Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20093B536 + (ML20093B536)
- ML20093B537 + (ML20093B537)
- ML20093B541 + (ML20093B541)
- ML20093B551 + (ML20093B551)
- ML20093B595 + (ML20093B595)
- ML20093B597 + (ML20093B597)
- ML20093B598 + (ML20093B598)
- ML20093B602 + (ML20093B602)
- ML20093B610 + (ML20093B610)
- ML20093B616 + (ML20093B616)
- ML20093B621 + (ML20093B621)
- ML20093B623 + (ML20093B623)
- ML20093B632 + (ML20093B632)
- ML20093B645 + (ML20093B645)
- ML20093B646 + (ML20093B646)
- ML20093B650 + (ML20093B650)
- ML20093B653 + (ML20093B653)
- ML20093B656 + (ML20093B656)
- ML20093B678 + (ML20093B678)
- ML20093B688 + (ML20093B688)
- ML20093B698 + (ML20093B698)
- ML20093B708 + (ML20093B708)
- ML20093B710 + (ML20093B710)
- NRC-84-0119, Forwards Rev 16 to FSAR for Wolf Creek + (ML20093B716)
- NG-84-4277, Submits Status & Schedule for Resolution of Work Performed for IE Bulletin 79-14 Re Rewalkdown of Piping Sys.Rewalkdown to Be Completed by 841031 + (ML20093B735)
- ML20093B747 + (ML20093B747)
- GL-700177-25, GLTS: Past Due General License Device Annual Registration - Clarcor, Inc., -(GL-700177-25) + (ML20093B763)
- ML20093B766 + (ML20093B766)
- TXX-4316, Forwards Response to Structural & Geotechnical Engineering Branch Request for Addl Info Re Questions 130.37,130.38 & 130.39 for FSAR Amend 53 + (ML20093B826)
- ML20093B829 + (ML20093B829)
- ML20093B846 + (ML20093B846)
- RBG-18940, Interim Deficiency Rept DR-187 Re CRD Hydraulic Lines.Next Rept Will Be Submitted by 841128 + (ML20093B855)
- ML20093B860 + (ML20093B860)
- ML20093B867 + (ML20093B867)
- 3F1084-08, Submits Requested Addl Info Re NUREG-0737,Item II.K.2.16 Concerning Reactor Coolant Pump Seal Cooling Sys Providing Adequate Cooling Upon Loss of Offsite Power,Per NRC 840829 Safety Evaluation + (ML20093B871)
- 05000328/LER-1984-017-02, :on 840906,during Startup,Reactor Tripped While Switching Control of Steam Generator Levels from Manual to Automatic.Caused by Reduction in Reactor Power to Slow Swell of Steam Generator 3 + (ML20093B884)
- ML20093B890 + (ML20093B890)
- ML20093B900 + (ML20093B900)
- ST-HL-AE-1135, Second Interim Deficiency Rept Re Commingling of Round Rod Matls.Initially Reported on 840430.Problem Limited to Rod Matl Mfg During Period When Matl Control Identification Indicated by Color Coding & Ribbon Striping + (ML20093B910)
- ML20093B926 + (ML20093B926)
- 3F1084-02, Application for Amend to License DPR-72,requesting Authorization to Continue Using once-through Steam Generator (OTSG) Drain Lines for OTSG Blowdown for Brief Periods of Time Above High Energy Line Threshold + (ML20093B929)
- ML20093B930 + (ML20093B930)
- ML20093B934 + (ML20093B934)
- ML20093B936 + (ML20093B936)
- ML20093B940 + (ML20093B940)
- 05000311/LER-1984-021, :on 840826,trip of Steam Generator Feed Pump 21 Resulted in Steam Flow/Feed Flow Mismatch on Steam Generators & Reactor Trip.Caused by Failure of Magnetic Speed pick-up Sensor.Sensor Replaced + (ML20093B941)
- ML20093B947 + (ML20093B947)
- ML20093B952 + (ML20093B952)
- ML20093B954 + (ML20093B954)
- ML20093B958 + (ML20093B958)
- ML20093B961 + (ML20093B961)