Proposed TS 15.3.10 Re Control Rod & Power Distribution Limits & TS Table 15.3.5-5, Instrument Operating Conditions for Indications
ML20106D789
Person / Time
Site: Point Beach  
Issue date: 10/06/1992
From:
WISCONSIN ELECTRIC POWER CO.
To:
Shared Package
ML20106D787 List:
References
NUDOCS 9210140305
Download: ML20106D789 (9)


Text

.

.~

i TABLE 15.3.5-5 INSTRUMENT OPERATING CONDITIONS FOR INDICATIONS 1

2 3

MINIMUM NO. OF OPERABLE OPERATOR ACTION IF CONDITIONS NO. FUNCTIONAL UNIT CHANNELS

((iANNELS OF COLUMN 2 CANNOT BE MET 1.

PORY Position Indicator 1/ Valve 1/ Valve If the operability of the PORY position indicator cannot be restored within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, shut the associated PORV Block Valve.

2.

PORY 8?ock Valve Position 1/ Valve 1/ Valve If the operability of the PORV Block Valve Position l

Indicator cannot tm restored within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, shut and Indicator verify the Block Valve shut by direct observation or declare the Block Valve inoperable.

3.

Safety Valve Position Indicator 1/ Valve 1/ Valve If the operability of the Safety Valve Position Indicator cannot be restored within seven days, he in at least Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

4.

Reactor Coolant System Subcooling 1

1 If the operability of a subcooling monitor cannot be restored or a backup monitor made fur.ctional within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, be in at least Hot Shutdown within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

5.

Auxiliary Feedwater Flow Rate

  • 1 1

If the cperability of the auxiliary feedwater flow rate indicator cannot be restored within 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br />, be in hot shutdown within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br />.

l 6.

Contro Rod Misalignment as 1

1 Log individual rod positions once/hr., after a load change >10% or after >30 inches,8!(yeij of control 4

l Monitored by On-Lino rod motion, l

Computer

f Unit 1 - Amendment 55 September 30, 1981 Unit 2 - Amendment 60 9210140305 921006 PDR ADOCK 05000266 PDR p