Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20106D660 + (ML20106D660)
- ML20106D661 + (ML20106D661)
- ML20106D663 + (ML20106D663)
- ML20106D678 + (ML20106D678)
- ML20106D690 + (ML20106D690)
- ML20106D692 + (ML20106D692)
- ML20106D694 + (ML20106D694)
- ML20106D701 + (ML20106D701)
- ML20106D705 + (ML20106D705)
- ML20106D707 + (ML20106D707)
- ML20106D710 + (ML20106D710)
- ML20106D711 + (ML20106D711)
- ML20106D716 + (ML20106D716)
- ML20106D723 + (ML20106D723)
- ML20106D724 + (ML20106D724)
- LD-92-102, Forwards Rev 0 to NPX80-IC-DP-790-01, Nuplex 80+ Advanced Control Complex Design Bases, to Support Human Factors Engineering Review of System 80+ Control Room + (ML20106D730)
- ML20106D734 + (ML20106D734)
- ML20106D737 + (ML20106D737)
- ML20106D740 + (ML20106D740)
- ML20106D746 + (ML20106D746)
- ST-HL-AE-4223, Responds to NRC Re Violation Noted in Insp Rept 50-499/92-24.Corrective Actions:Electrical Auxiliary Bldg (Eab) HVAC Sys Lineup Procedure Revised & Eab & Fuel Handling Bldg HVAC Sys Lineup Procedures Reviewed + (ML20106D748)
- 3F0784-20, Responds to NRC Re Violations Noted in Insp Rept 50-302/84-16.Corrective Actions:Short Term Instruction Issued to Remind Reviewers to Assure All Required Data Sheets to Procedures Completed Prior to Transmittal + (ML20106D752)
- ELV-04020, Forwards Rev 17 to Emergency Plan.Rev Promulgated for Singular Purpose of Incorporating ERDS + (ML20106D764)
- 05000387/LER-1982-054-01, /01X-1:on 821115,during Startup Testing Program, Drywell Temp Exceeded Tech Spec Limit of 135 F.Caused by Drywell Chiller Tripping While Standby Unit Out of Svc for Maint.Drywell Coolers Turned on + (ML20106D766)
- ELV-04050, Responds to Violations Noted in Insp Rept 50-425/92-19 on 920807-18.Corrective actions:balance-of-plant Operator Disciplined Per Util Positive Discipline Program & Shift Briefings Conducted to Address at Controls Responsibility + (ML20106D773)
- ML20106D779 + (ML20106D779)
- ELV-04073, Monthly Operating Repts for Sept 1992 for Vogtle Electric Generating Station,Unit 1 & 2 + (ML20106D780)
- ML20106D782 + (ML20106D782)
- ML20106D788 + (ML20106D788)
- ML20106D789 + (ML20106D789)
- ML20106D792 + (ML20106D792)
- 05000293/LER-1984-012, :on 840920,emergency Diesel Generator B Inadvertently Started During Surveillance Test.Caused by Unplanned Start Due to Nonlicensed Personnel Error.Diesel Secured & Personnel Counseled + (ML20106D795)
- ML20106D797 + (ML20106D797)
- ML20106D808 + (ML20106D808)
- ML20106D811 + (ML20106D811)
- ML20106D817 + (ML20106D817)
- ML20106D823 + (ML20106D823)
- ML20106D825 + (ML20106D825)
- ML20106D827 + (ML20106D827)
- ML20106D829 + (ML20106D829)
- ML20106D830 + (ML20106D830)
- 05000366/LER-1984-007-01, :on 840908,reactor Water Cleanup Inboard Isolation Valve 2G31-F001 Isolated Due to High Differential Temp in Pump Room.Caused by Inboard Seal Leak on Reactor Water Cleanup Pump 2A.Pump Repaired + (ML20106D833)
- ML20106D839 + (ML20106D839)
- ML20106D845 + (ML20106D845)
- ML20106D849 + (ML20106D849)
- 05000335/LER-1984-009-02, :on 840914,shear Pin Broke on Traveling Screen 1B1 Requiring Circulating Water Pump 1B1 to Be Shutdown.Side Condenser B Lost Cooling & Reactor Manually Tripped.Intake Screens Repaired.Reactor Restarted + (ML20106D859)
- TXX-4330, Interim Deficiency Rept SDAR-140 Re Main Steam Relief Valves Not Qualified for Actual Loading Conditions.Initially Reported on 840710.Item Not Reportable Per 10CFR50.55(e) + (ML20106D863)
- W3P84-2810, Interim Significant Const Deficiency Rept 57 Re Inadequate Instrumentation & Control Installations & Turnover Documentation.Ongoing Efforts Associated W/Resolution of Issues Still Under Review.Final Rept by 841031 + (ML20106D873)
- ML20106D888 + (ML20106D888)
- 05000387/LER-1984-040, :on 840910,diesel Generator D Tripped on High Turbo Charger Vibration During Monthly Operability Test. Caused by Radial Turbo Charger Bearing Failure.On 840911,RHR Full Flow Test Valve Failed + (ML20106D899)
- W3P84-2821, Interim Rept of Significant Const Deficiency 84 Re Tube Truck Welding Defects.Ongoing Efforts Associated W/ Resolution of Issues in NRC Still Under Review. Final Rept Will Be Submitted by 841031 + (ML20106D918)