ML20093M792

From kanterella
Jump to navigation Jump to search
Interim Deficiency Rept (55(e)-84-37) Re post-weld Heat Treatment Qualification of Feedwater Sys Angle Valves Mfg by Atwood & Morrill Co.Initially Reported on 840907. Investigation Incomplete.Next Rept by 850111
ML20093M792
Person / Time
Site: Nine Mile Point 
Issue date: 10/09/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
(55(E)-84-37), (NMP2L-0192), (NMP2L-192), (NMP2L-192)), NUDOCS 8410230295
Download: ML20093M792 (2)


Text

_

F...; [.;

NT NIAGARA UMOHAWK NIAGARA MOHAWK POWER CORPORATION /300 ERIE BOULEVARD WEST. SYRACUSE, N.Y.13202/ TELEPHONE (315) 474-1511 October 9, 1984 (NMP2L 0192)

Mr. - R. W. Starostecki, Director U.. S. Nuclear Regulatory Commission Region I

' Division of Project and-Resident Programs 631 Park Avenue.

King of Prussia, PA 19406 -

Re: Nine Mile Point - Unit 2 Docket No. 50-410

Dear Mr. Starostecki:

Enclosed is an ' interim report, _ in accordance with 10CFR50.55(e), for the problem concerning the post-weld heat treatment ' qualification of angle valves in the.feedwater system.

This ~ problem was reported via tel-con to S. Collins

~

oflyour _ staff on Septenber 7,1984 Very truly yours, C. V. Manga Vice President Nuclear Engineering and Licensing L

CVM/GG/pbd Director of Inspection and Enforcement xc:

L U.S.. Nuclear Regulatory Commission Washington, DC 20555

'R.' A. Granen, NRC ' Resident -Inspector Project File (2)

O i

8410230295 841009 PDR ADOCK 05000410 PDR g O g

i

. ~. - -,.. -

NIAGARA M0 HAWK POWER CORPORATION NINE MILE POINT - UNIT 2 DOCKET NO. 50-410 Interim Report for a Problem Concerning Post Weld Heat Treatment Qualification of Feedwater System Angle Valve:

(55(e)-84-37)

Description of the Problem

.The problem pertains to the Past Weld Heat Treatment qualification of angle valves, Mark Nos. 2FWS*HCV54A and B, in the feedwater system.

These are ASME Class 1 valves.

The certified material test' reports provided by the valve manufacturer, Atwood and Morrill Co. Inc., did not document the temperature of g

the simulated post weld ' heat treatment of the test coupons for-the valve bodies.

In

addition, the weld material post weld heat treatment qualification was performed for a. shorter duration than the production post weld heat treatment of the valve.

This condition has been documented on Nonconformance and Disposition Report No. ZO96..

L.

The matter is still under investigation and a final report will be ' submitted by January -11,1985 r:

L-i l

l l

4

._