- AECM-84-0404, Forwards Evaluation of High Energy Line Breaks & Consequential Control Sys Failures Described in IE Info Notice 79-22,in Response to Concerns in Sser 1 + (ML20093M695)
- ML20093M696 + (ML20093M696)
- ML20093M697 + (ML20093M697)
- PLA-2318, Special Rept:On 840703,lightning Struck & Automatically Deenergized Transmission Line to Startup Transformer, Resulting in Reactor Scram on Low Vessel Level + (ML20093M698)
- ML20093M700 + (ML20093M700)
- ML20093M704 + (ML20093M704)
- ML20093M710 + (ML20093M710)
- ML20093M712 + (ML20093M712)
- ML20093M716 + (ML20093M716)
- ML20093M720 + (ML20093M720)
- ML20093M727 + (ML20093M727)
- ML20093M735 + (ML20093M735)
- ML20093M737 + (ML20093M737)
- ML20093M742 + (ML20093M742)
- RBG-18225, Final Deficiency Rept DR-146 Re Multipole Circuit Breakers Mfg by I-T-E Electrical Products.Initially Reported on 840613.No Circuit Breakers Supplied Were Determined Defective.Condition Not Reportable Under 10CFR50.55(e) + (ML20093M743)
- ML20093M745 + (ML20093M745)
- ML20093M746 + (ML20093M746)
- ML20093M749 + (ML20093M749)
- ML20093M752 + (ML20093M752)
- ML20093M759 + (ML20093M759)
- ML20093M772 + (ML20093M772)
- ML20093M776 + (ML20093M776)
- ML20093M777 + (ML20093M777)
- ML20093M778 + (ML20093M778)
- ML20093M783 + (ML20093M783)
- ML20093M787 + (ML20093M787)
- ML20093M788 + (ML20093M788)
- ML20093M789 + (ML20093M789)
- ML20093M792 + (ML20093M792)
- ML20093M794 + (ML20093M794)
- ML20093M796 + (ML20093M796)
- JAFP-84-0950, Responds to NRC Re Violation Noted in Insp Rept 50-333/84-15.Corrective Action:Operating Shifts Will Be Trained as Part of Requalification Program,On Requirements of 10CFR50.72 + (ML20093M799)
- ML20093M804 + (ML20093M804)
- PLA-2329, Responds to NRC Re Violations Noted in Insp Rept 50-387/84-27.Corrective Actions:Emergency Response Training Completed on 840803 & Addl Retraining Identified Will Be Completed by 850331 + (ML20093M806)
- SNRC-1094, Forwards Detailed Info Re Test Duration,Strain Gauges,Test instrumentation,post-test Insp & Acceptance Criteria,Per Confirmatory Testing of Tdi Diesel Generators + (ML20093M812)
- ML20093M813 + (ML20093M813)
- ML20093M814 + (ML20093M814)
- ML20093M815 + (ML20093M815)
- ML20093M820 + (ML20093M820)
- ML20093M823 + (ML20093M823)
- ML20093M825 + (ML20093M825)
- ML20093M827 + (ML20093M827)
- ML20093M838 + (ML20093M838)
- 05000388/LER-1984-019-01, :on 840919,RHR Pump D Declared Inoperable Due to Failure to Start on Manual Initiation Signal on 840918. HPCI Sys Inoperable Due to Lube Oil Changeout.Rhr Problem Due to Misoperation of Relay Contacts + (ML20093M846)
- ML20093M850 + (ML20093M850)
- ML20093M861 + (ML20093M861)
- ML20093M864 + (ML20093M864)
- 05000293/LER-1984-013, :on 840920,indications of Cracking in Area of Weld Connecting Reactor Vessel Jet Pump Instrumentation Nozzle to Jet Pump Instrumentation Identified.Caused by Band of 304SS Matl in Weld Assembly.Weld Grinded + (ML20093M867)