Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20100L850 + (ML20100L850)
- ML20100L855 + (ML20100L855)
- ML20100L863 + (ML20100L863)
- 2CAN029606, Forwards 1995 Primary Coolant I-131 Dose Equivalent Activity Rept,Providing Results of Activity Analysis in Which Primary Coolant Exceeded Limits of TS 3.4.8 on 950107 & 0901 + (ML20100L867)
- ML20100L869 + (ML20100L869)
- ML20100L872 + (ML20100L872)
- ML20100L873 + (ML20100L873)
- ML20100L876 + (ML20100L876)
- ML20100L877 + (ML20100L877)
- ML20100L880 + (ML20100L880)
- ML20100L886 + (ML20100L886)
- ML20100L889 + (ML20100L889)
- ML20100L896 + (ML20100L896)
- ML20100L897 + (ML20100L897)
- ML20100L900 + (ML20100L900)
- ML20100L904 + (ML20100L904)
- ML20100L905 + (ML20100L905)
- ML20100L909 + (ML20100L909)
- ML20100L913 + (ML20100L913)
- ML20100L918 + (ML20100L918)
- ML20100L925 + (ML20100L925)
- ML20100L927 + (ML20100L927)
- ML20100L931 + (ML20100L931)
- ML20100L937 + (ML20100L937)
- PLA-2361, Forwards Description of Events & Actions for Resolution of Scram Pilot Solenoid Valve Concerns,Results of Evaluation of Scram Pilot Valves by Franklin Research Ctr & Description of Surveillance Program for Valves,In Response to + (ML20100L938)
- ML20100L939 + (ML20100L939)
- RBG-19601, Forwards 412 Oversize Drawings Providing Final Closeout of Confirmatory Items 21,29,32,36,37 & 38 & Partial Close Out of Items 24 & 43,per Instrumentation & Control Sys Branch Request.Aperture Cards Available in PDR + (ML20100L943)
- ML20100L956 + (ML20100L956)
- ST-HL-AE-1195, Revised Final Deficiency Rept Re Cable Tray Hanger Design. Initially Reported on 801205.All Affected Supports & Hangers Replaced W/New Design Using Cold Formed Strut.Bechtel Evaluation Confirms Supports Acceptable + (ML20100L959)
- ML20100L961 + (ML20100L961)
- ML20100L981 + (ML20100L981)
- ML20100L985 + (ML20100L985)
- ML20100L993 + (ML20100L993)
- ML20100M002 + (ML20100M002)
- ML20100M010 + (ML20100M010)
- ML20100M019 + (ML20100M019)
- ML20100M030 + (ML20100M030)
- 2CAN118405, Monthly Operating Rept for Oct 1984 + (ML20100M035)
- ML20100M045 + (ML20100M045)
- ML20100M047 + (ML20100M047)
- ML20100M054 + (ML20100M054)
- RBG-20506, Interim Deficiency Rept DR-286 Re Polarity Pins on Twinax Module Connectors in Containment Electrical Penetrations Supplied by Conax Corp.Interim or Final Status Rept Will Be Provided by 850411 + (ML20100M066)
- RBG-20558, Interim Deficiency Rept DR-281 Re Defective Bearing Support in Concrete Pads for Charcoal Filter Units Supplied by American Air Filter.Final or Interim Status Rept Will Be Provided by 850412 + (ML20100M073)
- ML20100M078 + (ML20100M078)
- RBG-20550, Final Deficiency Rept DR-217 Re Defective Bolting Matl Supplied by Cardinal Industrial Products Corp.Initially Reported on 850222.Item Not Reportable Under 10CFR50.55(e) + (ML20100M095)
- ST-HL-AE-1211, Fifth Interim Deficiency Rept Re Corrosion in Safety Injection Sys Weld.Initially Reported on 831020.Welds in Safety Injection & Containment Spray Piping Sys Will Be Cut Out & Replaced W/Pup Piece.Next Rept by 850830 + (ML20100M102)
- 05000324/LER-1985-003-03, :on 850310,unexpected Primary Containment Group 1 Isolation Occurred During Response Time Testing of Main Turbine Stop Valves.Periodic Test PT-45.1.6-2 & Corresponding Response Time Test Revised + (ML20100M108)
- TXX-4281, Forwards Table Providing Description of 840827 Amend 52 to FSAR + (ML20100M112)
- ST-HL-AE-1215, Final Part 21/deficiency Rept Re Capacitor Terminations in GE ferro-resonant Transformers in Westinghouse 7.5 Kva Inverters.Initially Reported on 840914.Fast-on Terminals Will Be Cut Off & Wire to Solder Lug Will Be Soldered + (ML20100M124)
- ML20100M126 + (ML20100M126)
- ML20100M127 + (ML20100M127)