Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093E259 + (ML20093E259)
- ML20093E260 + (ML20093E260)
- ML20093E265 + (ML20093E265)
- ML20093E268 + (ML20093E268)
- ML20093E271 + (ML20093E271)
- ML20093E273 + (ML20093E273)
- ML20093E280 + (ML20093E280)
- ML20093E281 + (ML20093E281)
- BECO-84-169, Responds to NRC 840702 Request for Update to 760127 & 0604 Tech Spec Submittals.Ltrs Contained Lists of Primary Containment Isolation Valves Requiring Testing & Several Exemption Requests & Clarifications + (ML20093E282)
- ML20093E285 + (ML20093E285)
- ML20093E287 + (ML20093E287)
- ML20093E289 + (ML20093E289)
- ML20093E294 + (ML20093E294)
- ML20093E295 + (ML20093E295)
- ML20093E296 + (ML20093E296)
- ML20093E299 + (ML20093E299)
- 05000317/LER-1984-009, :on 840828,manual Trip Occurred.Caused by Loss of Circulating Water Due to Clogging of Four Traveling Water Screens W/Fish.Evaluation of Methods for Minimizing Clogging of Screens Underway + (ML20093E304)
- ML20093E309 + (ML20093E309)
- BSEP-95-0519, Responds to Violations Noted in Insp Repts 50-324/95-13 & 50-325/95-13.Corrective Actions:Permanent Mod Installed to Provide Isolated Power Supply to RCIC Flow Controller + (ML20093E311)
- BECO-84-168, Submits Revised Response to Generic Ltr 83-28,Item 2.2.1.4 Re Mgt Control.Qa Dept Surveillance Monitoring Function Strengthened & Need for Review of non-QA Documents Eliminated.Qa Manual Amended to Reflect Change + (ML20093E313)
- FVY-84-120, Submits Plans & Schedule for Completion of Equipment Classification Sys,Per Generic Ltr 83-28.Improvement of Info Handling Sys Used to Identify safety-related Components Planned + (ML20093E320)
- ML20093E322 + (ML20093E322)
- 05000249/LER-1984-013-05, :on 840830,reactor Operation Continued While Primary Containment Purge Sys Butterfly Valve 3-1601-63 Out of Svc for Air Leak Repair.Caused by Personnel Error. Outage Cleared & Valve Cycled + (ML20093E323)
- BSEP-95-0459, Advises of Util Revised Plans for Insp of Feedwater Nozzle Blend Radii.Rev 1 to NEDC-30633, Brunswick Steam Electric Plant Unit 2 Feedwater Nozzle Fracture Mechanics Analysis, Encl + (ML20093E325)
- ML20093E326 + (ML20093E326)
- ML20093E334 + (ML20093E334)
- ML20093E335 + (ML20093E335)
- ML20093E343 + (ML20093E343)
- ML20093E344 + (ML20093E344)
- ML20093E351 + (ML20093E351)
- ML20093E352 + (ML20093E352)
- ML20093E354 + (ML20093E354)
- NLS8400254, Forwards Schedule for Submittal of Addl Safety Parameter Display Sys Info,Per 840803 Request + (ML20093E360)
- ML20093E361 + (ML20093E361)
- ML20093E373 + (ML20093E373)
- ML20093E378 + (ML20093E378)
- SNRC-1090, Forwards Enhancements to Physical Security Arrangements Affecting General Motors-EMD Alternative Backup Ac Power Sources to Be Used During Low Power Operation.Enhancements Withheld + (ML20093E383)
- ML20093E384 + (ML20093E384)
- ML20093E385 + (ML20093E385)
- ML20093E386 + (ML20093E386)
- ML20093E388 + (ML20093E388)
- ML20093E391 + (ML20093E391)
- ML20093E398 + (ML20093E398)
- ML20093E405 + (ML20093E405)
- ML20093E407 + (ML20093E407)
- 3F0584-16, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/84-07.Corrective Actions:Manual Isolation Valves RCV-34,39,48 & 144 Opened & Operating Procedure OP-301 Revised to Leave Valves in Open Position + (ML20093E410)
- ML20093E411 + (ML20093E411)
- ML20093E423 + (ML20093E423)
- ML20093E424 + (ML20093E424)
- ML20093E429 + (ML20093E429)
- ML20093E432 + (ML20093E432)