Forwards Annual Update of Integrated Schedule ABC Projects Listing for Long Range Planning Program
ML20095F109
Person / Time
Site: Oyster Creek
Issue date: 12/13/1995
From: Long R
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
6000-95-2810, C321-95-2333, NUDOCS 9512180284
Download: ML20095F109 (17)


Text

_ _

t GPU Nuclear Corporation One Upper Pond Road g

gg Parsippany. New Jersey 07054 i

201 316-7000 TELEX 136-482 Writers Direct Dial Number

)

December 13, 1995 6000-95-2810 C321-95-2333 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555 Gentlemen:

Subject:

Oyster Creek Nuclear Generating Station (OCNGS)

Docket No. 50-219/ License No. DPR 16 Long Range Planning Program (LRPP)

Annual Update of Integrated Schedule "ABC" Projects Listing Pursuant to condition 2.C.(10) of Operating License DPR-16, GPU Nuclear has implemented the Long Range Planning Program for OCNGS. As required by Section V.A of the Plan, the following attachments are submitted to provide the annual project list update:

1.

Attachment A contains a new project list of Category A, B and C projects, annotated by an asterisk (*) to identify new projects. Completed projects have been removed from the schedule listing. Also noted by a double astensk (**) are budget activity numbering changes.

2.

Attachment B contains a summary of Category A, B, and C projects which have been completed, deleted, deferred, changed in scope. Category A and B projects which have had schedule changes are provided with explanations, as appropriate.

1SCidU 9512180284 951213 PDR ADOCK 05000219 P

PDR.

l GPU Nuclear Corporation is a subsidiary of General Pubic Ut:lities Corporation I

g

4 D'ecember 13, 1995 6000-95-2810 C321-95-2333 Page 2 Pursuant to the LRPP for Oyster Creek, it will be assumed that you are in agreement with the actual Category B changes above if you do not respond to this submittal within 15 days of receipt.

Sincerely, i

f R. L. Long Vice President and Director Services Division i

RLUGMG/ pip cc:

Director, Project Directorate I-4 Oyster Creek NRC Project Manager Region I, Administrator Senior NRC Resident Inspector, OCNGS

5.d-9a SJs s h d ek.at-e h-2 -,4 4 E s-em. e-u #,

d+h4.s e4 e.es

% d e p-do_ Aw e f-e.34..we.4E-mad.e44 e-s am-4-h>

7 m e e ex.J4-Mwa eEarms-e mm.*

m.-..nma mwum-,-ass..e,4..

.ee m sam

.,msns,p.a.masam._w.e.a.-awaar, i

4 e

l 4

4 I

i l

1 ATTACMENT A 4

PROJECT LISTIM INTEGRATED SCHEDULE AMUAL UPDATE (DECEM8ER1995)

I l

j i

J i

1 1

J d

i i

OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE t

.NEW PR W E

    • BA NUMBER CHANGE CATEGORY

'A' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/12/1995 f

OBS BA DESCRIPTION CYCLE /

CL.SSIFICATION NUMBER YEARS 1 409791 SECURITY INTRUSION PROTECTION UPGRADE 15 NRR l

UPGRADE THE SECURITY SYSTEM AS A RESULT OF THE TMI-1 INTRUSION I

i L

I r

1 4

m

OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE e

CATEGORf

'B' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 2 328030 CNTL RM HUMAN FACTORS DESGN REVIEW 14/15 NRR CR REPAINT, REFURBISH & RELABEL CR PANELS l

1R THRU 10R,6XR,11XR,12R,12XR,14R,14XR, 16R AND llF,9XR&llR.NUREG 0737 SUP 1.

3 328226 SOUG PROGRAM IMPLEMENTATION 14/15 hPR r

ESTABLISH SEISMIC QUALIFICATION FOR i

OYSTER CREEK. SCOPE INCLUDES FJLLKDOWNS IN OUTAGE ISR AND EVALUATIONS 16R OUTAGE ISI & RCS AUGMENTED ICSCC INS 16R NRR 4 328393 INSPECT HANGERS, PIPING WELD, &

COMPONENTS PER SECTION XI, AND NUP.EG 0313 t'

5 32XAHE RCS AUG-ICSCC INSPECTION - 17R 17R NRR RB Did INSPECT PIPING WELDS PER NUFEG 0313 REV2 6 32XAME RCS AUG-IGSCC INSPECTION - ISR 18R NRR i

