Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20095E957 + (ML20095E957)
- ML20095E960 + (ML20095E960)
- ML20095E962 + (ML20095E962)
- TXX-4278, Forwards Response to NRC 840613 Questions Re Reactor Vessel Heatup & Cooldown Tech Specs + (ML20095E966)
- TXX-4282, Requests Exemption from Section III.D.2.b.ii of App J to 10CFR50 Requiring Leakage Testing of Airlock.Overall Airlock Leakage Rate Will Be Measured Every 6 Months Regardless of Airlock Operating or Maint History + (ML20095E968)
- ST-HL-AE-5249, Forwards Four Copies of Rev 1A to Plant Safeguards Contingency Plan.Encl Withheld + (ML20095E971)
- RBG-36-751, Revises 911025 Response to Final Rule on Emergency Response Data Sys (ERDS) & Forwards ERDS Data Point Library for Facility + (ML20095E972)
- ML20095E973 + (ML20095E973)
- 05000321/LER-1992-008, :on 920324,discovered That Weekly Representative Sample of Particulates in Main Stack Effluent Not Collected.Caused by Personnel Error.Technician Counseled & Standing Order Issued + (ML20095E975)
- 05000255/LER-1984-012, :on 840725,unidentified Primary Coolant Sys (AB) Leakage Greater than 1gpm Discovered.Caused by Leakage Past Loopcheck Valves Into Safety Injection Lines.Check Valves Flushed to Facilitate Improved Seating + (ML20095E981)
- 05000255/LER-1984-011, :on 840719,while Technicians Calibr Containment Pressure Switches,Two Spurious Containment High Pressure Signals Generated Resulting in ESF Actuations.Caused by Personnel Error + (ML20095E982)
- TXX-4275, Informs That Steam Generator Tube Rupture Reevaluation Will Include Calculations to Determine Margin to Overfill & Equilibrium Breakflow Showing Time to Overfill Is Greater than Time to Equalization,Per NRC 840409 Request + (ML20095E983)
- ML20095E985 + (ML20095E985)
- ML20095E986 + (ML20095E986)
- ML20095E987 + (ML20095E987)
- ML20095E990 + (ML20095E990)
- ML20095E997 + (ML20095E997)
- NG-95-3516, Monthly Operating Rept for Nov 1995 for Duane Arnold Energy Ctr + (ML20095E998)
- ML20095F006 + (ML20095F006)
- ML20095F007 + (ML20095F007)
- ML20095F014 + (ML20095F014)
- ML20095F015 + (ML20095F015)
- 05000333/LER-1984-017, :on 840720,remote Alarm Function for East Cable Tunnel Smoke Detection Sys Declared Inoperable.Hourly Patrolling Fire Watch Initiated,But Not Performed for 2 H Period.Disciplinary Action Administered + (ML20095F016)
- ML20095F019 + (ML20095F019)
- ML20095F025 + (ML20095F025)
- ML20095F027 + (ML20095F027)
- ML20095F032 + (ML20095F032)
- ML20095F033 + (ML20095F033)
- ML20095F040 + (ML20095F040)
- ML20095F041 + (ML20095F041)
- ML20095F044 + (ML20095F044)
- ML20095F046 + (ML20095F046)
- ML20095F048 + (ML20095F048)
- ML20095F062 + (ML20095F062)
- ML20095F065 + (ML20095F065)
- ML20095F067 + (ML20095F067)
- ML20095F070 + (ML20095F070)
- ML20095F076 + (ML20095F076)
- ML20095F082 + (ML20095F082)
- ML20095F093 + (ML20095F093)
- NG-95-3533, Forwards Corrected Page 8-2 as Well as Page 8-1 & Page 36 of App B from DAEC USI A-46 Seismic Evaluation Rept (Previously Submitted as Attachment 1 to Util ) + (ML20095F097)
- ML20095F106 + (ML20095F106)
- ML20095F107 + (ML20095F107)
- ML20095F109 + (ML20095F109)
- ML20095F110 + (ML20095F110)
- ML20095F114 + (ML20095F114)
- ML20095F136 + (ML20095F136)
- ML20095F142 + (ML20095F142)
- PY-CEI-NRR-1998, Forwards Addl Info Re Changes in Administrative Controls for Procedures & Instructions,Requested by Util ,In Response to F Maura of Nrc,Rai During Telcon W/Kr Pech + (ML20095F169)
- 05000289/LER-1984-005-01, :on 840716,diesel Generator Differential Relays Discovered Potentially Incapable of Withstanding Seismic Event.Caused by Improper Application of Relays in Original Plant Design.Relays Will Be Replaced + (ML20095F177)
- ML20095F188 + (ML20095F188)