Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- TXX-4317, Final Deficiency Rept SDAR-150 Re NSSS Auxiliary Relay Tracks Not Qualified Per IEEE-323-1974.Initially Reported on 840831.Matter Not Reportable Per 10CFR50.55(e) + (ML20093F666)
- ML20093F671 + (ML20093F671)
- ML20093F674 + (ML20093F674)
- ML20093F681 + (ML20093F681)
- 05000282/LER-1984-006-01, :on 840831,reactor Tripped During Startup. Caused by Steam Flow/Feedwater Flow Mismatch Indication. Faulty Feedwater Flow Transmitter & Regulating Valve to Be Replaced + (ML20093F683)
- ML20093F689 + (ML20093F689)
- ML20093F692 + (ML20093F692)
- ML20093F696 + (ML20093F696)
- ML20093F697 + (ML20093F697)
- ML20093F699 + (ML20093F699)
- ML20093F702 + (ML20093F702)
- RBG-18170, Final Deficiency Rept DR-172 Re Rupture of Jacket Water Shroud on Standby Tdi Diesel Generator During Flushing. Damaged Shroud to Be Repaired or Replaced Prior to Sys Turnover.Item Not Reportable Per 10CFR50.55(e) + (ML20093F705)
- L-95-270, Comment Supporting Proposed Rules 10CFR2,50 & 51 Re Decommission of NPPs + (ML20093F711)
- ML20093F713 + (ML20093F713)
- ML20093F714 + (ML20093F714)
- DCL-84-243, Forwards Response to Govt Accountability Project Allegations Contained in 840323,0412,0503 & 31 Ltrs.All Responses Verified & Prof Resumes of Verifiers Either Previously Submitted or Encl + (ML20093F721)
- ML20093F739 + (ML20093F739)
- 05000306/LER-1995-004-02, :on 950907,lockout of 2RY Transformer Resulted in auto-start of Number 22 CCW Pump.Caused by Ground Fault on B Phase Substation Terminal of Feeder Cable from 2RSY Transformer.Replaced All Substation Potheads + (ML20093F743)
- ML20093F747 + (ML20093F747)
- ML20093F749 + (ML20093F749)
- ML20093F753 + (ML20093F753)
- ML20093F754 + (ML20093F754)
- ML20093F755 + (ML20093F755)
- ML20093F759 + (ML20093F759)
- GO2-84-424, Responds to IE Bulletin 84-02, Failures of GE Type Hfa Relays in Use in Class IE Safety Sys. Plant Maint Procedure for Relay Coil Replacement & Contact Adjustment Revised to Prohibit Use of Hfa 51 Relays + (ML20093F761)
- ML20093F771 + (ML20093F771)
- ML20093F775 + (ML20093F775)
- PY-CEI-NRR-0119, Provides Updated Info Re Results of Mar 1984 Caseload Forecast Panel Visit,Basis for 1985 Completion Projection. Tdi Diesel Generator Requalification Program Underway.Mods Will Be Completed or Identified by End of 1984 + (ML20093F783)
- ML20093F784 + (ML20093F784)
- ML20093F792 + (ML20093F792)
- ML20093F794 + (ML20093F794)
- ML20093F806 + (ML20093F806)
- ML20093F820 + (ML20093F820)
- ML20093F827 + (ML20093F827)
- ML20093F829 + (ML20093F829)
- ML20093F831 + (ML20093F831)
- ST-HL-AE-1089, Final Deficiency Rept DER 84-003 Re ESF Load Sequencer Logic Design.Initially Reported on 840224.Design Will Be Revised to Inhibit Closure of Feeder Breaker & to Eliminate Restrip of First Load + (ML20093F833)
- ML20093F834 + (ML20093F834)
- ML20093F843 + (ML20093F843)
- NRC-84-0120, Forwards Westinghouse Proprietary Updated Justification for Interim Operation of Operator Interface Modules (ESE-12A). Info Part of Generic Qualification Program & Should Be Withheld (Ref 10CFR2.790) + (ML20093F847)
- ML20093F858 + (ML20093F858)
- ML20093F862 + (ML20093F862)
- ML20093F868 + (ML20093F868)
- ST-HL-AE-1131, Suppl to Final Part 21 & Deficiency Rept Re Snubber Assembly Rear Brackets Provided by NPS Industries,Inc. Encl Correspondence & Memo from Bracket Manufacturer Indicates Item Reportable Per Part 21 + (ML20093F874)
- ML20093F890 + (ML20093F890)
- ML20093F893 + (ML20093F893)
- LIC-95-0189, Forwards OPPD Fort Calhoun Station Decommissioning External Trust Fund Financial Statements & Independent Auditors Rept, for Period of 940701-950630 + (ML20093F905)
- ML20093F916 + (ML20093F916)
- ML20093F917 + (ML20093F917)
- ML20093F930 + (ML20093F930)
- ML20093F932 + (ML20093F932)