{

RB DW INSPECT PIPING WELDS PER NUR?C 0313 REV2 e

7 326216 RX. VESSEL BELTLINE INSPECTION 18R NRR 119 UT ACCESSIBLE WELD SEA _E IN THE RPV BELTLINE REGION. INSPECTIONS WILL BE DONE RMOTELY. ASME SECT. XI RLV;IREMENTS t

OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS SPENT FUEL TRANS TO INTERIM STORAGE 15 MRC 8 312000 TRANSFER SPENT FUEL FFOM FUEL POOL TO DRY STORAGE FACILITY l

9 323704 VALVE RELIABILITY MAIFTENANCE 15 MRC RB TB DW j

CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES f

10 402680 OC SPENT FUEL STORAGE CAPACITY EXPANSION 15 ORR INSTALL PERIMETER INTRUSION DETECTION SYSTEM (PIDS) AND NUOHMES VAULTS ON PAD 11 403036 SPENT FUEL CASK HANDLING UPGRADES 15 ISM RB PERFORM VARIOUS MODIFICATIONS TO THE 119 OVERHEAD CRANE TO PERMIT THE TRANSFER OF SPENT FUEL TO DRY STORAGE REMOVE HIGH RECIRC FIDW SCRAM FUNCTION ISU REL 12 403063 MODIFY RECIRC FIDW MONITORING. SYSTEM TRIP STATUS AND RESET MODULES IN CONTROL ROOM PANELS 3R & SR PLUS WIRING CHANGES 13 312600 VALVE RELIABILITY & MAINTENANCE-16R 16R MRC PERFORM CORRECTIVE AND PREDIC"IVE MAINT ON SELECTED VALVES, OPEN & INSP. CHECK VALVES, PERFORM CM ON VLVES FAILING LLRT 14 312600 CRD HCU REBUILD - 16R 16R MRC i

REBUILD HYDRAULIC CONTPOL UNI *$

OYSTEE CREEK PROJECT LISTING t

LEGEND NRC INTEGRATED SCHEDULE

~

NEW PROJECTS

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 15 32F245 DRYWELL SCAFFOLD & INSULATIOD 16R Ght DW RB23 YARD INSTALL SCAFFOLD IN THE D.W. TO SUPPORT ALL ACTIVITIES. REMOVE / REINSTALL SCAFFOLD. REMOVE / REINSTALL INSULATION 16R TURBINE OVERHAUL PRCATECT 16R MRC 16 323747 TOF TBB CBAY IDS INSP, #4 SV&CV, #2645 CRV, CONTROL SYST. TUNEUP, MS AND RHTR INSP, PERFORM MINOR INSP/REPRS, REPLACE LP-C REFUEL FIDOR RX DISASSEMBLY /PIASSEMBLY 16R MRC 17 323748 119' TASKS ASSOCIATED WITH REACTOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES 18 328381 PIPE WALL THINNING-16R SCOPE DEVELOPMENT 16R ISM REMOVE INSULATION, PFEP SURFACES &

PERFORM UT ON SELECTE.D PIPING SYSTEMS.

POSSIBLE REPLACEMENT OF FITTINGS /PIPIhT.

i 19 328382 RX. VESSEL INTERNAL INSPECTION - 16R 16R NRR VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFAi2S AS REQUIRED BY ASME CODES EDG UNIQUE MAINTENANCE 16R MRC 20 328383 DGB FOR EDG-1 & EDG-2 BATTERY DISCHARGE TEST FAN BLADES. BEARINGS: AND ARMS, INSTALL REPLACEMENT RELAYS 6. PLENUM DRAINS.

21 402821 RX RECIRC PUMP & MOiOR VIBRATION MONITRS 16R MRC DW RB COMPLETE WIRING INSTALLATION INSIDE DRYWELL AND INSTALL CABLE AhT DATA COLLECTION SYSTEM OUTSIDE THE DRYWELL

I 1

l l

OYSTER CREEK PROJECT LISTING l

LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS

    • 'BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 12/12/1995 SORT BY CATEGORY / CYCLE /BA OBS BA DESCRIPTION CYCLE /

CIASSIFICATION YEARS NUMBER 22 403024 SQUG MODS 16R NRR 4

ALL IMPLEMENT MOCS RESULTING FROM SQUG WALKDOWN IN ISR.

UFCRADE MSIV LIMIT u,.. OIES 16R REL 23 403053 MODIFY AND REPLACE THE MSIV LIMIT SWITCHES TO IMPROVE RELIABILITY.

