ML20093B846

From kanterella
Jump to navigation Jump to search
Responds to Noncompliances Noted in Insp Rept 50-220/84-10. Corrective Actions:Meteorological/Dose Assessment Computer Installed & Operational & Training of Supervisory Personnel in Computer Use Completed
ML20093B846
Person / Time
Site: Nine Mile Point 
Issue date: 10/01/1984
From: Mangan C
NIAGARA MOHAWK POWER CORP.
To: Martin T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
NUDOCS 8410100247
Download: ML20093B846 (3)


Text

et-,

7

& -Q ~
l T
  • w

~ NIAGARA MOHAWK POWER CORPORATION

~

MAGARA

' MOHAWK 300 ERIE BOULEVARD. WEST SYRACUSE N. Y 13202 October 1, 1984 Mr. - Thomas T. Martin,iDirector

. ' Division of-Engineering and Technical Programs United States. Nuclear Regulatory Commission

? Region Il 631 Park. Avenue

' King 1of Prussia', PA 19406'

.Re: Docket No. 50-220 Inspection Report 84-10

Dear Mr; Ma'rtin:

This refers to -the six (6) open items enclosed as Appendix B of your 7

1 August 1,1984 letter to Mr. B.G. Ilooten.

ITEM 50/220 84-10-01 llave the Safety Review and Audit Board (SRAB) include, as part

- of their scope, an audit of the emergency preparedness training-program.

RESPONSE

The Safety Review' and Audit Board (SRAB) will include as part of their scope, an audit of the emergency preparedness training program.

~This will be done in December 1984 as part of the annual emergency-preparedness audit-.

> ITEM 50/220 84-10-02.

- Adapt the computerized dose calculation model for initial dose assessment, use the nomogram only as a backup.

RESPONSE

. f The Meteorological / Dose Assessment computer is installed and operational.

.M

' !s

' Training of supervisory personnel in the use of the computer has been

-completed.. Training of back-shift Chemistry Technicians will be con-

> ~

ducted in October 1984.

Designation of the Meteorological / Dose Assessment Computer Model for initial dose assessment has been included in EPP-8 "On-Site and Off-Site

^e Dose Assessment Procedure" draft Rev 7.

SORC review and approval is expected 1 -

by October 9, 1984.

84f0100247 841001 PDR-ADOCK.05000220

([

PDR G -

>ile.

q;%;;. 33 -

q 2, 4

i W

.Page J

- Inspection Report 84-10.

ITEM 50/220 84-10 03 Develope a qualitative procedure for identifying potential lake breeze circulations and an. associated checklist of items to consider prior to protective action decisionmaking~.

-RESPONSE-This item was-included in EPP-8 "On-site and Off-site Dose Assessment Procedure" in' June 1984.

ITEM 50/220 84-10 Include in the revised calibration procedure ICP-WS1 (rev.0) and

'ICP-WS2 bottom line results,.specifically conformance with Environ-mental Technical Specifications (3.1).

Also, consider'the problems

- ' identified in LER 83-31 and manufacturers specifications.

RESPONSE ~

. Procedures S-ICP-WS1 and.S-ICP-WS2 have been revised to include bottom line results for conformance with Environmental Tech. Specs.

ITEM 50/220 84-10-05' a) Develop a. checklist for daily surveillance of hhe meteorological monitoring program, b) Synchronize the time (DST) on the meteoro-logical' strip charts (Control Room, ISC and Computer Building) with the time (EST) on the computer stored meteorological data. c) Adapt

~

a standard procedure for time,_date, signature, and condition entries in the maintenance log.

RESPONSE

Procedure S-IP-WS.(rev. 1, 9/4/84) has been published which provides

a checklist-for daily surveillance of the meteorological measurement system and suggested subjects of possible concern for entry in the station maintenance log. This procedure will be further expanded and published by October 15, 1984 to address time on recording devices.

ITEM 50/220 84-10-06 Consider changes-to the Emergency _ Plan for the NUREG-0654 criteria shown in Inspection Report 84-10 paragraph 3g.

6

,1.s.._.:

E

.c -

g.-

.c ~

=~

e.

s o7 s

. Page;..

Inspection Report.84-10;

RESPONSE..

4 NUREG-0654 criteria shown in Inspection Report.84-10 paragraph-3g.

~has been included in the Site Emergency Plan draft rev. 13.

SORC

-review and approval-is expected by October 9, 1984.

Very truly yours,.

C..V. Mangan Vice President-Nuclear Engineering and Licensing RGR/CVM/110.

I

~.

y r

(

s

[

(

+3 I'

L, x