ML20095E973
Jump to navigation
Jump to search
| ML20095E973 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 10/31/1995 |
| From: | DUKE POWER CO. |
| To: | |
| Shared Package | |
| ML20095E942 | List: |
| References | |
| NUDOCS 9512180226 | |
| Download: ML20095E973 (1) | |
Text
.-
4 o'
CATAWBA NUCLEAR STATION MONTHLY OPERATING STATUS REPORT october 1995 i
1.
Personnel Exposure -
l The total station 11guld release for October has been comt,ared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
The total station gaseous release for October has been compared with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.
1 i
i 1
)
9 4
9512180226 951212 PDR ADOCK 05000413 R
_PDR
,