DEAERATING STEAM SYSTEM RETIREMENT 16R HRP 24 403060 CBAY CR TBB CUT & WELC CAPS IN THE DEAERATING STEAM LINE AT SEVEN IOCATIONS. THIS WILL hEQUIRE 1-6", 3-8" AND 3-1* CAPS WELDED 25 403075 LP-C REPIACEMENT TURBINE ROTOR 16R MRC TOF TB PROCURE NEW LP-C TURBINE ROTOR AND PERFORM MINCR MODIFICATIONS AS hTCESSARY GENERIC LETTER 89-10 16R MODIFICATIONS 16R ISM 26 403079 INSTALL MODS TO ENHANCE MOV CAPABILITY 27 408957 VALVE REPLACEMENT / RETIREMENT-16R 16R REL RB TB CBAY DG REPIJ.CE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENC I.S INCLUDING 2 EMRVS &

2 SRvS. REINSTAl7 REFURBISHED VALVES I

28 312000 SPENT FUEL TRANS TO INTERIM STORAGE 17 MRC TR7NSFER SPENT FUEL FROM FUEL POOL TO I

DRY STORAGE FACILITY L

r

I OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PRCLTECTS

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS STATUS AS OF 12/12/1995 SORT BY CATEGORY / CYCLE /BA OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS VALVE RELIABILITY & MAINTENANCE-17R 17R MRC 29 312600 PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES CRD HCU REBUILD - 17R 17R MRC 30 312600 REBUILD HYDRAULIC CONTROL UNITS 31 32XAHD RX. VESSEL INTERNAL INSPECTION -17R 17R NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 32 323LO3 TURBINE INSP.-17R 17R MRC TB INSPECT MISCELLANEOUS TURBINE RELATED COMPONENTS FOR NML REQUIREMEh"PS AND MANUF. SUGGESTION REFUEL FIDOR RX DISASSEMELY/ REASSEMBLY 17R MRC 33 323748 119' TASKS ASSOCIATED WITH REACIOR DISASSEMBLY AND REASSEMBLY AND SUPPORTING ACTIVITIES 34 326L15 DRWTJL SCAFFOLDING & INSULATION-17R 17R GWC DW INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.

INSULATION. REMOVE SCAFFOLD 35 32696G OUTAGE ISI 17R NRR ALL INSPECT HANGERS, PIPING WELD,&

COMPONENTS TO SATISFY SECTION XI REQUIREMENTS

= _ _ = -.

__ _ = _ _ _ - _ _.

1 OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGRATED SCHEDULE NEW PROJECTS

    • BA NUMBER CHANCE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STAIUS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 36 328378 PIPE WALL THINNING - 17R 17R ISM REMOVE INSULATION, PREP SURFACES &

PERFORM UT ON SELECTED PIPING SYSTEMS, POSSIBLE REPLACEMENT OF FITTINGS / PIPING 37 408957 VALVE REPLACEMENT / RETIREMENT-17R 17R REL RB TB CBAY DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES 38 312600 VALVE RELIABILITY & MAINTENANCE-18R 18R MRC PERFORM CORRECTIVE AND PREDICTIVE MAINT ON SELECTED VALVES CRD HCU REBUILD - 18R 18R MRC 39 312600 REBUILD HYDRAULIC CONTROL UNITS 40 32XAHD RX. VESSEL INTERNAL INSPECTION -18R 18R NRR 119 VISUAL INSPECTION OF SELECTED INTERNAL COMPONENTS AND SURFACES AS REQUIRED BY ASME CODES 41 323LO3 TURBINE INSP.-18R 18R MRC TB INSPECT HP AND LPA AND OTHER TURBINE RELATED COMPONENTS FOR NML NML REQUIPEMENTS AND MANUF. SUGGESTION I

42 323748 REFUEL FIDOR RX DISASSEMBLY / REASSEMBLY 18R MRC 119' TASKS ASSOCIATED WITH REACTOR I

DISASSEMBLY AND REASSEMBLY AFD

]

SUPPORTING ACTIVITIES i

OYSTER CREEK PROJECT LISTING LEGEND NRC INTEGbATED SCHEDULE NEW PROS W

    • BA NUMBER CHANGE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STATUS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION NUMBER YEARS 43 326L15 DRYWELL SCAFFOLDING & INSULATION-18R 18R GWC DW INSTALL SCAFFOLD IN D.W. TO SUPPORT ALL ACTIVITIES. REMOVE & REINSTALL D.W.

