ML20093E280
| ML20093E280 | |
| Person / Time | |
|---|---|
| Site: | 05200004 |
| Issue date: | 10/10/1995 |
| From: | Quinn J GENERAL ELECTRIC CO. |
| To: | Quay T NRC (Affiliation Not Assigned), NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MFN-211-95, NUDOCS 9510160154 | |
| Download: ML20093E280 (2) | |
Text
?
?
~~
GENuclearEnergy Janes E Quirm AdvancedReactor Programs Projects Manager. tMR and SBWR Programs GeneralElectnc Company 175 Curtner Ave.. M!C 165 San Jose. CA 95125-1DR8 408 925-1005. DialComm: 8'425-1005 fx 408 925-3991. Email: QuinnJ@ sjcpo2.ne ge.com October 10,1995 MFN 211-95 Docket 52-004 Document Control Desk U.S. Nuclear Regulatory Commission Washington DC 20555 Attention:
Theodore E. Quay, Director Standardization Project Directorate
Subject:
SBWR - Withdrawal of General Electric Presentation Charts from a August 18,1994 Meeting with the Nuclear Regulatory Commission (NRC) to Discuss NEDC-32391-P (Drall)
Reference:
- 1. Letter from Dino C. Scaletti to Mr. James E.Quinn (GE), Request for Withholding Information From Public Disclosure, General Electric (GE)
Presentation Slides for Meeting with the Nuclear Regulatory Commission (NRC)on August 18,1994, to Discuss NEDC-32391-P (Draft), dated August 9,1995.
- 2. Letter MFN 100-94 from P.W. Marriott (GE) to Richard. W. Borchardt (NRC), Slides Used at SBWR NRC Meeting 18 August,1994 to Discuss the SBWR Test and Analysis Program Description, NEDC-32391-P (Draft), dated August 18,1994.
In response to the NRC's Reference 1 letter, GE formally requests the withdrawal of the subject charts and the associated affidavit. This information was transmitted to the NRC in Reference 2. Please return these charts to GE or confirm that they have been disposed.
with in a manner appropriate for proprietary materials.
Sincerely, cc:
P. A. Boehnert (NRC/ACRS) (2 paper copies plus E-Mail)
I. Catton (ACRS)
(1 paper copy plus E-Mail.)
S. Q. Ninh (NRC)
(2 paper copies plus E-Mail)
J. II. Wilson (NRC)
(1 paper copy plus E-Mail)
D. C. Scaletti (NRC)
(1 paper copy plus E-Mail)
A. Drozd (NRC)
(1 paper copy plus E-Mail) 1E0018 9510160154 951010 F
()
PDR ADOCK 05200004 A
a i-MFN 100-95 bec: (E-Mail w/att. except as noted)
J. A. Beard P. F. Billig R. H. Buchholz T. Cook (doe)
(2 paper copies w/att. plus E-Mail w/att.)
' J. D. Duncan R.T.Fernandez (EPRI)
J. R. Fitch J. E. Leatherman J. E Quinn T. J. Mulford (EPRI)
(2 paper copies w/att. plus E-Mail w/att.)
P. E. Novak F..A. Ross (doe)
N. N. Fox B. Shiralkar R. Srinivasan (EPRI)
J. E. Torbeck GE Master File M/C 747 (1 paper copy w/att. plus E-Mail w/att.)
SBWR Project File (1 paper copy w/att, plus E-Mail w/att.)
4 l
.