Interim Deficiency Rept DER 84-42 Re Replacement of Environmentally Qualified Torgue Switches W/Unqualified Torque Switches.Due to Extensive Investigation & Evaluation, Final Rept Delayed Until 841030
ML20106D845
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 10/11/1984
From: Van Brunt E
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
References
ANPP-30795-TDS, DER-84-42, NUDOCS 8410260193
Download: ML20106D845 (2)


Text

_

~

HECEP/E0 C

Arizona Public Service Company

% CCT IE F? I: 97 October 11,S'NIS"'

9 ANFP-30795-TDS /TRB U. S. Nuclear Regulatory Commission Region V Creekside Oaks Office Park 1450 Maria Lane - Suite 210 Walnut Creek, California 94596-5368' Attention: Mr. T. W. Bishop, Director Division of Resident Reactor Projects and Engineering Programs

Subject:

Time Extension For Report - DER 84-42 A 50.55(e) Potentially Reportable Deficiency Relating To Environmentally Qualified Torque Switches Were Replaced With Unqualified Torque Switches.

File: 84-019-026; D.4.33.2 Ref erence: ( A) Telephone conversation between J. Ball and T. Bradish on June 18, 1984 (B) ANPP-29993, dated July 18,1984 (Interim Report)

(C) ANPP-30276, dated August 20,1984 (Time Extencion)

(D) ANPP-30481, dated September 11, 1984 (Time Extension)

Dear Sir:

The NRC was notified of a potentially reportable deficiency in Ref erence ( A), an Interim Report was transmitted by Ref erence (B),

and Time Extensions were requested by References (C) and (D). At that time, it was estimated that a Final Report would be available by Oc tober 12, 1984 Due to the extensive investigation and evaluation required, it is now expected that this information will be finalized by October 30, 1984, at which time a complete report will be submitted.

There is no new information or change to the Interim Report at this time.

Very truly y urs, O_(_

CQ 0410260193 841011 E. E. Van B runt, J r.

PDR ADOCK 05000528 APS Vice President g

PDR Nuclear Production ANPP Project Director EEVB/TRB/nj cc: See Page Two i

c ZEv7

Mr. T. W. Bishop DER 84-42 Page Two cet Richard DeYoung, Director Office of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C.

20555 T. C. Woods, Jr.

D. B. Karner W. E. Ide D. B. Fasnacht A. C. Rogers L. A. Souza D. E. Fowler T. D. Shriver C. N. Russo J. Vorees J. R. Bynum J. M. Allen A. C. Gehr W. J. Stubbleffeld W. C. Bingham R. L. Patterson R. W. Welcher

11. D. Foster D. R. Itavkinson R. P. Zinsnerman L. Clyde M. Woods T. J. Bloom Records Center Institute of Nuclear Power Operations 1100 circle 75 Parkway, Suite 1500 Atlanta, CA 30339 h

]