INSULATION. REMOVE SCAFFOLD 44 32696G OUTAGE ISI 18R NRR ALL INSPECT MANGERS, PIPING WELD,&

COMPOhTNTS 'IO SATISFY SECTION XI REQUIREMENTS PIPE WALL THINNING - 18R 18R ISM 45 328378 REMOVE INSULATION, PREP SURFACES &

PERFORM UT ON SELECTED PIPING SYSTEMS.

POSSIBLE REPLACEMENT OF FITTINGS / PIPING VALVE REPLACEMENT / RETIREMENT-18R 18R REL 46 408957 RB TB CBAY DW REPLACE SELECTED VALVES IDENTIFIED AS HAVING DEFICIENCIES 47 402980 CONFIGURATION MANAGEMENT-DBD 92-2000 92-00 ISM

{

DEVEIDPMENT OF OC SYSTEM DESIGN BASES 48 328148 0.C. PLANT LIFE ASSURANCE & EXTENSION 92-95 REL DEVEIOP 3-PHASE PLEX PLAN. PHASE 1 TO DETERMINE FEASIBILITY AND COST /

j ANALYSIS FOR LIFE CYCLE MANAGEMENT.

]

49 402982 INDIVIDUAL PLANT EXAM. - EXTERNAL EVENTS 92-95 NRP 1

PERFORM IPE ANALYSIS OF EXTERNAL EVENTS FOR SEVERE ACCIDENT VULNERABILITIES BY 6/30/95, BUT NO LATER THAN 12/22/95 l

l

OYSTER CREEK PROJECT LISTING I.EGEND NRC INTECRATED SCHEDULE

~

NEW PROJECTS

    • BA h%HEER CHANGE CATEGORY

'C' PROJECTS SORT BY CATEGORY / CYCLE /BA STAWS AS OF 12/12/1995 OBS BA DESCRIPTION CYCLE /

CLASSIFICATION h%'MBER YEARS 50 328370 VESSEL & INTERNALS PROJECT (BWR VIP) 94-96 NRR EVALUATE THE REACTOR AND INTERhALS FOR POTENTIAL CRACKING AND DEVEIDP METHODS FOR INSPECTION / MITIGATION / REPAIR 51 409280 REPLICA SINULATOR MODS 95 NRR UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLICABLE OYSTER CREEK LIFE ASSURANCE /LIC. RENEWAL 95-00 REL 52 328148 PHASE 2 - PREPARE LICENSE RENEWAL APPLICATION TO BE COMPLETED 1999/2000 53 40996D REPLICA SIMULATOR MODS 96-00 hPR UPGRADE THE SIMULATOR TO MATCH PLANT MODS AS APPLIC_2LE

ABC Classifications a)

Meet NRC Reauirements (NRR) - Activities that a) must be carried out to fulfill specific NRC requirements or b) have been committed to the NRC by the Company or c) are such that if not accomplished would result in an NRC non-compliance even though the specific activity is not required by the NRC.

b)

Meet Environmental Reauirements (ERR) - Activities that a) are specifically required by environmental regulatory agencies (State and Federal) or b) have been committed to envinnmental agencies by the Company or c) are such that if not accomplished would result in a regulatory non-compliance even though the specific activity is not required by an environmental regulatory agency.

c)

Meet Other Reauirements (ORR) - Activities not covered by the NRC or environmental requirements but that are required by local, state, or federal ordinances, codes, comt order or lawsuit settlement, or other guidance to which the Company is committed or if not accomplished would result in a violation of that ordinance, code or guidance, court order, etc.

d)

Increase Safety Margins (ISM) - Activities that, if implemented, will improve nuclear plant or personnel safety but are neither required for regulatory compliance nor required by safety regulations, codes or guidance.

e)

Decrease Environmental Effects (E) - Activities that, if implemented, will result in an improved environmental quality but are neither required for regulatory compliance nor required by environmental regulations, codes or guidance.

f)

Improve Radiological Conditions (RAD) - Activities that, if implemented, will result in improved radiological conditions, lower man-rem exposure rates, or radwaste control / reduction but are neither required for regulatory compliance nor required by j

radiological regulations, codes or guidance.

g)

Maintain Reliability / Capability (MRC) - Activities that, if implemented, will maintain power production at existing levels by preventing deterioration of plant systems or equipment. Includes activities in response to national codes and standards, insurance policies, equipment vendor specifications or nuclear industry high unavailability equipment data without which the plant could not operate prudently.

-l h)

Imorove Reliability / Capability (REL) - Activities that, if implemented, will increase power generation by improving availability or capacity factor to maximize energy output.

