erw e THE CLEVELAND ELECTRIC ILLUMIN ATING COMPANY P.O. BOX 5000 - CLEVELAND, OHlO 44101 - TELEPHONE (216) 622-9800 - lLLUMINATING BLDO.
- 55 PUBLIC SQUARE Serving The Best Location in the Nation MUMMY R. EDElMAN VICE PRESIDEf;T NUCUAR Mr. James G. Keppler Regional Administrator, Region III Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137 RE:
Perry Nuclear Power Plant Docket Nos. 50-440; 50-441 Significant Deficiency Concerning Anchor Darling Globe Valves (RDC 88(84))
Dear Mr. Keppler:
As stated in our letter to you dated January 27, 1984, the corrective action taken to correct a defect in the antirotational setscrew on four Anchor Darling Globe Valves was to be completed for all affected valves by September 15, 1984.
While repairing the remaining two valves, it was discovered that replacement valve stem keys supplied by Anchor Darling for use in these two valves were oversized.
As a result, the stem collar could not be placed on the valve, delaying implementation of our corrective action.
It is now anticipated that the corrective action for all valves will be completed by October 26, 1984.
Pl' ease contact us if you have any question.-
Sincerel,
y r. //$
g Murray R. Edelman Vice President Nuclear Group MRE:pab cc:
Mr. J. A. Grobe NRC Site Office Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D.C.
20555 U.S. Nuclear Regulatory Commission c/o Document Management Branch Washington, D.C.
20555 Records Center, SEE-IN Institute of Nuclear Power Operations 00T y a pg4 1100 circle 75 Parkway, Suite 1500 Atlanta, Georgia 30339 8410260179 841008 PDR ADOCK 05000440 77 Ecp 7 BRR