Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20101H977 + (ML20101H977)
- ML20101H983 + (ML20101H983)
- B15604, Submits Changes to & Errors in ECCS Evaluation Model/ Applications of Model for Unit 2 + (ML20101H991)
- NSD-NRC-96-4673, Forwards Response to NRC RAI 440.515 (Rev 1) Re Notrump Computer Code + (ML20101H993)
- ML20101H996 + (ML20101H996)
- ULNRC-03352, Responds to NRC 960307 RAI Re Temp of SFP After Full Core Offload Assuming Both Trains of Sfpc Area in Operation,In Ref to 950906 Request for Rev to TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re SFP Storage + (ML20101H998)
- 05000336/LER-1996-008, :on 960222,concluded That Condition of Wire Mesh Screen Encl Over Two Containment Recirculation Suction Pipes Outside Design Basis.Caused by Const/Installation Error.Screen Encl Being Replaced + (ML20101J003)
- 05000336/LER-1996-010, :on 960222,identified That Containment Hydrogen Monitor Flow Could Not Be Established W/Containment at Atmospheric Pressure Due to Improper Setting of Sys Pressure Regulators.Sys Calib Procedure Will Be Revised + (ML20101J012)
- ML20101J014 + (ML20101J014)
- 05000336/LER-1996-011-01, :on 960222,required Time to Enter Mode 5 Exceeded.Caused by Effective Action Not Being Initiated to Revise SDC & Cooldown Rate Monitoring Procedures.Operating & Surveillance Procedures Will Be Revised + (ML20101J019)
- NRC-96-0036, Forwards Relief Request VR-61 for IST Program for Pumps & Valves to Implement Test Frequencies Consistent w/10CFR50, App J,Option B + (ML20101J025)
- ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled + (ML20101J028)
- ML20101J038 + (ML20101J038)
- ML20101J046 + (ML20101J046)
- ML20101J051 + (ML20101J051)
- ML20101J059 + (ML20101J059)
- 3F0396-14, Forwards Response to NRC Re Violations Noted in Insp Rept 50-302/95-21.Corrective Actions:Permanent Mods Have Been Installed That Added Isolation Relays Between RM-1A Non Safety Signal + (ML20101J060)
- ML20101J066 + (ML20101J066)
- 05000354/LER-1995-042, :on 951212,fuel Bundle Was Confirmed to Be Misoriented During Operating Cycle.Caused by Less than Adequate Procedural & Human Factor Controls Being Established.Revised Procedures + (ML20101J070)
- ML20101J071 + (ML20101J071)
- ML20101J076 + (ML20101J076)
- ML20101J081 + (ML20101J081)
- 05000361/LER-1996-001-02, :on 960205,waste Gas Sys H Monitor Was Declared Inoperable.Caused by Blown Fuse.Replaced Blown Fused & Performed Channel Calibr + (ML20101J105)
- ML20101J109 + (ML20101J109)
- ML20101J123 + (ML20101J123)
- ML20101J144 + (ML20101J144)
- ML20101J152 + (ML20101J152)
- ML20101J156 + (ML20101J156)
- ML20101J163 + (ML20101J163)
- ML20101J173 + (ML20101J173)
- ML20101J175 + (ML20101J175)
- ML20101J178 + (ML20101J178)
- ML20101J187 + (ML20101J187)
- ML20101J193 + (ML20101J193)
- ML20101J198 + (ML20101J198)
- ML20101J209 + (ML20101J209)
- ML20101J215 + (ML20101J215)
- ML20101J219 + (ML20101J219)
- ML20101J231 + (ML20101J231)
- ML20101J241 + (ML20101J241)
- ML20101J247 + (ML20101J247)
- ML20101J250 + (ML20101J250)
- ML20101J259 + (ML20101J259)
- 05000271/LER-1996-005, :on 960227,Group 6 Isolation for HPCI Sys Inadvertently Degraded Without Taking Actions Included by Ts.Caused by Personnel Error.Plant Processes Involved W/ Design Change Preparation Reviewed + (ML20101J279)
- ML20101J291 + (ML20101J291)
- ML20101J335 + (ML20101J335)
- ML20101J339 + (ML20101J339)
- ML20101J341 + (ML20101J341)
- ML20101J347 + (ML20101J347)
- ST-HL-AE-5324, Forwards Response to Emergency Preparedness Program Weakness Identified During NRC Insp Repts 50-498/96-13 & 50-499/96-13.Corrective Actions:Condition Rept 96-2626 Written to Address Weakness Incurred During Insp + (ML20101J381)
- ML20101J387 + (ML20101J387)