ABC Classifications (continued) i)

Improve Operational Effectiveness (IOE) - Activities that, if implemented, will improve staff efficiency or provide a direct economic payback in terms of reduced operating / maintenance costs.

j)

Improve Personnel Facilities (FAC) - Activities that, if implemented, will improve working conditions and the usefulness of personnel facilities, k)

Provide Contingency / Blanket (CUI) - Activities that, if implemented, will provide management flexibility to respond in a timely manner to emergent work requirements or the ongoing requirements to procure, replace or repair minor items essential to support routine operations.

1)

Improves Heat Rate Performance (HRP) - Activities, that, if implemented, will increase power production by enhancing the heat mte efficiency.

m)

General Working Conditions (GWC) - Activities, tools, and equipment that if implemented will improve working conditions, but will not demonstrate a direct economic payback.

O ATTACHNENT B OYSTER CREEK NUCLEAR GENERATING STATION NRC INTEGRATED SCHEDULE ANNUAL UPDATE CATEGORY "A" PROJECTS 1

COMPLETIONS:

None i

SCHEDULE CHANGES:

None i

i

~._-..... - -

l CATEGORY "B" PROJECTS i

i COMPLETIONS:

315302 SEP Topic III-1 328205 SQUG Support & Participation - BWROG 328312 MOV Program OTHER CHANGES:

328370 Vessel & Internals Proiect (BWR VIP)

This project is being changed from a Category "B" to Category "C" because the project does not meet the description of a Category "B"

project, i.e.,

no specific commitments have been made to the NRC by GPUN, as defined in the revised Long Range Planning Program approved by the NRC. However, any generic standards or criteria approved through the BWR VIP will become program commitments and will be reported in the ILS process.

328393 16R ISI & RCS Auamented IGSCC Insnection B/A number was ' changed from 32XAHE to 328393.

Also, the ISI scope nas been included within this activity.

SCHEDULE CHANGE:

326216 Reactor Vessel Beltline Insoection The schedule for reactor vessel beltline weld inspections has been changed fnm the 17R to 18R outage to permit more effective utilization of GPUN resources.

Improvements in inspection technology are expected as more plants perform the beltline inspections. The 18R outage is within the 10 year inspection interval, as allowed by ASME Section XI requirements.

_-. _ _.. _. ~. - _

i CATEGORY 'C' PROJECTS ADDITIONS:

As denoted by

  • next to the Project Title in Attachment A.

COMPLETIONS:

402880 OC Spent Fuel Storage Capacity Expansion, 93-95 402981 Accident Management Guidelines, 93-95 DELETIONS:

323Ll4 Asbestos Abatement 16R, 17R 402948 Low Pressure Turbine "C" Last Stage Blade Installation OTHER CHANGES: The following B/A numbers have been changed:

PREVIOUS NEW OBS J TITLE B/_A Bla 8

Spent Fuel Transfer to Interim Storage - Cyc 15 323727 312000 13 Valve Reliability & Maintenance - 16R 323L35 312600 14 CR0 HCU Rebuild - 16R 323L39 312600 15 Drywell Scaffolding & Insulation - 16R 326L15 32F245 16 16R Turbine Overhaul Project 323LO3 323747 17 Refuel Floor Reactor Disassembly / Reassembly-16R 323L52 323748 18 Pipe Wall Thinning - 16R Scope Development 32XAHA 328381 19 Reactor Vessel Internal Inspeccion - 16R 32XAHO 328382 27 Valve Replacement / Retirement - 16R 408L25 408957 28 Spent Fuel Transfer to Interin Storage - Cyc 17 323727 312000 29 Valve Reliability & Maintenance - 17R 323L35 312600 30 CRD HCU Rebuild - 17R 323L39 312600 33 Refuel Floor Reactor Disassembly /Reasser.bly-17R 323L52 323748 36 Pipe Wall Thinning - 17R 32XAHA 328378 l

37 Valve Replacement / Retirement - 17R 408L25 408957 38 Valve Reliability & Maintenance - 18R 323L35 312600 39 CR0 HCU Rebuild - 18R 323L39 312600 42 Refuel Floor Reactor Disassembly / Reassembly-18R 323L52 323748 45 Pipe Wall Thinning - 18R 32XAHA 328378 46 Valve Replacement / Retirement - 18R 408L25 408957 323LO8 Containment Isolation Valve Maint. - 16R.17R.18R This scope is included under 312600 - \\'41ve Reliability &

Maintenance.

32696G Outaae ISI - 16R This scope is included under the Category "B" project, 328393 -

16R Outage ISI and RCS Augmented IGSCC Inspections.

--.