Storage 265
- 8. Present licensed spent fuel storage capacity: 1170 Future spent fuel storage capacity: 1170
- 9. Date of last refueling that can be discharged to spent fuel pool as'suming the'present licensed. capacity: March 2004 8-1-7.R4
- A request for Technical Specification change that is required for Salem 2 Cycle 3 operation was transmitted to the NRC in our letter dated 10/15/84.
~
~
O PSEG Public Service Electric and Gas Company P.O. Box E Hancocks Bridge, New Jersey 08038 Salem Generating Station January 10, 1985 Director, Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555
Dear Sir:
MONTHLY OPERATING REPORT SALEM NO. 2 DOCKET NO. 50-311 In Compliance with Section 6.9, Reporting Requirements for the Salem Technical Specifications, 10 copies of the following monthly operating reports for the month of December 1984 are being sent to you.
Average Daily Unit Power Level Operating Data Report Unit Shutdowns and Power Reductions Major Plant Modification Safety Related Wo rk Orders Operating Summary Refueling Information Sincerely yours,
/? 1l y ,
e,2 .
J. M. Zupko, Jr.
General Manager - Salem Operations JR:sbh cc: Dr. Thomas E. Murley Regional Administrator USNRC Region I (